HomeMy WebLinkAbout12-09-09-PCChair
Clayton Larson
Commissioners
EN HILLS
1245 W. Highway 96
Arden Hills, MN 55112
Andrew Hotewa----A
651.792.7800
Liz Modesette
Daniel Reiff
Arden Hills
Www•ci.arden-hilis.mn.us
Janet Stodofa
Roberta Thompson
Planning Commission
Clayton Zimmerman
December 9, 2009
City Vision
A strong community that values our unique environment, our fiscalsoundness,
and our tradition as a desirable city in which to live, work, and play.
Agenda
Regular Planning Commission Convenes 6:30 PM
Call to Order
1. APPROVAL OF THE AGENDA
2. MINUTES
A. November 4, 2009
3. PLANNING CASES
A. Resolution 2009-001; Cottage Villas; Tax Increment District No. 3 Plan Modification — Not a Public Hearing
B. Planning Case 09-021; Arden Village; Rezoning, Comprehensive Plan Amendment, Preliminary and Fina!
Plat, Master and Final Planned Unit Development; Sand Companies, Inc. —Public Hearing
4. UNFINISHED AND NEW BUSINESS
5. REPORTS
A. Report from the City Council
B. Planning Commission Comments
6. ADJOURNMENT —The Planning Commission will Adjourn to a Work Session
A quorum of the City Council may be present at this meeting.
Planning Cases are available online at:
http://www.ci.arden-hills.mn.us/plannin cases
December 9, 2009
Planning Case Map
Ita.—
,,.--ARZEN HILLS
MEMORANDUM
DATE: December 9, 2009 PC Agenda Item 3.A
TO: Planning Commission
FROM: James Lehnhoff, Community Development Director
Sue Iverson, Finance Director
SUBJECT: Tax Increment District No. 3 Plan Modification (Cottage Villas)
ATTACHMENTS:
Requested Action
Consider approval of Resolution 2009-001 finding that a modification to the development
program for Development District No. 1 and a modification to the Tax Increment
Financing Plan for Tax Increment Financing District No. 3 conform to the
Comprehensive Plan for the development and redevelopment of the City.
Backiround
In 1993, the City of Arden Hills approved Tax Increment Finance (TIF) District No. 3 to
facilitate the development of Cottage Villas, which is a 60 unit apartment building for low to
moderate income seniors at 3744 Cleveland Avenue. The building was completed in 1994.
Along with federal housing tax credits, the TIF District was a primary component in financing
the project to create the affordable units. For the basics of TIF, please see the below section and
attachment B.
Under State Statute, a housing TIF District can be up to 25 years in length. However, the City
originally limited the Cottage Villas TIF District to 15 years because it was determined that the
financial contribution to Cottage Villas would be paid off within that time. The 15 year period is
completed in December 2009, and the City's contribution to Cottage Villas will have been
satisfied.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
\\Metro-inet.us\ardenhills\Planning\Economic Development\Business Subsidy & Public Financing\TIF\Cottage Villas\12-09-09 - PC Report -
Cottage Villas TIF Extension Memo.doc Page 1 of 4
Although the 15 year contribution to Cottage Villas will be completed, the City can extend the
Cottage Villas TIF District an additional ten years to the 25 year statutory maximum. If
extended, the revenue generated by the district could be used elsewhere in the community to
fund housing projects for low to moderate income households. Cottage Villas would not receive
any additional revenue from the TIF District. On October 12, 2009, the City Council adopted
Resolution 2009-028 to begin the process of modifying TIF District No. 3 to extend the district
an additional ten years.
The City Council will be holding a public hearing on December 14, 2009, to consider approval
of the TIF District extension. Prior to that, the Planning Commission must review the extension
to make a recommendation on whether the proposed extension is in compliance with the recently
adopted 2030 Comprehensive Plan. The Planning Commission is not evaluating the use of TIF
for any particular project, the merits of using TIF, or whether TIF should be used in the future.
Tax Increment Financing Basics
The State Statutes related to TIF are complex and have many different provisions. Abasic
outline that was prepared by the Minnesota Legislature explaining how and why TIF is used is
attached (Attachment B).
A TIF District basically uses a portion of the property taxes generated by the development to
finance the development. For example, assume that a property is generating $5,000 per year in
property taxes prior to being redeveloped. Then assume the property will generate $50,000 per
year in property taxes after redevelopment. A tax increment financing district essentially allows
a city to use the new increment of $45,000 to help finance the redevelopment. The original
$5,000 is still distributed to the appropriate taxing authorities, including the City, County, and
the school district. The information in Attachment B explains how the new increment is used to
cover the costs of development.
All TIF requests undergo a detailed financial analysis by the City to determine if and how much
public financing is needed for a project to move forward. Even if a project demonstrates a need
for public financing, using TIF is still at the discretion of the City. Cities are not obligated to use
TIF; however, it can be a powerful and flexible tool when used appropriately.
