Loading...
HomeMy WebLinkAbout7B, Master Plan for Lake Johanna Blvd - __LS Request for Council Action Prepared By: James Lehnhoff, Community Development Director Council Meeting Date: October 13, 2008 DRAFT Master Plan for the New lake Johanna Boulevard Budgeted Amount: $ Actual Amount: $ Funding Source: Planning & Zoning Recommendation: Motion to Accept the "Master Plan for the New lake Johanna Boulevard." Supporting Documents: 1. October 13, 2008, Memo to the City Council 2. Comments from the May 20,2008, Community meeting 3. Comments from the September 18, 2008, Community Meeting 4. Draft Master Plan for the New Lake Johanna Boulevard - if not attached it is available online at www.cLarden-hills.mn.us. - ~HILLS MEMORANDUM DATE: October 13, 2008 TO: Mayor and City Council , J ames Lehnhoff, Community Development Director DRAFT Master Plan for the New Lake Johanna Boulevard FROM: SUBJECT: Reauested Action Motion to Accept the "Master Plan for the New Lake Johanna Boulevard." Plannin2: Process At the end of November 2007, the City instituted a moratorium on development and redevelopment in the B2 Zoning District in order to create a long-term redevelopment vision for this area. The B-2 Zoning district includes those properties on County Road E between Highway 51 and Lexington Avenue, on Connelly Avenue, and Pine Tree Drive. Significant progress has been made since last November and particularly since May. With great assistance from the community and the steering committee, a master plan that addresses the complex issues of transportation, land use intensity, appearance, accessibility, and long-term viability has been drafted. Over a series of seven steering committee meetings and two community meetings, the Master Plan was devised and drafted. The materials presented at each of the steering committee meetings are available online at www.ci.arden-hills.mn.us/smallareaplan. In addition to the steering committee involvement, the City Council reviewed the plan on September 15 during a work session, the Economic Development Commission reviewed the draft on September 17, and the Planning Commission reviewed it on October 1. The steering committee held their final meeting on October 7 where they unanimously agreed to forward the draft Plan to the City Council for official review and acceptance. The planning process included evaluating existing conditions, creating a long-range redevelopment vision and guiding principles, addressing transportation questions, evaluating market potential, reviewing land uses, and drafting design guidelines. The draft Plan includes a City of Arden Hills City Council Meeting for October 13, 2008 \\Ahdocs1\ah\AHdata\Planning\Community Development\B2 Small Area Plan \Meetings \ Oct 13 CC Meeting\101308 - CC Report - Master Plan for New Lake Johanna Boulevard.doc Page 1 of 6 range of recommendations and an implementation plan. If the Plan is accepted by the City Council, the design guidelines will be the first item that is implemented. Redevelopment of the properties at the northwest and southwest intersection of County Road E and Lexington Avenue is almost certain. This draft Master Plan will be instrumental in moving forward a community vision on how this and other redevelopment and enhancement can occur in the study area. It is very important to note that this Plan is not designed or intended to remove any of the existing businesses or tenants. This is a long-range Plan that will be driven by market conditions over a period of time. The Plan includes principles, design guidelines, and public improvements to help the City be more proactive and better prepared for when redevelopment on private property naturally occurs. Notable Findin2:s and Recommendations The guiding principles, findings, and recommendations in the draft plan are based on the information collected at the May 20 community meeting (Attachment A), the steering committee meetings, and the technical information prepared by the consultants). The notable findings and recommendations in the draft plan include: . The plan has set the stage for consensus on public and private improvements that will help achieve the development potential of Arden Plaza, the former Holiday Inn site, and other sites as they pursue redevelopment. That is, the committee, affected landowners, staff and consultants have generally agreed in principle on site plans and revised access design that will allow a moderate amount of redevelopment on the Arden Plaza site with manageable short-term traffic impacts. Longer-term, a scheme is proposed to allow further development on both the Arden Plaza and Holiday Inn sites using a signalized