Loading...
HomeMy WebLinkAbout4B, Planning Case 09-006 for Conditional Use Permit for 3900 Bethel Road ... ~HILLS Request for Council Action ~ Prepared By: Meagan Beekman Council Meeting Date: May 11, 2009 Approve Planning Case 09-006 for a Conditional Use Permit Amendment at 3900 Bethel Road based on the findings of fact and the submitted plans as amended by the two conditions as presented in the May 11, 2009, Report to the City Council. Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Recommendation: Approve Planning Case 09-006 for a Conditional Use Permit Amendment at 3900 Bethel Road based on the findings of fact and the submitted plans as amended by the two conditions as presented in the May 11, 2009, Report to the City Council. .........."'...................................................................................................u..................u............u.....u'"-u..UA.u.....~.........k.O,.O...............................................................~............................................u..................................~..................................................................................................................................u...........u........................................................................................................................................................................................................................................................................~....u...................................................................................................................................................................................~............................ Supportin!! Documents: 1. Memo from Megan Beekman 2. Planning Commission Minutes for April 8, 2009 3. Conditional Use Permit Amendment 4. April 8, 2009, Report to the Planning Commission - http://www.ci.arden-hills.mn.us ~ ~HILLS MEMORANDUM DA TE: May 11,2009 TO: Mayor & City Council FROM: Meagan Beekman, City Planner p 'a SUBJECT: PC #: 09-006 Bethel University Conditional Use Permit Amendment 3900 Bethel Road Request Consider a motion to approve Planning Case 09-006 for a Conditional Use Permit Amendment at 3900 Bethel Road based on the findings of fact and the submitted plans as amended by the two conditions as presented in the May 11, 2009, Report to the City Council. Back2round Bethel University operates ullder a CUP Master Plan. As the College comes forward with plans, they are reviewed against the Master Plan for consistency. While building plans consistent with the Master Plan only require a site plan review, those not included in the original plan must be approved through a CUP Amendlnent. In 2004, Bethel University submitted an application (Planning Case #04-010) for a CUP Amendment to install a temporary modular classroom building to serve as additional classroom space on the campus until the University Commons building was completed. The temporary modular classroom building is a single-story, 4,200 square feet building containing a central corridor and four 50-seat classrooms. It is located just north of Robertson Center in the northeastern portion of the campus. The Planning Commission recommended approval of that request at their May 5, 2004, meeting with the City Council subsequently approving the CUP Amendment at their May 24, 2004, meeting. Ci(V o.f Arden Hills Ci(v Council Meeting.for Ma)i 11, 2009 \\Jl1etro-inet.us\ardenhills\:PlanningIP/anning Cases 1]0 ()Y\oY-()()6 Bethel CUP Amendment (PC Approl'ed) \051 lOY - CC Report - Bethel CUP Amendment. doc Page 1 of 3 The University Commons building finished construction in March 2009, though Bethel University has submitted an application to retain the temporary classrooms until October 31, 2012, due to the financial constraints of setting up the new classrooms and moving the facilities.. An adjustment to the original CUP Amendment requires approval through an additional CUP Amendment.. The conditions of the original 2004 CUP Amendment would remain in effect, except for Condition H which originally required the classrooms be removed by May 2011, or when the University Commons building was completed, whichever came first (Attachment C). Findin2S of Fact The Planning Commission offers the following thirteen findings of fact for the City Council's consideration GeneralJ7indings: 1.. The applicant is proposing to extend the use of the temporary modular classroom building until October 31 , 2012.. 2. The classrooms are a permitted use in the B-1 Zoning District. 3.. The temporary modular classroom building meets all requirements of the Zoning Code. 4. The temporary modular classroom building was not included on Bethel University's CUP Master Plan, approved in Planning Case #96-026. A CUP Amendment and site plan review was required to amend the Master Plan to include the building. 5.. The temporary modular classroom building was originally approved through a CUP Amendment and site plan review in Planning Case #04-010. 6.. Adjusting the original CUP Amendment to extend use of the temporary modular classroom building requires another CUP Amendment.. 7. The terms of the original CUP Alnendment would continue to apply with the exception of Condition H, which will be rewritten on the new CUP Amendment to require removal of the temporary classroom building within three (3) years. On the Conditional Use Permit Amendment/Site Plan RevielV: 8.. Extending the use of the temporary modular classroom building is not expected to affect traffic or parking conditions. 9. Extending the use of the temporary modular classroom building will not produce any additional levels of permanent noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid, or solid waste. Temporary noise and dust may be created during demolition.. 1 0.. Extending the use of the temporary modular classroom building will not alter drainage patterns.. 11. Extending the use of the temporary modular classroom building is not expected to have any impacts on campus population or density. 