2030 Comprehensive Plan Review
As noted, the Planning Commission is being asked to determine if the TIF extension is in
conformance with the Comprehensive Plan. Revenue generated by the proposed TIF extension
could only be used to create low to moderate income housing. Chapter 7, Housing, of the Arden
Hills 2030 Comprehensive Plan includes the following goal and policies related to housing:
City of Arden Hills
Planning Commission Meeting for December 9, 2009
\\Metro-inet.us\ardenhills\Planning\Economic Development\Business Subsidy & Public Financing\TIF\Cottage Villas\12-09-09 - PC Report -
Cottage Villas TIF Extension Memo.doc Page 2 of 4
Goal. Develop and maintain a strong, vital, diverse and stable housing supply for all members of
the community.
To achieve this housing goal, the following policies are proposed:
o Promote the development of a variety of housing options by preserving and increasing high-
quality housing opportunities that are suitable for a mix of ages, incomes and household
types.
o Encourage the incorporation of affordable, life -cycle, and work force housing into new
development and redevelopment where feasible.
o Maintain the quality, safety, and unique character of the City's housing stock.
o Preserve and strengthen the community's neighborhoods to maintain a high-quality of life
for residents.
o Encourage housing development and redevelopment that is complimentary to and
enhances the character of the City's established neighborhoods.
The full 2030 Comprehensive Plan can be downloaded at www.ci.arden-hills.mn.us/compplan.
As part of the comprehensive planning process, the Metropolitan Council calculates target
numbers for the construction of new affordable housing units in all cities in the seven county
metropolitan region. The target number for Arden Hills is 288 new housing units by 2020 (this
number assumed that a portion of the Twin Cities Army Ammunition Plant would be used for
housing). The target number is calculated using a formula that considers such items as available
land, population growth, and job proximity.
Section 7.6 of the Comprehensive Plan Housing Chapter, Implementation Strategies, encourages
the City to pursue grants or other opportunities that promote the construction of affordable
housing. TIF is one of the tools that could be used to help the City achieve the target number for
new affordable housing units.
The City can only use the revenue generated by the TIF District for projects with the
Development District shown in Attachment A. The Arden Village proposal to construct 55
affordable apartment units at 1296 County Road F, which is within the Development District, has
requested TIF from the City to help finance the project. While the Arden Village request will
still need to undergo a detailed financial analysis, the revenue from the TIF extension could be
used for that project. Other eligible properties include future projects on the former City Hall
site at 1450 West Highway 96 and in the B2 Zoning District.
Recommendation
Staff recommends the approval of Resolution 2009-001. Given the goals and policies in the
2030 Comprehensive Plan, it can be concluded that the proposed TIF extension is in
conformance with the Comprehensive Plan. The 2030 Comprehensive Plan supports the creation
of new affordable housing units, and this TIF extension is a tool that could help advance that
goal.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
\\Metro-inet.us\ardenhills\Planning\Economic Development\Business Subsidy & Public Financing\TIF\Cottage Villas\12-09-09 - PC Report -
Cottage Villas TIF Extension Memo.doc Page 3 of 4
Options & Proposed Motion Lanua�e
1. Recommend Approval: Motion to recommend approval of Resolution 2009-001 finding that
a modification to the development program for Development District No. 1 and a
modification to the Tax Increment Financing Plan for Tax Increment Financing District No. 3
conform to the Comprehensive Plan for the development and redevelopment of the City.
2. Recommend Denial: Motion to recommend denial of Resolution 2009-001 finding that a
modification to the development program for Development District No. 1 and a modification
to the Tax Increment Financing Plan for Tax Increment Financing District No. 3 conform to
the Comprehensive Plan for the development and redevelopment of the City.
Deadline for ALYency Actions
This item is time sensitive. If the City decides to extend the district, it must be approved before
TIF District No. 3 expires at the end of 2009. This item must be forwarded to the City Council
for review at their December 14, 2009, meeting.
A ttn ch m Pn tc
A —Tax Increment Financing District No. 3 — 2009 Modifications Overview
B —Planning Commission Resolution 2009-001
C —Tax Increment Financing (TIF) Information Sheet from the Minnesota Legislature
City of Arden Hills
Planning Commission Meeting for December 9, 2009
\\Metro-inet.us\ardenhills\Planning\Economic Development\Business Subsidy & Public Financing\TIF\Cottage Villas\12-09-09 - PC Report -
Cottage Villas TIF Extension Memo.doc Page 4 of 4
Attachment A
Tax Increment Financing District No. 3 —
2009 Modifications Overview
'It,
EN HILLS
December 9, 2009, Planning Commission Meeting
ax Increment Financing District Overview
City of Arden Hills
Development District No. 1 and Tax Increment Financing
District No. 3 - 2009 Modifications
The following summary contains an overview of the basic elements of the Modification to the
Development Program for Development District No. 1 and the Modification to the Tax Increment
Financing Plan for Tax Increment Financing District No. 3. More detailed information on each of these
topics can be found in the complete Development Program Modification and Tax Increment Financing
Plan.