intersection at a new location on County Road E. County Road E is proposed to be redesigned as a landscaped boulevard with a central, landscaped median that will focus the left-turn movements, improve traffic safety, greatly enhance appearances and set the tone for private redevelopment. The redesign of the County Road will also introduce a pair of bicycling lanes, a greatly needed addition. A connection over Highway 51 to provide a safer pedestrian and bicycle crossing is included, which could be an addition to the existing bridge, a whole new bridge, or a separate pedestrian and bicycle bridge. The plan calls for the enhancing of the pedestrian connections along County Road E and to the property. Comprehensive set of design guidelines for both private and public improvements will help ensure a high quality of physical improvements . . . . . City of Arden Hills City Council Meeting for October 13, 2008 \ \Ahdocsl\ah\AHdata\Planning\Community Development\B2 Small Area Plan \Meetings \ Oct 13 CC Meeting \ 1 01308 - CC Report - Master Plan for New Lake Johanna Boulevard.doc Page 2 of6 · The land use plan calls for moving beyond several outmoded developments and using land in ways that are more consistent with the important role that this corridor may play in Arden Hills. · Overall, the plan guides the way for the next major step in the evolution of the corridor from "County Road E" to "Lake Johanna Boulevard" and a stronger sense of community center. · A detailed copy of the traffic study report is available upon request. Ramsey County has been consulted in the redesign of their road but additional conversations will be needed as implementation moves forward. · A preliminary cost estimate for a complete package of traffic, streetscape, pedestrian and bicyclist improvements along the new Lake Johanna Boulevard was prepared and totals $2.0 million. (That includes $0.5 million for a ped-bike addition to the existing bridge over Minnesota Highway 51.) · The citizens advisory committee has been closely involved every step of the way and supports the draft plan. Although prior meetings have referred to this as the B2 District Small Area Plan, the working title is the "Master Plan for the New Lake Johanna Boulevard." There are not any technical differences between a small area plan and a master plan. Illustrative Master Plan Figure 6 on page 4-11 of the draft Master Plan displays the Illustrative Master Plan. The purpose of the Illustrative Master Plan is to visually demonstrate a way the principles and design guidelines in the Master Plan could be applied to redevelopment as it occurs over time. The private redevelopment will be driven by market conditions, so there is not a set timeline for when redevelopment would occur on any particular property. Since redevelopment is privately driven, the final layout of buildings is likely to be different than what is shown on the illustration. This draft Master Plan is in no way a Planned Unit Development (PUD) approval of any type for any potential development. Each development will still go through the required PUD review process, which includes a public hearing with the Planning Commission and City Council review. The Illustrative Master Plan demonstrates one possible layout for the buildings and is purely conceptual. The conceptual building layout does not commit the City to approving any particular design when an actual development occurs. Public Improvements The proposed public improvements in the draft Plan are integral part of addressing the overall traffic situation from a comprehensive standpoint. In addition to addressing the traffic situation, the improvements are also meant to encourage private, high-quality redevelopment. This. draft City of Arden Hills City Council Meeting for October 13, 2008 \ \A hdocs 1\ ah \AHdata\Planning\ Community Development\B2 Small Area Plan \Meetings \ Oct 13 CC Meeting \ 1 01308 - CC Report - Master Plan for New Lake Johanna Boulevard.doc Page 3 of 6 Master Plan is essentially the feasibility study for the public improvements, though an engineering study would still be needed to fully evaluate the complete costs. As part of the engineering review, the City would also want to evaluate the underground utilities, which was not part of the scope of this project. The public improvements still rely on a number of factors including a more complete evaluation of the costs, working with Ramsey County, and going through the budgeting and financing process with Council. The public improvements in this Plan would be similar to the pavement management program (PMP) process. The City orders a feasibility/engineering