HomeMy WebLinkAbout1D, Public Works Staffing
~
~HILLS
Request for Council Action
Prepared By: Ron Moorse, City Administrator
Council Meeting Date: December 15, 2008
Public Works Staffing
Budgeted Amount:
$0
$0
Funding Source:
Not Applicable
Actual Amount:
Supporting Documents:
1. See the attached memo from Ron Moorse dated December 15, 2008
2. Charts - Workers per 10,000 Residents and Workers per Sq Mile
~
EN HILLS
MEMORANDUM
DATE:
December 15, 2008
TO:
Mayor and City Council
FROM:
Ron Moorse, City Administrator
Greg Hoag, Public Works Director
SUBJECT:
Public Works Staffing
Back2round
At the time of Jim Perron's retirement from the Public Works Superintendent position, the City
had eight Public Works maintenance workers and the Superintendent. Since that time, the City
has been operating with seven maintenance workers and an acting superintendent.
The reduced staffing level has caused difficulties in scheduling crews for daily maintenance
projects. This became a greater problem recently when the crew was split to create an evening
shift for skating rink flooding. The reduced staff also creates an on-going concern regarding the
ability to handle multiple emergency situations, such as a water main break at the same time as a
significant snow fall. While these multiple events are difficult with a full complement of staff,
they are even more difficult with a reduced staff.
A recent water main break was repaired just in time to enable the crew to be available for snow
and ice control activities. We were also fortunate that a recent sewer line repair project did not
coincide with a significant snowfall. In addition, regardless of other emergency situations, the
current reduced staffing level could result in a lower service level in terms of maintenance of
trails and ice rinks in the aftermath of a significant snowfall.
As a way to measure whether the City's Public Works staffing level is adequate, inadequate, or
excessive, the City's staffing level was compared to the staffing level in similar cities in the
metro area. To provide a means of comparison, the staffing levels were compared in relation to
the area of each city in square miles, and in relation to each city's population; both of which are
indirect measures of the amount of infrastructure in the cities. The attached graphs show the
comparative relationships for the group of 13 cities. The graphs show that the Arden Hills
staffing level is below the average in relation to both population and area.
12/12/2008
Page 2
Based on the staffing comparisons, the City's staffing level is reasonable. Based on the City's
maintenance needs, the staffing level is necessary. Both from a short term perspective, and
looking ahead to the broad range of activities to be completed during warmer weather, it is
important that the staffing level is retained at eight maintenance workers and a superintendent.
Service demands continue, and mandates continue to increase, such as mandates regarding the
inspection and maintenance of storm water facilities. These require the City to retain an
adequate staffing level.
Recommendation
Authorize a maintenance worker hiring process.
~~
~
.~
~
<9 .<?O
r~ ~
~ (9
~~ ~
/~<9 9~
0'),
~~ .....-....
Vo ~o L.()
~~~ ~ f'-
~
~ '-"""
.~ a>
~6) ~~ C>
ro
.~ '-
a>
Q) ~ >
- V,,- <C
.-
:E .o~ ~ I
C- ~o
en ~ a>
s.. ~~ ~
Q) 0-
0. ~6) C/)
tJ) .IY '-
s.. ~ a>
Q) ~ 90 0..
~ ~~ v<Sl en
s.. '-
0 ~ ~ a>
~
3: <9 '-
o~ ~) 0
S
~ I
6)
9'<9)
tv~
/6) ~
~<Sl
&
~ \S' <9
<9~ ~
o~
~
&
~1y
LO 0 LO 0 L.() 0 LO 0 LO 0 V<9
~ ~ ('I) ('I) C\I C\I ~ ~ 0 0 ~""p,
~~
~<S)
.JY
~
<S) .~
7~ ~
~ ~
~~ ~
/,,~ 9o~ ....-....
<>'~ co
C")
U'~ ex:>
~b ~o CD
~y~ ~ C)
CO
~ '-
U) .~ CD
..... ~<S) ~~ >
c:: <(
CI) .~ I
-C fa
--
U) v-2 (f)
+-'
CI) .o~ ~ c
~ ~o CD
0 ~ :2
(f)
0 CD
0 ~~ 0::
~
0 ~<S) 0
~ .JY 0
0
s... ~ 0
CI) ~ 90 ~
C. <9~ V<S) '-
~ ~ ~ CD
C.
CI) <S) (f)
o~ ~> '-
.S&:: CD
s... ~
0 ~ '-
0
~ <S> $
7'~> I
......
, ,
tv~
/<S) ;y
~<S)
Q>
,I\S'~
~~ ~
o~
~
&
~1y
0 0 0 0 0 0 0 0 0 V<S)
CO ~ N 0 ex::> CO ~ N 0 :O~p..
~ ~ ~ ~