Proposed Action: Modification to the Development Program for Development District No. 1
• Update the Development Program's statement of objectives (introduction)
and budget
Modification to the Tax Increment Financing Plan for Tax Increment
Financing District No. 3:
• Extend the term of the TIF District to its statutory maximum duration to
enable the City to continue in its efforts to support low and moderate
income housing opportunities
• Increase the budget to reflect the extended term, actual development and
associated obligations
• Bring the TIF Plan into conformance with current Office of State Auditor
requirements and legislative changes
• This modification does not enlarge the geographical area of the TIF
District
Type of TIF Existing housing district
District:
Maximum Pursuant to M.S., Section 469.176, Subd. lb, the duration of the District will
Duration: be 25 years after receipt of the first increment by the City (a total of 26 years
of tax increment). The date of receipt by the City of the first tax increment
was July, 1994. Thus, it is estimated that the District, including any
modifications of the TIF Plan for subsequent phases or other changes, would
terminate after December 31, 2019, or when the TIF Plan is satisfied. The
City reserves the right to decertify the District prior to the legally required
date.
....... .............
-f -AS. -Al -0 D.I.F. IE DDECE l4i� 29
. . . . . . . . . . . . ........ ....
HILLS
EN
CRY, of Arden Hills
Development Dist i.c.t.". No. 1
Dee Di-Shict N0. 1
TIF DisM c -t-4-3.
0: 0.2: .0-5, lh-Illes
Map Created: October., 2-009
Attachment B
Planning Commission Resolution
2009-001
,2t
�R�E1�1 HILLS
December 9, 2009, Planning Commission Meeting
� DEN HILLS
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. 2009-001
RESOLUTION OF THE CITY OF ARDEN HILLS PLANNING COMMISSION
FINDING THAT A MODIFICATION TO THE DEVELOPMENT PROGRAM
FOR DEVELOPMENT DISTRICT NO. 1 AND A MODIFICATION TO THE TAX
INCREMENT FINANCING PLAN FOR TAX INCREMENT FINANCING
DISTRICT NO. 3 CONFORM TO THE COMPREHENSIVE PLAN FOR THE
DEVELOPMENT AND REDEVELOPMENT OF THE CITY.
WHEREAS, the City of Arden Hills has proposed to adopt a Modification to the Development
Program for Development District No. 1 (the "Development Program Modification"), and a Modification
to the Tax Increment Financing Plan for Tax Increment Financing District No. 3 (the "TIF Plan
Modification") therefore (the Development Program Modification and the TIF Plan Modification are
referred to collectively herein as the "Modifications") and have submitted the Modifications to the City
Planning Commission (the "Commission") pursuant to Minnesota Statutes, Section 469.175, Subd. 3, and
WHEREAS, the Commission has reviewed the Modifications to determine their conformity with the
general plans for the development and redevelopment of the City as described in the 2030 Comprehensive
Plan for the City.
NOW, THEREFORE, BE IT RESOLVED by the Commission that the Modifications conform to the
general plans for the development and redevelopment of the City as a whole.
Dated: December 9, 2009
Chair
ATTEST:
Deputy Clerk
Attachment C
Tax Increment Financing (TIF)
Information Sheet from the Minnesota
Legislature
'It
EN HILLS
December 9, 2009, Planning Commission Meeting
HOUSE RESEARCH Short Subjects
Joel Michael
Tax Increment Financing
Updated: January 2008
What is TIF? Tax increment financing (TIF) uses the increased property taxes that a new real
estate development generates to finance costs of the development. In
Minnesota, TIF is used for two basic purposes:
• To induce or cause a development or redevelopment that otherwise would
not occur e.g., to convince a developer to build an office building, retail,
industrial, or housing development that otherwise would not be constructed.
To do so, the increased property taxes are used to pay for costs (e.g., land
acquisition or site preparation) that the developer would normally pay.
• To finance public infrastructure (streets, sewer, water, or parking facilities)
that are related to the development. In some cases, the developer would be
required to pay for this infrastructure through special assessments or other
charges. In other cases, all taxpayers would pay through general city taxes.
How does TIF When a new TIF district is created, the county auditor certifies (1) the current
work? net tax capacity (i.e., property tax base) of the TIF district and (2) the local
property tax rates. As the net tax capacity of the district increases, the property
taxes (i.e., the "tax increment") paid by this increase in value is dedicated and
paid to the development authority. The tax increment is limited to the tax
derived from the certified tax rate. Increases in value that generate increment
may be caused by construction of the development or by general inflation in
property values. The authority uses the increment to pay qualifying costs (e.g.,
land acquisition, site preparation, and public infrastructure) that it has incurred
for the TIF project.
How is TIF used to There is a mismatch between when most TIF costs must be paid at beginning
pay "upfront" of a development and when increments are received after the development is
development costs? built and begins paying higher property taxes. Three basic financing techniques
are used to finance these upfront costs:
Bonds. The authority or municipality (city or county) may issue its bonds to
pay these upfront costs and use increment to pay the bonds back. Often,
extra bonds are issued to pay interest on the bonds ("capitalizing" interest)
until increments begin to be received.
Interfund loans. In some cases, the authority may advance money from its
own funds (e.g., a development fund or sewer and water fund) and use the
increments to reimburse the fund.
Pay-as-you-go financing. The developer may pay the costs with its own
funds. The increments, then, are used to reimburse the developer for these
costs. This type of developer financing is often called "pay-as-you-go" or
"pay -go" financing.