study and evaluates financing, budgeting, timelines, engineering, etc. Chan2:es and Updates since the September 15tt 2008tt City Council Work Session Since the City Council reviewed the draft Plan at their September 15, 2008, work session, a number of updated have been made to the draft Plan based on comments from the community, steering committee, EDC, and the Planning Commission. The notable updates are as follows: · Guiding Principles. Added an eleventh principle encouraging green construction (LEED), conservation, and sustainability. Page 4-2. · Illustration Map Colors. The colors on Figure 6 were made more distinct. Page 4-11 · Illustration Map Changes. The illustration map was amended to remove the parking in the northwest corner of the Arden Plaza property to better reflect the overall design principles in the Plan. Page 4-11 · Road Name. The Plan now proposes to work with Shoreview to extend the Lake Johanna Boulevard name to Victoria Street. Page 5-3. · Highway 51 Ped/Bike connection. The proposed bicyclist bridge over Highway 51 has been updated to reflect that it is a pedestrian and bicyclist connection. Additionally, the connection could be a separate bridge, an addition to the existing bridge, or a whole new bridge with room for pedestrians/bicyclists. This was adjusted throughout the plan. · Building Illustration. Adjusted the illustration to include a less intense look for the buildings. Page 5-6. · Building Height. The reference to six story buildings has been removed and replaced with four stories. However, the City could consider taller buildings north of County Road E if there were sufficient road capacity and appropriate design, which would be assessed during the review process. This draft plan does not automatically authorize a height greater than four stories. Page 5-7. · Implementation Timeline. A description of the potential short-, mid-, and long-term actions for implementing the Plan has been included. Specific dates are not included because the process of implementation could vary depending on redevelopment and available funding. The first implementation step is amending the Zoning Code to include the applicable design guidelines. Page 7-4. City of Arden Hills City Council Meetingfor October 13, 2008 \\Ahdocsl\ah\AHdata\Planning\Community Development\B2 Small Area Plan \Meetings \ Oct 13 CC Meeting \ 1 01308 - CC Report - Master Plan for New Lake Johanna Boulevard.doc Page 4 of 6 The above points are reflected in the current version of the Master Plan. Project Purpose Review The City requested for a number of things in the planning process, including: 1. A more defined long-term vision for the B2 District that is realistic and primarily market driven; 2. A preliminary market analysis to help understand what type of development is likely to occur in this area in the future and be successful; 3. A better understanding of the traffic situation and potential improvements to help address the traffic situation; 4. Design guidelines to advance that vision; 5. An implementation guide. There will undoubtedly be more discussion and a need for more detail about how the vision should be accomplished over time, but this draft Plan is meant to be an overall guiding plan. The City now has an idea of what the steps should be and a more uniform idea of what needs to be done to help ensure that the community, for both residents and business, benefits from a viable commercial district. There are some hurdles to overcome and the Plan is likely to be adjusted over time as needed by the City and the market. Since the City doesn't own the land, it is a balancing act of public good, cost, and the private market. Remainin2: Schedule and Next Steps The remaining schedule for this project is as follows: · November 5, 2008 - Planning Commission reviews Design Standards Ordinance Amendments for the B2 Zone · November 24, 2008 - City Council reviews and approves the Design Standards Ordinance Amendments for the B2 Zone · December 5, 2008 - B2 District Moratorium Expires · Continue Implementation Discussion, Planning, and Budgeting Recommendation Staffrecommends accepting the "Master Plan for the New Lake Johanna Boulevard." Upon review of Roberts's Rules of Order (10th Edition pp 489-491), the words accept, adopt, and agree are equivalent. By using the word accept, it is still adopting the report and recommendations in the report as a whole. The report is still considered a draft and, if needed, City of Arden Hills City Council Meetingfor October 13, 2008 \ \Ahdocs 1\ ah \AHdata\Planning\ Community Development\B2 Small Area Plan \Meetings \ Oct 13 CC Meeting\101308 - CC Report - Master Plan