HomeMy WebLinkAbout1D, Public Works Supervision & StaffingMEMORANDUM
DATE: October 19, 2009 Item LD
TO: Mayor and City Council
FROM: Ron Moorse, City Administrator
Greg Hoag, Public Works Director
SUBJECT: Public Works Supervision and Staffing
Public Works Supervisory Structure
At their December 15, 2008, meeting, the City Council discussed the vacant public works
superintendent position and whether that position should be filled or replaced with a working
foreman. In the interim, the Council directed that the first line supervisory position should be an
acting working foreman. Since that meeting, the public works maintenance operation has been
monitored and options for the supervisory structure have been reviewed.
Through this monitoring, it has been observed that the working foreman position can, in large
part, provide the daily work planning and coordination necessary for effective maintenance
operations, particularly if the Public Works Director maintains a close focus on the public works
maintenance operation. Therefore, it is recommended that the Public Works Department
supervisory structure be revised to reflect a working foreman position as the first level
supervisory position.
Public Works Staffing
The authorized Public Works maintenance staffing level is eight maintenance staff and a
supervisor. The current staffing level is seven maintenance staff and an acting working foreman.
With the resolution of the first line supervisor position, it is important to fill the eighth
maintenance worker position. While the maintenance staff has been able to accomplish its day-
to-day activities, there are a substantial number of activities that cannot be accomplished due to
lack of staff. The deferred maintenance will cause greater costs in the future as these activities
become larger projects, generate problems with higher cost solutions, and may become
emergency situations that pull staff away from planned activities. It is important that the
maintenance operation move beyond a reactive mode to a preventative and proactive mode that
enables maintenance activities to be accomplished more efficiently and effectively. This requires
both effective work planning and adequate staffing.
10/ 16/2009
Page 2
Following is a list of maintenance activities that could be done more efficiently and cost-
effectively if done proactively:
• Sewer line cleaning and root cutting: In addition to the goal of cleaning one third of the
sewer lines each year, which is nearly being met, more frequent attention also needs to be
paid to those areas with root problems, to avoid blocked lines and sewer back-ups. The
cost of a sewer back-up into a home is in the tens of thousands of dollars and causes a
major hardship for the homeowners.
• Preventative maintenance on sewer lift stations can prevent operational problems,
particularly emergency problems, including sewer back-ups.
• There are manhole castings that have sunk below grade and dirt has fallen into the
manhole or covered the manhole. These castings need to be repaired in a planned,
proactive way, rather than waiting until access is needed.
• Storm sewer structures and lines need to be cleaned regularly to avoid sediment build-up
that blocks the lines and can cause flooding problems.
• Trimming on trails and easement areas: If trimming is done regularly, it limits the
amount of trimming needed. But once the areas are overgrown, it becomes a major
project to trim the overgrowth back. Regular trimming also maintains a consistent
appearance and character.
• Trees along roadways need to be trimmed on a regular basis to avoid having to do major
trimming, and to avoid City trucks hitting branches, which can damage the lights on the
trucks, and also damage the trees, making them more susceptible to disease.
• Proactive trail maintenance and repair can prevent major deterioration, reduce higher cost
repairs, and extend the life of the trails
• Timely curb and gutter repair (i.e. when a segment is settling causing pooling of water)
addresses the water pooling problem, but also prevents damage from the water
undermining the curb and gutter causing more extensive damage and higher costs for
replacement.
• Ballfield fences require on -going repair to maintain appearance, and to avoid
deterioration to the point of needing replacement
• On -going park sign maintenance maintains appearance and avoids the need for total
repainting of the signs, which is a much more substantial project.
• Regular exercising of valves on hydrants and gate valves can ensure the valves are
working and are accessible, so that when it is necessary to close a valve it can be done
easily and quickly as opposed to finding that it is not accessible due to a build up of silt
or being rusted shut.
• Updating, correcting, and mapping the location of utilities infrastructure such as off -road
gate valves, which enables them to be easily and quickly located when work is needed on
them, whether in an emergency or non -emergency situation.
• While street sweeping is done regularly on a city-wide basis, there are wooded areas near
lakes that should be swept more frequently to protect water quality.
10/ 16/2009
Page 3
These activities need to be added to the activities currently being accomplished, but cannot be
added without full staffing. Attached are two reports showing the hours spent on the various
maintenance activities in 2009 through October 10. One report shows the hours of the full time
staff and the other report shows the hours of the seasonal staff.
Council Direction Requested
Direction regarding revising the Public Works Department supervisory structure to reflect a
working foreman position as the first line supervisory position, and direction regarding filling the
eighth maintenance worker position.
2009 Full Time Maintenance Staff
Hours by Activity
(Through October 10, 2009)
Snow & Ice Control
367.5
Paved Surface Maintenance & Repair
638
Vehicle & Equipment Repairs &
Maintenance
1234.5
General Turf Maintenance
741.5 I
Forestry
328
Garden Maintenance
359
Building/Structure/Facility/Maintenance
& Repair
496.5
Athletic Fields & Court Maintenance
1188
Sign & Signal Maintenance
120.5
Water System Maintenance & Repair
746
Water Service Maintenance (Meters,
etc.)
448.5
Sewer System Maintenance & Repairs
608.5
Lift Station Repair & Maintenance
1275
I&I Mitigation
159.5
Surface Water
Management/Environmental
441.5
Locates & ROW
Inspections/Maintenance
440.5
Time Off
1749.5
Training/Meetings
776.5
Special Project/Other
304.5
Supervision
905.5
Stand By/On Call
308
----------------
a: d Totai
13637
2009 Seasonal Maintenance Staff
Hours by Activity
(Through October 10, 2009)
Snow & Ice Control
0
Paved Surface Maintenance & Repair
58.5
Vehicle & Equipment Repairs &
Maintenance
87.5
General Turf Maintenance
1301.5
Forestry
210.5
Garden Maintenance
180.5
Building/Structure/Facility/Maintenance
& Repair
270.5
Athletic Fields & Court Maintenance
336
Sign & Signal Maintenance
165
Water System Maintenance & Repair
102.5
Water Service Maintenance (Meters,
etc.)
8
Sewer System Maintenance & Repairs
248
Lift Station Repair & Maintenance
12
I&I Mitigation
569.5
Surface Water
Management/Environmental
30
Locates & ROW
Inspections/Maintenance
7
Time Off
0
Training/Meetings
1
Special Project/Other
83
Supervision
0
Stand By/On Call
.......�
0
a .:_„
3