What governmental Minnesota authorizes development authorities to use TIF. These authorities are
units can use TIF? primarily housing and redevelopment authorities (HRAs), economic
There were over
2,000 active TIF
districts in 2005
District type
development authorities (EDAs), port authorities, and cities. In addition, the
Maximum
duration
"municipality" (usually the city) in which the district is located must approve the
Redevelop blighted areas
TIF plan and some key TIF decisions. TIF uses the property taxes imposed by
Renewal and
renovation
all types of local governments. But the school district and county, the two other
15 years
ma j or entities imposing property taxes, are generally limited to providing
Encourage manufacturing and other
footloose industries
comments to the development authority and city on proposed uses of TIF. The
Housing
state -imposed tax on commercial -industrial and seasonal -recreational properties
25 years
is not captured by TIF.
What is the but -for
Before an authority may create a TIF district, it and the city must make "but -for"
test?
findings that (1) the development would not occur without TIF assistance and
(2) that the market value of the TIF development will be higher (after
subtracting the value of the TIF assistance) than what would occur on the site, if
TIF were not used.
What types of TIF
Minnesota allows several different types of TIF districts. The legal restrictions
districts may be
on how long increments may be collected, the sites that qualify, and the
created?
purposes for which increments may be used vary with the type of district.
There were over
2,000 active TIF
districts in 2005
District type
Use of Increment
Maximum
duration
Redevelopment
Redevelop blighted areas
25 years
Renewal and
renovation
Redevelop areas with obsolete uses, not
meeting blight test
15 years
Economic
development
Encourage manufacturing and other
footloose industries
8 years
Housing
Assist low and moderate income housin
25 years
Soils
Clean up contaminated sites
20 years
According to the 2006 report of the Office of State Auditor, there were 2,204
active TIF districts in 2005. The graph shows the relative shares by type of
district.
Redevelopment
(992)
TIF Districts by Type in 2005
(2,204 districts)
Housing
Renewal (24)
Special Laws (6)
Soils (30)
Pre -1979 (61)
Economic Development
(580)
Source: 2006 Report of the State Auditor
For more information: Contact legislative analyst Joel Michael at 651-296-5057. Also see the House
Research web site for more information on TIF at www.house.inil/hrd/issinfo/tifinain.htm.
The Research Department of the Minnesota House of Representatives is a nonpartisan office providing legislative,
legal, and information services to the entire House.
House Research Department 1 600 State Office Building I St. Paul, MN 55155 1651-296-6753 1 www.house.mn/hrd/hrd.htm
Ito.-
�RZEN HILLS
MEMORANDUM
DATE: December 9, 2009 PC Agenda Item 3.B
TO: Planning Commission
FROM: Meagan Beekman, City Planner
SUBJECT: Planning Case #09-021
Arden Village, LLC (Jamie Thelen)
1296 County Road F
Conditional Use Permit Amendment, Master and Final Planned Unit
Development (PUD), Preliminary and Final Plat, Rezoning, and
Comprehensive Plan Amendment
ATTACHMENTS: A — Application and Supporting Materials
B — Letter of Support
C — Section 1325.08 Design Standards Review
D — Aerial and Photographs of the Site
E — Plans and Surveys
Requested Action
The applicant is requesting approval of the Conditional Use Permit Amendment, Master and
Final Planned Unit Development (PUD), Preliminary and Final Plat, Rezoning, and
Comprehensive Plan Amendment of the property located at 1296 County Road F.
Background
At the City Council's August 17, 2009, work session, Sand Companies, Inc (SCI) presented their
concept for a four-story, 55 -unit, workforce housing development at 1296 County Road F and
requested a letter of support from the City as they attempted to secure housing tax credits from
the Minnesota Housing Finance Agency (MHFA). As part of the letter of support, the developer
asked the City Council to identify ways in which the City would be willing to provide assistance
City of Arden Hills
Planning Commission Meeting for December 9, 2009
llMetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PCReport - Arden
Village.doc Page 1 of 14
in order to close the financing gap left by the affordable housing component of the project. The
Council's letter of support is included with this packet (Attachment B).
Sand Companies, Inc has secured a purchase agreement for the property and has since submitted
a request to the MHFA for tax credits. They will be notified by the end of January 2010 if they
will receive the tax credits; however, they are moving forward with the planning review process
and are seeking Planning Commission and City Council approval of their application. The
request for City financial assistance will be reviewed separately.
The proposal requires the property to be rezoned from the current I-1, Limited Industrial District,
to R-4, Multiple Dwelling District. In order to rezone the property, the City's future land use
map in the 2030 Comprehensive Plan must also be amended to reflect the new Multiple Family
use for the property, which is currently identified as Utility in the City's Comprehensive Plan.
This requires Metropolitan Council approval as well as City approval. In addition to the
rezoning of the property and the Comprehensive Plan Amendment, the applicants are also
requesting a Preliminary and Final Plat to subdivide the property into two parcels, and a Master
and Final PUD for the development itself.
The property currently operates under a Conditional Use Permit (CUP) that was approved in
1972. Because the CUP encompasses the entire property it will need to be amended as well to
reflect the proposed legal description for the subdivided lot. The City Council will hold the
public hearing for the CUP Amendment because notice was not published in time for this
meeting; however, the applicant is requesting the Planning Commission recommend approval of
the CUP Amendment at this time.