for New Lake Johanna Boulevard.doc Page 5 of 6 changes to the report can be included with a motion to accept. Should conditions or opportunities change in the future, the City can still amend the report to ensure that it is meeting the goals of the City. Finally, accepting the report does not commit the city to a specific implementation or funding schedule but it does lend support to moving forward with the overall vision and actions in the plan. As an alternative, the motion could be revised to state, Motion to Implement the Short-Term Summary of Actions in the Master Plan for the New Lake Johanna Boulevard. Using this motion does not preclude the City from moving forward with the rest of the report or the other actions, but it does limit the immediate actions to the short-term summary of actions on page 7-4. A motion to implement the actions does not put the design guidelines, zoning changes, or other recommendations into place. The actions will still follow the normal review and approval process. In order to implement the overall vision of the Plan; however, the mid- and longer-term summary of actions would need to be addressed in the future. Attachment A. Comments from the May 20, 2008, Community meeting B. Comments from the September 18,2008, Community Meeting C. Draft Master Plan for the New Lake Johanna Boulevard - if not attached it is available online at www.ci.arden-hills.mn.us. City of Arden Hills City Council Meeting for October 13, 2008 \ \Ahdocsl\ah \AHdata\Planning\ Community Development\B2 Small Area Plan \Meetings \ Oct 13 CC Meeting\101308 - CC Report - Master Plan for New Lake Johanna Boulevard.doc Page 6 of 6 Attachment A Comments from the May 20, 2008, Community meeting October 13, 2008, City Council Meeting Comments from the Mav 20. 2008. Community Meetina: Weaknesses Scum on pond, brings mosquitoes Doesn't draw strangers to existing businesses Low Patronage by majority(?) of residents Retail trending to downscale/vacancies/transient (6) Ugly Bingo Parlor, bingo traffic (3) Poor mix of businesses, needs grocery store, needs variety, small businesses (8) Existing business are struggling (2) Large existing businesses are unlikely to want to change, or difficult to redevelop compatibly (2) Lack of good restaln"ants/dining/neighborhood cafe/ethniclhealthy (9) Lack of night time activity Weak potential for residential/mixed use Lack of residential housing to make it feel more like a downtown Rail makes residential uses unattractive Architecture is blah and uninteresting, no public square, lack of diversity (3) Not attractive buildings, blank walls, too much asphalt (3) Setbacks are inconsistent - no real "flow" visually on E2 Somewhat chaotic visually, lacks obvious plan, especially on north side of E (3) Needs more continuity architecturally, non- uniform architecture, needs harmony ( 4 ) Arden Plaza needs a new look, better signage, outdated office pods (4) Lack of community gathering spot, central park (2) No gateway entrance identification, bad signage (2) No cultural or art attractions More Green, trees, etc (2) Needs decorative lighting (3) Too many parking lots right on County Road E No Access to Public Transit (3) Area is not bicycle and pedestrian friendly, needs more connectivity through City, especially from west, few sidewalks and bike paths (15) Lack of sidewalk on north side of E (2) No designated bike trail, better bike access through city (5) Poor pedestrian'bike access across 51, bad bridge, too narrow, unsafe (14) Lousy/unsafe access for vehicles, turning onto Lexington is difficult, poor circulation (3) Traffic in and out of Arden Plaza and internal circulation is bad (3) Heavy traffic, too much, especially during rush hour (8) Too many access points, curb-cuts (3) 51 and E is a dangerous intersection (2) 82 Small Area Plan - May 20, 2008 1 Curve at Pine Tree Drive is dangerous Train that goes every hour on the ~ hour backs up traffic (3) Strengths University students use the district Existing businesses already in place and known, centralized (3) Variety/Mix of businesses, good shopping (10) Serves some consumer needs, serves local needs (2) Nice business district Lower density of businesses Small family businesses, local, neighborhood retail, useful, small town fee\ no big box stores, unique (22) Variety of office space and employment opportunities (2) Historically this was the main business area for Arden Hills Arden Plaza, hardware store, pharmacy, post office (7) Convenient banking (2) Source of good tax income for Arden Hills Accessibility via arterial streets and from neighborhoods (3) Retail shops within walking distance of neighborhoods