HomeMy WebLinkAbout7H, CP Rail Bridge & Old Hwy 10 Trail ~ ~HILLS Request for Council Action Prepared By: Kristine Giga, Civil Engineer Council Meeting Date: December 8, 2008 Motion to Receive the Feasibility Report for the Old Snelling Avenue/Old Highway 10 Trail and Authorize Staff to Expand the Scope of Services with Bolton & Menk, Inc. to Include Final Design of CP Rail Bridge Improvements for a Pedestrian Crossing in an amount not to exceed $37,000 Budgeted Amount: $37,000 Actual Amount: $37,000 Funding Source: Special Revenue Park Fund Recommendation: 1. Receive the Feasibility Report for the Old Snelling Avenue/Old Highway 10 Trail 2. Authorize Staff to Expand the Scope of Services with Bolton & Menk, Inc. to Include Final Design of CP Rail Bridge Improvements for a Pedestrian Crossing in an amount not to exceed $37,000. Supporting Documents: 1. Memorandum from staff dated December 4, 2008. 2. Feasibility Report prepared by Bolton & Menk, Inc. ~ MEMORANDUM DATE: December 4, 2008 TO: Mayor and City Council Ron Moorse, City Administrator FROM: Kristine Giga, Civil Engineer Michelle Olson, Parks and Recreation Manager Greg Hoag, Public Works Director SUBJECT: Future Snelling/Old Highway 10 Trail with Improvements to CP Rail Bridge for Pedestrian Crossing BACKGROUND At the September 8, 2008, meeting, the City Council authorized staff to contract with Bolton & Menk, Inc. to complete a feasibility report for the future Snelling/Old Highway 10 trail with improvements to the CP Rail Bridge for a pedestrian crossing. Bolton & Menk, Inc. staff presented preliminary results of the feasibility report at the November 25,2008, Parks, Trails and Recreation Committee (PTRC.) Topics of discussion included proposed typical cross-sections and potential trail locations, as well as associated impacts and costs. Improvements to the CP Rail Bridge were also discussed. A copy of the completed feasibility report is attached. Representatives from Bolton & Menk will attend the City Council meeting to present the results. The next step in the process is for the City Council to receive the feasibility report and to provide direction on how to proceed with this project. Improvements to the CP Rail Bridge are currently included in the Capital Improvement Plan for 2010. In order for improvements to be completed in the 2010 construction season, the planning and design should occur in 2009. It is anticipated that it will take approximately a year to work through the approval process with the railroad. Staff recommends utilizing Bolton & Menk, Inc. for this work, as they have familiarized themselves with the project area \ \M etro- inet. us\ardenhills\P R&PW\Engineering \2008\Counci 1_ Actions\ 12 -8-08M emo _ CPRai 1_ T rail_ Feasibility Report.doc 12/4/2008 Page 2 during the feasibility report preparation, and have reinitiated contact with Canadian Pacific Railroad on behalf of the City. FINANCIAL IMPLICATIONS The feasibility report states the estimated cost for improvements to the bridge and associated trail construction to match into existing conditions is about $220,800. The engineering, which is included in the total cost, is estimated at $37,000 and should be added to the 2009 budget. We have asked Bolton & Menk to provide us with a scope of services and more detailed breakdown for the design engineering. The costs to complete design for the bridge improvements will be paid for out of the Special Revenue Parks Fund. RECOMMENDED COUNCIL ACTION Receive the Feasibility Report for the Old Snelling Avenue/Old Highway 10 Trail and authorize staff to expand the scope of services with Bolton & Menk, Inc. to include final design of CP Rail Bridge improvements for a pedestrian crossing in an alTIOunt not to exceed $37,000.