Loading...
HomeMy WebLinkAbout4C, Lift Station #7 Update ~ ~LLS Request for Council Action ~ Prepared By: Greg Hoag, Public Works Director Council Meeting Date: April 27, 2009 Authorize Staff to purchase two new 10 horsepower submersible pumps from Electric Pump Company located in Bloomington MN, for a cost not to exceed a total of $18,500 for both pumps, plus the cost of a licensed electrician to perform the electrical change over in the control panel, to be reimbursed by Presbyterian Homes per the agreement of2008. Budgeted Amount: $0 Actual Amount: $18,600 Plus Electrical Work Funding Source: Sanitary Sewer Utility Fund To Be Reimbursed Authorize Staff to purchase two new 10 horsepower submersible pumps from Electric Pump Company located in Bloomington MN, for a cost not to exceed a total of $18,500 for both pumps, plus the cost of a licensed electrician to perform the electrical change over in the control panel, to be reimbursed by Presbyterian Homes per the agreement of2008. Supporting Documents: 1, Memo from Greg Haag dated April 27, 2009 ~ l!\1lIIIIS MEMORANDUM DATE: April 27, 2009 TO: Mayor and City Council Ron Moorse, City Administrator FROM: Greg Hoag, Public Works Director SUBJECT: Lift Station 7 Pump Purchase BACKGROUND At the April 20, 2009 Council Work Session, the pump issues at Lift Station #7 were discussed with Council. Both of the existing "chopper" pumps are in need of major repair. These repairs are estimated to cost $11,900 for each pump. The cost to replace each of these pumps with a new "chopper" pump would be $18,600. Because the cost to repair each pump is well above 50% of the cost of replacement, it is recommended the pumps be replaced rather than repaired. Staff has consulted with several pump vendors, as well as an engineer with Bolton and Menk, regarding the issues with the pumps at this lift station, and regarding an optimal solution. It has been determined that the "chopper" pumps are not an adequate solution for this lift station. Regular submersible pumps and an in-line grinder are a better solution to treat the materials being discharged from Presbyterian Homes. Based on the above information, Council directed that the purchase of the two 10 HP regular submersible pumps be placed on the April 27 Council meeting agenda, as part of the overall solution which involves the installation of an in-line grinder to pre-process the objectionable material being discharged by Presbyterian Homes. Staff will be sending a letter to Presbyterian Homes regarding the on-going issues, as well as to inform them of the payment needed for replacement of the current pumps, as per the agreement. Staff will also arrange for a meeting with representatives from Presbyterian Homes, the Mayor, and City Staff to discuss how and where to install an inline grinder, which will be the responsibility of Presbyterian Homes. REQUESTED COUNCIL ACTION Authorize Staff to purchase two new 10 horsepower submersible pumps from Electric Pump Company located in Bloomington MN, for a cost not to exceed a total of $18,500 for both pumps, plus the cost of a licensed electrician to perform the electrical change over in the control panel, to be reimbursed by Presbyterian Homes per the agreement of 2008.