Easy access to neighborhoods, centrally located (4) Ease of access for pedestrians, bikers, and autos, manageable traffic (4) Some pedestrian sidewalks Decent parking Possible light-rail future opportunities Central to other commercial development, large chains on Lexington (2) Good access from Snelling Avenue and 1-694 and Lexington Avenue (9) Traffic flows well except at rush hour, good amount of traffic (2) County Road E can support development, four lanes, turn lanes (3) The area is well defined, has a beginning and end Large area and can accommodate a variety of uses Small town layout, residential feel, quite side streets (3) Area has a pattern of development that can be built upon Most existing development does not directly conflict with obvious future plans Strong community feel and quaintness, friendly, meet neighbors (3) Relatively calm visually Buildings are setback from street, not right on the street Stability Railroad tracks create natural division of land uses Has redevelopment opportunities and open areas Aged in such a way that it is close to turning over Two large parcels on prime comer Little in the area that needs to be preserved Narrow street and bridge Banners on light poles 82 Small Area Plan - May 20, 2008 2 Open green space, landscaping, and mature trees (9) Quality parks nearby, undeveloped areas, and trails (3) Close to beach Need to include environmental concerns and impact in planning future development Wide street has potential for landscaping or boulevard Opportunities Keep all the property on the tax rolls Make retail areas more accessible by pedestrian and bike traffic, from all directions, safe crossings (8) Promote ease of access for pedestrians, bikes, and autos (2) Prominent bike paths, sidewalks or walking paths on both sides of street (5) Circulator bus for area No more than 2-3 curb cuts into business sections, put a frontage road to limit access points, particularly Mr. Movies and TCF (3) Alter Curb cuts to more "street-like" elevation (not up over sidewalks) Better street circulation Four-lane Bridge, with pedestrian walkway and bike lane (8) Better turn lanes or roundabout (3) Add right hand turn lane from northbound Snelling/Hamline to east bound Co Rd. E Two lanes each way on Lex. South of E Right turn lane from eastbound Co Rd. E to southbound Lex. Two left turn lanes from eastbound Co Rd. E to northbound Lex Right turn lane from southbound Lex to westbound Co. Rd. E Circulation road behind Flaherty's and Corp Express so buildings can be closer to E. Lower speed limits Traffic hub with mass transit to major metro access; hub to include retail and service shops to support those utilizing mass transit Plan with Shoreview for a transit hub/depot with structured parking on NE comer of Co Road E and Lexington. Keep traffic down No trucks Limit traffic congestion Extend Connelly Ave across railroad track to connect with Grey Fox Road Parking behind stores (3) Parking structure up against the railroad to preserve the Co. Rd. E frontage On-Street parking (3) Some residential mixed in with retail Encourage and support businesses that citizens want as part of their "neighborhood" (2) Neighborhood businesses on north side of the street Viability of Grand Avenue 82 Small Area Plan - May 20, 2008 3 Retail Office Supply Variety of service stores and retail (3) Nice upper end shops Home improvement retail Anchor store such as Costco (no Walmart) (2) Post Office Small Businesses/restaurants, Unique restaurants, inexpensive, ethnic, Small specialty shops: bakery, coffee, book store, Asian take-out, clothing, gifts, drugstore, toy store, green products store, ice cream, shoe repair, cleaners (7) Small scale neighborhood commercial with a common architectural theme Food: Co-op, farmers market, interesting restaurants, real restaurants, sit-down, neighborhood bar/cafe - but not a chain, more wine selection (6) A Sweet Tomatoes Restaurant Trader Joe's (2) Someplace to have real ice cream cones - not soft serve Keep pharmacy and Ace Hardware No big box retail (3) Replace Bingo Hall with dining or motel or housing Close down bingo hall Farmers market in Arden Plaza parking lot Remove octagon buildings and replace with not "cutsie" small businesses visible from all sides (no Walgreens, CVS, or Bigbox) Holiday in as conference center/community center (3) Holiday Inn converted to senior housing project within current building Mixed use on Holiday Inn site (residential above community/retail/office/services) (2) Mixed-use, including residential (3) Should have a multi- use zone so that residential could be mixed with the retail Consider needs of local corporations; Boston