HomeMy WebLinkAbout4C, Bolton & Menk Contract
~
~HrLLS
Request for Council Action
~
Prepared By: Kristine Giga, Civil Engineer
Council Meeting Date: February 9, 2009
Authorize staff to contract with Bolton & Menk, [nc.for final design ofCP Rail Bridge
improvements for a pedestrian crossing in an amount not to exceed $37,000
Budgeted Amount:
$37,000
Actual Amount:
$37,000
Funding Source:
Special Revenue Park Fund
Recommendation:
1. Authorize staff to contract with Bolton & Menk, Inc. for final design of CP Rail
Bridge improvements for a pedestrian crossing in an amount not to exceed $37,000
SUPDortin!! Documents:
1. See the attached memo from City staff.
2. Proposal from Bolton & Menk, Inc. dated January 6, 2009.
3. Memo from Bolton & Menk, Inc. summarizing conversations with CP Rail dated
February 3, 2009.
~
EN HILLS
MEMORANDUM
DATE:
February 5, 2009
TO:
Mayor and City Council
Ron Moorse, City Administrator
FROM:
Kristine Giga, Civil Engineer
Michelle Olson, Parks and Recreation Manager
Greg Hoag, Public Works Director
SUBJECT:
CP Rail Bridge improvements for a pedestrian crossing
BACKGROUND/DISCUSSION
During the fall of 2008, Bolton & Menk, Inc. prepared a feasibility report for the future Snelling/Old
Highway 10 trail with improvements to the CP Rail Bridge for a pedestrian crossing. A preliminary
report was presented to the Parks, Trails and Recreation Committee (PTRC) on November 25, 2008,
and the final feasibility report was presented to City Council at the December 8, 2008 City Council
meeting.
At the January Work Session, the City Council discussed the project and how to proceed; in
particular, how to determine on which side to build the bridge improvements. The PTRC will
discuss this in detail at their February meeting, and make a recommendation to the City Council.
Bolton & Menk will continue to work with CP Rail through the final design process, providing the
needed detail and information for the review/approval process.
Attached is a memorandum from Bolton & Menk, which summarizes the discussions they have had
with CP Rail to date; the memo provides some answers to questions previously asked by the City
Council.
FINANCIAL IMPLICATIONS
The costs to complete design for the bridge improvements will be paid for out of the Special Revenue
Parks Fund. Attached is the proposal submitted by Bolton & Menk describing the scope of services.
RECOMMENDED COUNCIL ACTION
Authorize staff to contract with Bolton & Menk, Inc. for final design of CP Rail Bridge
improvements for a pedestrian crossing in an amount not to exceed $37,000.
\\Metro-inet.us\ardenhills\Admin\Council\Agendas & Packet Information\2009\02-09-09 Regular\Packet Information\4C
Memo _ CPRail_ FinalDesign.doc
E3C)LTC)N & N1ENK, INC@
Consulting Engineers & Surveyors
12224 NicoHetAvenue · BurnsviHe, MN 55337
Phone (952) 890-0509. Fax (952) 890-8065
www.bolton-menk.com
January 6, 2009
Ms. Kristine Giga, P.E.
Civil Engineer
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112-5743
RE: Proposal for Professional Engineering and Surveying Services
CP Rail Trail Underpass Improvements
City of Arden Hills, Minnesota
Project No.: Tl 6.1 00325
Dear Ms. Giga:
Weare pleased to offer you our proposal for professional engineering and surveying services for the final
design of the CP Rail Trail Underpass Improvements along Old Highway lOin Arden Hills. This
proposal is based on those improvements described in our December 2008 Preliminary Engineering
Report for the Old Snelling A venue/ Old Highway 10 Trail, which was presented to the City Council on
December 8, 2008. As a part of this proposal, we describe our understanding of the project, detail our
proposed scope of \vork, and provide our fee for completing the work.
Final Design Services
As a part of the Preliminary Engineering Report for the Old Snelling A venue/ Old Highway 10 Trail,
Bolton & Menk discusses the possibilities of constructing a trail along Old Highway 10 with an underpass
crossing the existing CP Rail bridge. The recommended approach is to construct a bituminous trail
crossing under the bridge, between its piers and abutment. This approach would require the construction
of retaining walls at the crossing and along the north and south approaches to the crossing. The crossing
is illustrated in Figure No. 15 of the preliminary engineering report. At this time, it has not been decided
on which side of Old Highway 10 the underpass will be constructed. However, design and construction
of the underpass relative to each side of the roadway is expected to be similar.