Project Proposal and Process
1. Planned Unit Development (PUD) Process:
The PUD process is a tool that provides additional flexibility for developments that an
underlying zoning district would not otherwise allow. For example, a PUD may change the
setbacks, lot coverage, lot sizes, parking requirements, building height, building materials,
landscaping requirements, etc. Additionally, the PUD process allows the City to negotiate
certain aspects of the development to help achieve City goals. With any development, the
conditions imposed on the project must have a rational basis related to the impacts of the
development. The process is meant to create a better development than the standard
regulations may otherwise allow. While each PUD process is unique, it is a common process
used by many cities. The PUD process cannot be used to permit uses that would not
otherwise be permitted in the underlying zone.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc
Page 2 of 14
2. Project Description
The 2.76 acre site currently includes a communications tower and a 1,600 square foot
equipment building on the south side of the lot. The applicant proposes to subdivide the
property into two lots and maintain the existing tower and equipment building separate from
the housing development.
The proposed four-story building would consist of 55 housing units with one to three
bedrooms, a 55 stall underground parking garage, and a 55 stall surface parking lot. The
development would include a tot lot playground and picnic area for residents. As part of the
park dedication requirement, the applicant is proposing to construct an approximately 1,680
foot trail along the south side of County Road F that connects their property with the
sidewalk Land O' Lakes completed last year, which connects to Lexington Avenue. The
details of this trail are still being worked out with the County and the developer.
This proposal technically includes seven requests:
1. Conditional Use Permit Amendment of CUP 72-024
2. Comprehensive Plan Amendment to amend the 2030 Comprehensive Plan Future
Land Use map designation of the property from "Utility" to "Multiple Family"
3. Rezoning from I-1 to R-4
4. Preliminary Plat
5. Final Plat
6. Master Planned Unit Development for the Arden Village Redevelopment
7. Final Planned Unit Development for the Arden Village Redevelopment
3. Surrounding Area:
4. Site Data:
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Cases12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc Page 3 of 14
Plan Evaluation
1. Rezoning and Comprehensive Plan Amendment
The City's 2030 Comprehensive Plan lays out the future land uses that are anticipated for all
properties within the City. Based on the future land uses, the City can plan for
improvements, anticipate infrastructure needs, and create appropriate land use regulations.
The City's Zoning Code identifies specific zoning districts through which the land uses and
goals in the Comprehensive Plan can be implemented. The zoning cannot conflict with the
future land use designation. State Statute requires that in order to change a property's zoning
district, the future land use of the property in the Comprehensive Plan must also be amended
to reflect the new anticipated use. The Metropolitan Council has the final determination as to
whether to allow a comprehensive plan amendment or not, though they provide great
deference to the City as long as the proposed land use change does not have a negative
impact on a regional system (i.e. transportation, sanitary sewer, and regional parks)
A City has broad discretion when reviewing whether or not to rezone a property or amend its
Comprehensive Plan. Questions to consider are whether or not the proposed project forwards
the broader goals and vision for the City? Would the rezoned property allow for a better
development then the current zoning would permit? Is the proposed zoning district
appropriate to that particular location? Would the proposed change forward the goals of the
comprehensive plan?
If the City approves the Comprehensive Plan amendment one of the conditions of approval
will be that the project is contingent on approval from the Metropolitan Council. The request
for the future land use amendment will be submitted to the Metropolitan Council by the City
at that time. The Metropolitan Council then has 60 days to review the application, though
due to the small size of the project and the lack of negative impacts, the City will be
requesting a shortened review timeline of 14 days. Once the Metropolitan Council completes
their review they will notify the City of their decision. If the land use amendment is
approved the applicant can move forward with filing the final plat and pulling permits.
2. R-4 Zoning Regulations Review
As noted, this project is being reviewed through the Planned Unit Development (PUD)
process. The following section reviews the project based on the R-4 regulations and notes
where flexibility is being requested.
Section 1320 — District Provisions
A. Lot Size, Building Coverage, and Landscaping — Flexibility requested
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Cases 12009W9-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doe Page 4 of 14
The existing lot is 2.76 acres. The applicant is proposing to subdivide it into two lots. Lot 1
will consist of the housing development and is proposed to be rezoned to R-4 from I-1. In
support of the rezoning, the applicant is requesting a Comprehensive Plan amendment for
this lot to change its future land use designation from "Utility" to "Multiple Family." Lot 2
will consist of the communications tower and equipment building. This lot would remain in
its current zoning district and land use designation. The use of this lot will be limited to the
existing tower through the development agreement. For the purposes of calculating
landscaping and density, the two lots are considered as one.
Lot 2 exceeds the minimum landscape requirements for the I-1 District which are 35 percent.
Lot 1 is proposed to have 53 percent landscaping plus an additional 6 percent pervious paver
coverage. City Code requires 65 percent landscaping for residential districts. Together the
two lots would have 58 percent landscaping plus 6 percent pervious pavers for a total
pervious area of 64 percent. The Zoning Code does not directly address the use of pervious
pavers, but pervious pavers do help drainage on the site and the use of green materials is
encouraged.