Scientific, Land-o-Lakes, Deluxe, etc. Put library where bingo hall is and have food and gathering place Move City hall to Arden Plaza/general area (2) Ramsey County library portal Consiler public purpose for Arden Plaza - library? Some kind of community plaza where people can gather - town square Community Park A focus place where people can eat and gather, public meeting areas or room in old holiday inn hotel Community bulletin board Divided roadway with landscaping Wide boulevards for pedestrian walkways, landscaping (8) Multi- use sidewalk north of Co Road E and west of Lexington Avenue and safe crossing areas to cross Lexington Walks and trails should compliment the existing trail system Uniform trees and street lights (2) Pedestrian friendly square, fountain, occasional street vendors (2) 82 Small Area Plan - May 20, 2008 4 Good landscaping, pleasant surroundings, outdoor patios, water Signs along Snelling for Northwestern College Improve park and hockey rink size/access Change name of County Road E to.. . community choice Continued small town feel, Arden Hills community identity (3) People friendly amenities Low Building profile, no building taller than 3 stories (2) Outdoor art Large setbacks Buildings that architecturally flow together, that do not "age", blend with environemnt (7) Quality architecture, not franchise architecture Gateway signage Work together with Shoreview to improve the corner aesthetically; trees, sidewalk, landscaping, use of retail space Mix of business and landscaping Maintain trees and green spaces (5) Utilize wind mill structures around community Plan for green or LEED design in all housing types 82 Small Area Plan - May 20, 2008 5 Attachment B Comments from the September 18, 2008, Community Meeting October 13, 2008, City Council Meeting Comments from the September 18. 2008. Community Meetina: Lights timed to 35 mph +. Do not slow beyond the 11" lanes. Left turns allow V-turns. Some residents are young and can drive. Will business owners, etc., on County Road E be made responsible in clearing snow from sidewalks? No enforcement now. More dangerous to walk in winter now. It is known ifbusiness people, etc., want to come to and stay in this area of redevelopment - don't want empty buildings in long run. Need sidewalks and biking space on Harriet and Pine Tree Drive. Improve the safety of the curve on Pine Tree Drive. Need to "soften" Harriet and Pine Tree to reduce through traffic. I like all that I'm hearing. I just wish it could happen sooner. I hope the bike bridge can be TOP priority and happen very soon (3-5 years)! Thanks - great plan. A format similar to Arbor Lakes in Maple Grove would be nice. An environment to keep the residents of Arden Hills shopping and spending money in our own community. Also better places for our youth to be employed at, where they currently look for employment in Shoreview, New Brighton and Roseville. Pot-Q-Gold space - changed to industrial condos overlooking Snelling. Let's not wait too long to do this. As the residents of Arden Hills age, we need to look at what makes Arden Hills enticing for young people to move here. Loved the ideas in the presentation. The zone will never become highly used by pedestrians no matter what improvements are made. Please keep pedestrian-centric designs from hindering traffic patterns and from costing us tax money. Adding a signal would hinder traffic flow too much!! Arden Plaza users can always use Lexington for an easier exit, none is necessary here on County 82 Small Area Plan - September 18, 2008 1 Road E. I like the boulevard plan and the emphasis on creating a sense of place. I recognize that developing places for dining, etc., is a private development; however, I would like to see small, unique shops and dining encouraged through the design. Open space! ! Gathering areas. I would like to see this project move ahead without being impacted by the development of the TCAAP property. Upscale dining would be nice. Thank you for your work. I would really reconsider high density - none that close to railroad tracks. Who would want to live there? Outdoor dining should be more upscale and private! More like Tria in North Oaks (not in front of street). It is obvious that a lot of great thinking and planning has gone into this. If the planning principles and guidelines as stated in the paper and also this evening, it will all be on the right track. Everything is good - community, grocery, a place to gather, announcing the arrival to a special place, etc., is great. One item - think about a local adult daycare facility, where we can leave an elderly person while we come to shop and dine. Have you seen the construction area on Hwy 81 in Robbinsdale by North Memorial? I like it! Your suggested improvements mirror that design. I like the idea of mixed use buildings along the street - for all retail or service businesses at street level with residential or business on second floor. It seems like this would encourage pedestrian activity on the street - more lively, not so barren. Pedestrian traffic across Hwy 51 should be a priority. Seems like the city is on the right path with these ideas and plans. We want to see some upscale senior housing - to move the Arden Hills empty nesters out of their houses to free them up for new families. Any green technology options? 