Once the desired side of the roadway is selected for the underpass, Bolton & Menk will complete the
necessary topographic survey, final design and engineering required to prepare final construction plans
and specifications for contractor bidding. The topographic survey will be completed from the road edge
or curb to a point approximately thirty feet outside the road, and will extend approximately 200' to the
north and 200' to the south of the rail bridge. Locations and measurements of the applicable above-grade
geometry of the rail bridge, including the piers, abutments, clearance heights, etc. will also be recorded to
facilitate the underpass design. A Gopher One Call will also be initiated to identify any underground
utilities within the project area. Bolton & Menk, along with LHB as its structural engineering
subconsultant, will prepare detailed construction plans in CAD illustrating plan and profile views of the
underpass and its approaches (up to 200' in each direction). Cross sections win also be shown along with
all other necessary details required for the retaining wall designs. If the west side of the road is chosen
for the construction of the trail underpass, it is anticipated that a future structural boardwalk will need to
be constructed adjacent to the pond south of the railroad as part of the overall trail improvements. Design
of this underpass improvement would stop short of this future boardwalk design. /t is anticipated that the
City of Arden Hills will secure a separate contract for geotechnical exploration services requiredfor this
project. Bolton & Menk will work with the City's preferred geotechnical consultant to identify the
required scope of exploration work.
Permit applications will be completed as required. Permit fees would be paid for directly by the City.
The project will be adve11ised, bids will be taken, and recommendation will be made to accept or reject
bids. Meetings included during final design include up to two (2) City Staff meetings for design review,
two (2) meetings with CP Rail, and one (1) City Council meeting for final plan presentation.
It is anticipated that the review and approval process governed by CP Rail for this project may be
considerable and that the final design schedule will be subject to this process. However. \ve anticipate
construction of this project to start no later than the 2010 construction season.
Final DesiRn Fees
Bolton & Menk will serve as the lead consultant in completing the final design for the CP Rail Underpass
Improvements, with LHB serving as our structural engineering subconsultant. Our total fee to conlplete
the scope of work as described above is a lump sum amount of $37,000.
Upon the City's approval of this proposal, we will prepare a final design agreement for execution. Please
call if you wish to discuss this proposal. We look forward to providing these professional engineering
and surveying services to you on this project and appreciate the continued opportunity to serve the City of
Arden Hills.
Sincerely,
BOLTON & MENK, INC.
1I1(JA~
~tt.L-
Marcus A. Thomas, P.E.
Associate Engineer
Cc: Mark D. Kasma, P.E., BumsvilIe Office Manager
E3<:::)L T<:::)N & IV1 EN K, I NC@
Consulting Engineers & Surveyors
12224 Nicollet Avenue · Burnsville, MN 55337
phone (952) 890-0509 -Fax (952) 890-8065
www.bolton-menk.com
MEMORANDUM
Date: February 3, 2009
To: Kristine Giga, P.E., Civil Engineer
Cc: Marcus Thomas, P.E., Project Manager
From: Travis Winter, P.E., Project Engineerji--J
Subject: Trail / C.P. Rail Bridge
City of Arden Hills
BMl Project No.: T16.100325
The following is a summary of the correspondence with Canadian Pacific Railroad that occurred
regarding construction of a pedestrian facility under the bridge that crosses Old Hwy lOin Arden Hills:
· October 6, 2008 - Phone Conversation: Charlie Duffy (CP Rail Stnlctural Engineer), Travis
Winter. I called Mr. Duffy to discuss the City's potential interest in constructing a pedestrian
crossing under the above referenced bridge. He was aware that the City had been looking at this
from previous conversations with City Staff and consultants. We discussed how this bridge was
similar to the one in New Brighton over Old Hwy 8 where a pedestrian crossing was constructed
previously. Replacement of the Arden Hills bridge is not a part ofC.P.'s 10 year capital
improvement plan. C.P. is willing to allow a crossing to be constructed as long as it does not
interfere with the structural integrity of the bridge.
· Decelnber 30, 2008 - Phone Conversation: Charlie Duffy (CP Rail Structural Engineer), Travis
Winter. I called Mr. Duffy to discuss potential cost sharing of a bridge replacement with the City.
Mr. DuffY stated that any cost sharing with the City would not be enough to move up the
replacement schedule of the bridge, there are too many other projects with higher priority. C.P..
will work with the City to make a crossing happen. To move forward in the process, send design
plans to C.P. for review. Send plans to Mr. Duffy and he will distribute to the appropriate
personnel for review. Construction of the crossing in 2010 is a reasonable goal.
- January 30, 2009 - Phone Conversation: Charlie DuffY (CP Rail Structural Engineer), Travis
Winter. The wooden bridge over New Brighton Road in Arden Hills is not on C.P.' s 10 year
._capital impr_ovement plan. There are. no_bridges on that rail line . scheduled for replacement in the__
next ]0 years. The New Brighton Road bridge was 'driven' (piles were driven) in the 80's, and
the deck was replaced 7 or 8 years ago. The bridge is in good shape. The railroad has no
preference as to which side the crossing is constructed, whichever side makes the most sense for
the City will be fine.
F :\_ Civil\ARDH\ Tl61 00325\Corres\memo _020309 .doc
DESIGNING FOR A BETTER TOMORROW
Bolton & Menk is an equal opportunity employer.