12. The park dedication fee is not applicable to this application. City o.f Arden Hills City Council Meeting.for May 11 r 2009 \\I'v1etro-inel.us\ardenhilIs\Planning\Planning Cases\2()()9\09-()(}6 Bethel CUP Amendment (PC Approved) \051 109 - CC Report - Bethel CUP A mendment. doc Page 2 of3 13. Extending the use of the temporary modular classroom building does not conflict with the City's Comprehensive Plan or the intent of the Zoning Code Recommendation The Planning Commission reviewed Planning Case 09-006 and unanimously recommends approval (5-0) of the Conditional Use Permit Amendment based on the findings of fact and the submitted plans as amended by the following two conditions: 1. The applicant shall continue to abide by the conditions of the original conditional use permit amendment from Planning Case 04-010. 2. Condition H in the original CUP Amendment from Planning Case 04-010 shall be amended to read that the temporary modular classroom shall be removed no later than October 31, 2012. Options 1. Approve the proposal as submitted. 2. Approve the proposal with conditions. 3. Deny the application with reasons for denial. If the City denies the petitioners request, "... it must state in writing the reasons for the denial at the time it denies the request." 40 Table for additional information. Deadline for A2:encv Actions The City of Arden Hills received the completed application for this request on March 13,2009. Pursuant to Minnesota State Statutes, the City must act on this request by May 12,2009 (60 days), unless the city provides the petitioner with written reasons for and additional 60 day review period. The City may, with the consent of the applicant, extend the review period beyond the initial 120 days. Attachments A - Draft Planning Commission Minutes for April 8, 2009 B - Conditional Use Permit Amendment C - April 8, 2009, Report to the Planning Commission - http://www.ci.arden-hills.mn.us Ci~y 0.( Arden Hills City Council Meetingfor May 11? 2009 \ \Metro-inet.us \arden Iz ills \Planning\Planning Cases\2(}()<)\f)<)-()()n Bethel CUP Amendment (PC Approved)\05110<) - CC Report - Bethel CUP Amendment. doc Page 3 of3 Attachment A Draft Planning Commission Meeting Minutes From April 8, 2009 May 11,2009, City Council Meeting Draft Planning Commission Minutes - April 8, 2009 Plannin2: Case 09-006: CUP Amendment: Bethel University - Public HearinJ! City Planner Beekman presented that the applicant has requested a Conditional Use Permit Amendment to retain a temporary classroom building for a period of time not to exceed three years. She displayed an aerial photo of the site and explained in 2004, Bethel University submitted an application (Planning Case #04-010) for a CUP Amendment to install a temporary modular classroom building to serve as additional classroom space on the campus until the University Commons building was completed, or seven years, whichever came sooner. She advised that the building is completed and the college is now requesting to extend the use of the temporary classrooms for three years. She advised that staff is recommending approval of the request. All of the conditions from the original CUP would remain in effect with the exception of Condition H which would be amended. The conditions are as follows: A. Permittee shalJ abide by the conditions of approval as stated in the approved special use permit ('''SUP''), master plan and the subsequent special use permit amendments. B. Building permit plans shall be submitted to the Building Official a minimum of two (2) weeks before the planned start of construction. C. No construction shall begin before plans are approved by the Building Offici ale D. The temporary modular classroom building shall be located the necessary setback distance to meet Building and Fire Codes per approval of the Building Official. E. Openings in the Robertson Center shall be ninety (90) minute protected and Permittee shall verify this with the Building Official and Fire Marshall. F. Revised utility, grading, and erosion control plans shall be submitted to the City Engineer for approval prior to the issuance of building permits. G. Upon removal of the temporary modular classroom building, Permittee shall replant the area of the temporary modular classroom building or the area of the adjacent Kresge Courtyard to include up to fifty (50) caliper inches of trees to replace those removed during the installation of the temporary modular classroom building. I. Upon removal of the temporary modular classroom building, all of the footings shall be removed and the sod shall be restored. Condition H would be revised in accordance with the updated CUP Amendment to read: H. The temporary modular classroom building shall be removed within three (3) years of the approval of this Conditional Use Permit Amendment. Chair Larson clarified that the original use for the temporary classrooms was until the commons building had been completed. He advised that this would extend the use of the classrooms through 2012. Tom Trainer, Director of Facilities with Bethel University, stated he has been with the organization for two years. He advised that the commons building was recently opened and is a beautiful addition to the college and the community. He advised that the temporary classrooms would help in this difficult economic time so that further expansion plans could be placed on hold. Commissioner Reiff questioned if three years was sufficient. Tom Trainer thought that three and a half years would be most beneficial as the school thinks in summers and that extra summer would give them a great benefit. Chair Larson questioned the date currently stated on the request. City Planner Beekman reported the date as May 11, 2012. Chair Larson questioned if it would be beneficial to extend that date through the end of2012. Tom Trainer confirmed that extending this through October of2012 would be most beneficial. PUBLIC HEARING Chair Larson opened the Public Hearing at 7: 10 p.m. There being no public input, Chair LarS011 closed the Public Hearing at 7:11 p.m. Commissioner Thompson thought that an extension should be allowed through October 2012, in case