82 Small Area Plan - September 18, 2008 2 One or two mid-size (or small) pedestrian plazas - places to linger, eat and drink, as well as just passing through. Say where Mr. Movies used to be in Arden Plaza. Must do something for safe pedestrianlbicycle access across Hwy 51 bridge - ASAP! ! After laying down minimum standards for new buildings, specify that for city approval of any particular proposal, in addition to meeting all the minimums, the design must include "something extra," above the minimums (some extra quality/qualities/features/etc.) so we don't wind up with an area that meets the minimums but seldom rises above them. In other words, "good enough" is not good enough for approval. Would like to see as much permeable surfacing as possible, to minimize runoff and associated Issues. Recreational locations for residents - those in NDR? What about ''being'' someplace - a gathering place to arrive to, not just drive by. Outdoor dining? Community places? Stoplights might stop traffic rather than make it smoother. Retail should be up closer to the street for better visibility. County Road E - will county consent? RCWD - what do they have to say? Housing next to train? Property owners in Shoreview - to open space zoning. Starting with street improvements would help bring private sector redevelopment. Some concerns about additional traffic on Pine Tree and Harriet - with more density on Lake Johanna Blvd. Street lights on Harriet. Crossing at Lexington needs improvements. How will left-turn loss be coordinated with businesses? Traffic flow through N/S and E/W of Arden Plaza and North Park? Pedestrian connection from Harriet to Arden Plaza! ! 82 Small Area Plan - September 18, 2008 3 Improved traffic and pedestrian at Harriet and Lexington - no light now. Street lights on Harriet Avenue - pedestrian scale. 82 Small Area Plan - September 18, 2008 4 Additional Comments :: The first floors of any new retail and office buildings fronting E or Lexington must be at street level or very close to it. Or for such buildings with long frontages for individual occupancies, at street level on average for each occupancy. This must apply to frontage on Lexington as well as County Road E. This will improve aesthetics and make accessibility possible. :: No parking or pavement between street and new buildings within 100 feet of street for any new buildings fronting E or Lexington. :: Era-appropriate street and lot lights. No "ye olde" gaslight repros as has Roseville on its otherwise modern city campus. Let's look at lamps that cast light only downward as done at the new Costco in Maplewood. :: Reconsider giving up traffic flow for the sake of treed medians. Instead, have thin ribbons of curbing to limit left turns while accommodating the backup of people in vehicles lined up on E back to Pine Tree as they wait to turn north on Lexington from County Rd E(LJB). The curbing would be placed to limit left turns along LJB, and to create left turnlanes where necessary. In the places west of Pine Tree where left turn lanes aren't necessary, treed medians could go there. :: Require walkable green space, including benches and shade trees, as some percentage of redeveloped space, to be installed with the first redeveloped building on each developer's land. Such green space would not include rain garden space or end caps at the end of rows of parking. So as to encourage use by all, such spaces be separate and distinct from outdoor spaces used by businesses for their customers. :: No backlit signage on the street side of new buildings within 100 feet of the street edge. :: Eliminate from the plan trees along Lexington in front of Catholic Charities. That property is already leafy and pastoral. Any trees there would only serve to obscure the view of the sign they recently installed. Attachment C Draft Master Plan for the New Lake Johanna Boulevard Available online at: http://www.ci.arden-hills.mn.us/ October 13, 2008, City Council Meeting