B. Building Height and Density — Flexibility requested
The maximum building height in the R-4 District is 35 feet. The maximum density is 12
units per acre. The proposed building would be four -stories and 54 feet four inches tall, and
have a density of just under 20 units per acre. The location of this site amongst office uses
and adjacent to Highway 694 makes it a suitable location for a higher intensity of use.
Functionally, the site is more similar to the B-2 District, which allows residential up to 20
units per acre and 50 feet in height along with office, commercial, and light industrial.
C. Setbacks — Meets Requirements
The minimum building setbacks in the R-4 District are 40 feet in the front yard, 30 feet in the
rear yard, and five feet in the side yard, with both sides adding up to 15 feet. The proposed
buildings meet the minimum requirements for the building setbacks.
The minimum parking setbacks in the R-4 District are 20 feet from any right-of-way and five
feet from any side or rear property line. The proposed parking areas meet the minimum
requirements for these setbacks.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
Wetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-02] Arden Village PUD, Plat, Rezoning (Pending) 112-09-09- PC Report -Arden
Village.doc Page 5 of 14
Lot Size
Building Coverage
(sf)
o Building
Coverage
o Pervious Paver
Coverage % Landscaping
Lot 1 - Arden Village
98,593
211779
22.09%
6.36% 52.92%
Lot 2 - Tower
21,711
21183
10.05%
81.28%
Total
120,304
23,962
19.92%
6.36% 58.04%
*Lot and building numbers are from the Preliminary Plat in Attachment E.
B. Building Height and Density — Flexibility requested
The maximum building height in the R-4 District is 35 feet. The maximum density is 12
units per acre. The proposed building would be four -stories and 54 feet four inches tall, and
have a density of just under 20 units per acre. The location of this site amongst office uses
and adjacent to Highway 694 makes it a suitable location for a higher intensity of use.
Functionally, the site is more similar to the B-2 District, which allows residential up to 20
units per acre and 50 feet in height along with office, commercial, and light industrial.
C. Setbacks — Meets Requirements
The minimum building setbacks in the R-4 District are 40 feet in the front yard, 30 feet in the
rear yard, and five feet in the side yard, with both sides adding up to 15 feet. The proposed
buildings meet the minimum requirements for the building setbacks.
The minimum parking setbacks in the R-4 District are 20 feet from any right-of-way and five
feet from any side or rear property line. The proposed parking areas meet the minimum
requirements for these setbacks.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
Wetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-02] Arden Village PUD, Plat, Rezoning (Pending) 112-09-09- PC Report -Arden
Village.doc Page 5 of 14
Section 1325 — General Regulations
A. Landscaping and Tree Preservation - Section 1325.05 Subd. 1 and 1325.055
Landscaping and Tree Preservation Plans were submitted by the applicant and are included in
Attachment E. Based on the square footage of the proposed building, the City Code requires
241 caliper inches of trees to be planted; however, existing and preserved trees on the site are
permitted to count towards this requirement. The following table outlines these numbers and
the additional requirements of the tree preservation ordinance pertaining to tree removal.
Caliper Inches Number of Trees
Total Existing Trees 1,940 115
10% Permitted Removal 194 --
Proposed Removal 1,308 75
Trees Preserved 632 40
Replacement Trees Required* 557
Replacement Trees Proposed 195 88
Total Trees After Development** 827 128
Replacement trees are calculated by subtracting the ten percent permitted removal from the proposed removal
and dividing by two.
**Total trees after development are calculated by adding the number of preserved trees with the number of trees
proposed to be planted.
* * * The number of trees required may vary depending on the size of the trees planted by the developer. City
Code requires a certain number of caliper inches to be planted. If larger trees are planted then fewer trees
would be required.
This is a heavily wooded lot that presents challenges for meeting the tree preservation
requirements. While the total number of trees on site is proposed to increase, the number of
caliper inches would be reduced. City Code requires a replacement of 557 caliper inches
based on the number of significant trees currently on site and the number of trees proposed to
be removed. The applicant is proposing to replace 195 caliper inches. Most of the trees
being removed are considered undesirable trees because of their species (i.e. Ash,
Cottonwoods, Box Elder, and Silver Maples).
Section 1325.055of the Zoning Code identifies several situations in which the City has the
discretion to reduce the number of replacement caliper inches required for a particular
development; providing affordable housing is one of them. The applicant has requested a
reduction in the number of replacement caliper inches required from 557 to 195 in order to
maintain the affordable housing component of the project. This reduction is at the discretion
of the City Council and Planning Commission.
Trees along Street Frontage — Meets Requirements
City Code requires that a minimum of one tree be planted along the right-of-way for every 40
feet of street frontage. The Arden Village property has 209 feet of frontage which would
require five trees to be planted; however, a preexisting utility easement for Xcel Energy
City ofArden Hills
Planning Commission Meetingfor December 9, 2009
IIMetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report - Arden
Village.doc Page 6 of 14
limits the ability to plant trees along the street frontage. A condition has been added that five
additional trees be incorporated in to the front yard area of the development in lieu of being
located along the right-of-way. These trees would be in addition to those identified in the
tree counts in the above section and would increase the number of trees the application has
proposed to plant. The applicant is aware of this requirement.