the University needs the extra summer months. City Planner Beekman stated an amendment could be made to Condition H. She advised that staff had no objections to extending that request through October of 2012. Commissioner Holewa moved, seconded by Commissioner Modesette, to recommend approval of Planning Case 09-006, CUP Amendment for Bethel University, based on the nine conditions in the April 8, 2009 Planning Case report. Further discussion: Commissioner Modesette clarified that technically this would be a four year extension. Commissioner Reiff moved, seconded by Commissioner Holewa, to amend the motion to revise Condition H to state: The temporary modular classroom building shall be removed by October 31, 2012. The motion to amend carried unanimously (5-0). Commissioner Holewa commented that Bethel has been a good member of the community and has contributed to the community. The motion as amended carried unanimously (5-0). Attachment B Conditional Use Permit Amendment May 11, 2009, City Council Meeting STATE OF MINNESOTA COUNTY OF RAMSEY CITY OF ARDEN HILLS CONDITIONAL USE PERMIT AMENDMENT CASE NO. 09-006 1.0 Recitals. A. Bethel University, a non-profit institution of higher education ("Permittee"), located on the following real property in the City of Arden Hills, Ramsey County, Minnesota ("Arden Hills"): Those parts of Section 21,22,27, and 28, Township 30, Range 23, lying Westerly and Southerly ot the westerly and southerly right-at-way lines of State Trunk Highway No. 51 and Interstate Highway 694 lying northerly of the northerly right-ot-way line of the Canadian Pacitic Railroad Company and lying northerly and easterly of the northerly and easterly right-ot-way lines ot State Trunk Highway No.1 0, except the South ~ ot the Southeast ~ ot the Southeast ~ ot the Section 21, Township 30, Range 23, lying east ot the easterly line ot Highway No.1 0, according to the U.S. Government Survey thereof (herein the "Subject Property") B. On the 2nd day of March, 2009, Permittee submitted a completed application to Arden Hills requesting that its existing conditional use permit be amended to extend the use ot their temporary modular classrooms tor a period of time not to exceed three years ("Planning Case 09-006n) on the Subject Property. C. On the 8th day ot April, 2009, Planning Case 09-005 was reviewed at a public hearing by the Arden Hills Planning Commission. The Arden Hills Planning Commission considered the recommendations of the Arden Hills staff, the comments of the public and recommended approval of Planning Case 09-006 subject to certain conditions. 2.0 Approval of the Application. On the 11th day ot May, 2009, the Arden Hills City Council considered Planning Case 09-006, the recommendations of the Arden Hills Staff and Planning Commission, the effects ot the proposed amended conditional use on the health, safety, convenience and general welfare of the owners and occupants ot surrounding land and the community as a whole, and determined that the facts and circumstances ot this particular case warranted the granting of the amended conditional use permit subject to the following conditions: A. The applicant shall continue to abide by the conditions of the original conditional use permit amendment from Planning Case 04-010. These conditions are as follows: a. The Permittee shall abide by the conditions of approval as stated in the approved special use permit ("SUP"), master plan and the subsequent special use permit amendments. b. Building permit plans shall be submitted to the Building Official a minimum of two (2) weeks before the planned start of construction. c. No construction shall begin before plans are approved by the Building Official. d. The temporary modular classroom building shall be located the necessary setback distance to meet Building and Fire Codes per approval of the Building Official. e. Openings in the Robertson Center shall be ninety (90) minute protected and Permittee shall verify this with the Building Official and Fire Marshall. f. Revised utility, grading, and erosion control plans shall be submitted to the City Engineer for approval prior to the issuance of buiLding permits. g. Upon removal of the temporary modular classroom building, Permittee shall replant the area of the temporary modular classroom building or the area of the adjacent Kresge Courtyard to include up to fifty (50) caliper inches of trees to replace those removed during the installation of the temporary modular classroom building. h. The temporary modular classroom building shall be removed within seven (7) years or completion of the Student Life Center, whichever comes first. i. Upon removal of the temporary modular classroom building, all of the footings shall be removed and the sod shall be restored. B. Condition H in the original CUP Amendment from Planning Case 04-010 shall be amended to read that the temporary modular classroom shall be removed no later than October 31, 2012. 2 Dated: 11th day of May, 2009. CITY OF ARDEN HILLS By: Stanley D Harpstead Its: Mayor STATE OF MINNESOTA ) ) SS. COUNTY OF RAMSEY ) On this _ day of ,2009, before me, a Notary Public within and for said county, personally appeared Stanley Harpstead to me, known to be the Mayor of the City of Arden Hills, and he executed the foregoing instrument and acknowledged that he executed the same by authority and on behalf of the City of Arden Hills. 3 Bethel University By: Name: Title: } STATE OF MINNESOTA ) ) SS. COUNTY OF RAMSEY ) On this _ day of , 2009 before me, a Notary Public within and for said county, personally appeared , to me know to be the of , and s/he executed the foregoing instrument and acknowledged that s/he executed the same by authority and on behalf of the Bethel University. Notary Public Drafted By: Meagan Beekman, City Planner City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2009\09-006 Bethel CUP Amendment (PC Approved)\051109 CUP Amendment.doc 4 Attachment C Report to the Planning Commission From April 8, 2009. Available online at: http://www.ci.arden-hills.mn.us/planningcase~ May 1 I, 2009, City Council Meeting