Perennials and Shrubberies — Meets Requirements
City Code requires that at least ten percent of the total landscaped area shall be covered with
perennials and/or shrubbery. Code requires 6,013 square feet of perennials and shrubbery.
The applicant is proposing 8,490 square feet.
Planting Islands — Flexibility Requested
City Code requires that at least ten percent of the parking area be occupied by planting
islands that are at least 150 square feet in size and have at least one tree, which equates to
1,938 square feet of planting islands. The applicant is providing 886 square feet. The
configuration of the parking lot and proximity to the building make parking islands difficult
to place. Residential developments in general require less parking then commercial
developments making less room for planting islands.
Tree Selection — Meets Requirements
Of the 75 trees proposed to be removed 35 are ash trees. The rest are primarily box elder,
silver maple, and cottonwoods, all undesirable species. The proposed trees to replace these
are extremely divers and include; Red Maples, American Lindons, Hackberry, Dogwoods,
Black Hills Spruce, Scotch Pine, Eastern Pine, and Tannenbaum Pine. All of these species
are appropriate for urbanized locations and would grow well in their proposed locations.
C. Parking — Section 1325.06 — Meets Requirements
The City Code requires two parking stalls for every dwelling unit. The proposed
development would meet this requirement with 55 underground parking stalls and 55 surface
parking stalls.
3. Design Standards — Section 1325.05 Subd. 8
The proposed zoning district for this property is R-4, Multiple Dwelling District. This
zoning district does not include design standards such as those that have been adopted for the
B-2 and B-3 Districts. However, at the suggestion of the City Council at the August work
session, Staff has reviewed the application as if the design standards from those districts were
in place. The discretion offered the Planning Commission and City Council through the
PUD review process allows additional scrutiny when needed to ensure a high quality
development. Additionally, examining the development through the lens of the B-2 District
design standards will help assist the Planning Commission and City Council in understanding
City of Arden Hills
Planning Commission Meeting for December 9, 2009
I Wetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report - Arden
Village.doc Page 7 of 14
how the development will fit into the broader context of the City. The full analysis of the
design standards is included in Attachment C.
Staff has found that the proposed project significantly conforms to the design standards laid
out in Section 1325.05 Subd 8 of the City Code.
4. Conditional Use Permit Amendment Criteria — Section 1355.04 Subd 3
Section 1355.04 Subd 3 of the Arden Hills Zoning Code lists the criteria for evaluating a
Conditional Use Permit.
When evaluating Conditional Use Permits, the Planning Commission and City Council should consider the
effect of the proposed use upon the health, safety, convenience and general welfare of the owners and occupants
of the surrounding land, in particular, and the community as a whole, in general, including but not limited to the
following factors:
1. Existing and anticipated traffic and parking conditions;
2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other
nuisance characteristics;
3. Drainage;
4. Population density;
5. Visual and land use compatibility with uses and structures on surrounding land; adjoining land
values;
6. Park dedications where applicable; and the
7. Orderly development of the neighborhood and the City within the general purpose and intent of
this ordinance and the Comprehensive Development Plan for the City.
The property operates under an existing conditional use permit (72-24). The CUP references
the legal description for the property as well as plans for the towers construction at the time
the application was made to the City. The tower was originally intended as a microwave dish
tower, and while the CUP itself does not make mention of a particular number of antennas
allowed on the tower, the submitted plans at the time showed seven dish antennas. Over the
past 38 years new antennas have been installed and old antennas have been abandoned.
Verizon Wireless, one of the users on the tower, submitted a Structural Analysis Report of
the tower dated August 5, 2009. According to the report, there are 34 antennas located on the
tower. Many of these antennas are no longer operational and Verizon has begun the process
of removing them. A report is being prepared to show the remaining functional antennas to
determine if the tower remains out of compliance with the original CUP. That report was not
available when this report was finished. As part of the conditions of approval for this
application, Staff is recommending that the tower be brought into compliance with the
original CUP or they submit a CUP amendment to determine if any of the new antennas can
remain on the tower. Resolving the CUP and the number of antennas will be required prior
to the issuance of any building permits for Arden Village.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Cases l2009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc Page 8 of 14
Sand Companies, Inc has not taken ownership of the property at this time and is still in the
process of negotiating the details of the tower with the existing owner. The current manager
for the property is a representative of the Reiling Estate that has owned the property since the
original CUP was approved. Neither the current manager nor Sand Companies was aware of
the noncompliance with the original conditional use permit; nevertheless, the representative
for the Reiling Estate acknowledges that this issue needs to be resolved.
5. Traffic Study and Transportation Improvements.
The City ordered SRF Consulting to perform a traffic study for the proposed development.
The City has received the draft report, and the final report will be forwarded to the Planning
Commission as soon it is received. The draft report indicates that except for the County
Road F and Hamline Avenue/Highway 51 intersection, the other intersections near the
property operate at level of service D or better, which is considered acceptable. Furthermore,
SRF Consulting found that the proposed development alone would not have any discernable
impact on traffic at any nearby intersections.
The draft study proposes minor upgrades to the County Road F and Lexington Avenue
intersection, which is being reviewed by the County, and Staff is awaiting comment. The
County Road F and Hamline Avenue/Highway 51 intersection need to be reconstructed and
have a traffic signal added, but the Arden Village project is not considered the impetus for
that improvement and will not make the current situation worse. As part of the Minnesota
Department of Transportation's future plans for the Interstate 694 and Highway 51
interchange reconstruction, they have included a traffic signal at County Road F, though the
timeline is not yet known.
Future development of the Boston Scientific campus, in accordance with their previously
approved Master Plan, would impact traffic significantly at a number of key intersections.
SRF Consulting has made a number of recommendations, including the installation of a
traffic signal at Hamline and County Road F, for such time when Boston Scientific moves
forward with their long term plans. Traffic improvements are included as conditions of
approval for future expansion at Boston Scientific.
Finally, the draft traffic study did not have concerns about the access to the property or the
proposed parking.
6. Sign Code
The applicants have proposed a monument sign at the entrance to identify the development.
The location of the sign is indicated in the attached plans; however, the applicants have not
yet determined the design of the sign. The sign will need to meet all requirements of the
Sign Code and will require a separate sign permit prior to construction.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc Page 9 of 14
6. Park Dedication (1130.08 Subd 2)
For a subdivision that results in new dwelling units in excess of four units per acre, Section
1130.08 Subd. 2 of the Subdivision Ordinance permits the City to require the applicants to
dedicate up to ten percent of the buildable land area in the subdivision or to pay a park
dedication fee of up to ten percent of the property's land value at the time the final plat is
approved.
According to information provided by the applicant, the current value of the property has
been determined to be $750,000. In 2009, Ramsey County assigned an assessed value of
approximately $710,000. State Statutes require the City to use the value of the property prior
to development when determining park dedication requirements. This means that the park
dedication requirement, if it were paid in a fee, would be an estimated $75,000. In order to
meet this obligation, the applicants have proposed to construct a 1,680 foot sidewalk along
the south side of County Road F across the length of their property and connecting to the
existing sidewalk at the entrance to Land O' Lakes. This would create a pedestrian
connection to Lexington Avenue and complete a gap in the City's sidewalk system.
Moreover, the City Council and staff were concerned about the inadequate pedestrian access
to this property from Lexington Avenue or other parks. This sidewalk helps to alleviate
those concerns. The cost of the sidewalk is currently estimated at approximately $85,000;
however, the details of the trail that will impact the final cost and are still being negotiated
with the County. At this time, staff anticipates the developer will cover the gap between the
park dedication requirement and the cost of the sidewalk.
7. Additional Review
A. Building Official, Fire Marshal, Public Works Director, and Civil Engineer
The Building Official, Fire Marshal, Public Works Director, and City Engineer have
reviewed the application and do not have any objections to the proposed project. The Public
Works Director and City Engineer are recommending an eight foot wide trail, rather than a
six foot trail, as proposed by the developer. All final grading and utility plans will be subject
to the Engineer approval prior to the issuance of any permits. All final plans will be subject
to the Fire Marshal approval prior to the issuance of any permits.
B. Ramsey County Review
Ramsey County has reviewed the application and offered comments regarding the proposed
trail. Ramsey County is recommending an eight foot wide trail with a four foot boulevard for
the majority of the length of the trail. The applicant is aware of these comments. Due to the
terrain, utilities, and costs, negotiations with the County are ongoing. Any trail will need to
be approved by Ramsey County prior to the issuance of any building permits.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-02] Arden Village PUD, Plat, Rezoning (Pending) U2-09-09- PC Report -Arden
Village.doc Page 10 of 14
C. Surrounding Jurisdictions
As part of the requirements for amending the City's Comprehensive Plan, notice of the
proposed plan amendment has been sent to the adjacent cities and the Mounds View School
District, Minnesota Department of Transportation, and Ramsey County. Comments have not
yet been received.
Findings of Fact:
This project includes seven requests: An amendment to CUP 72-024, a rezoning of the property
from I-1 to R-4, a Comprehensive Plan Amendment to amend the future land use designation of
the property form Utility to Multiple Family, the Master PUD, the Final PUD, the Preliminary
Plat, and the Final Plat.
Staff offers the following twenty-eight findings of fact for this proposal:
General Findings:
1. The Arden Village property is 2.76 acres in size.
2. The Arden Village property is currently located in the I-1 Light Industrial District
3. The Arden Village property currently has a future land use designation of Utility in the
2030 Comprehensive Plan.
4. The applicant is proposing to re -plat the property into two parcels; Lot 1 and Lot 2.
5. The applicant is proposing to construct 55 units of workforce housing on Lot 1.
6. The applicant is proposing to maintain the current use of Lot 2 as a communications
tower and related equipment.
7. The proposed development requires park dedication.
8. The applicant has indicated that the market value of the property is $750,000. Ramsey
County has an assessed market value for 2009 of $715,600.
9. The park dedication requirement for this application is 10 percent of the land in
dedication or a fee of 10 percent of the market value.
10. The applicant is proposing to construct 1,680 feet of trail along the south side of County
Road F at a cost of approximately $85,000.
Rezoning and Comprehensive Plan Amendment Findings:
11. The application is proposing to rezone Lot 1 to R-4 Multiple Dwelling District and
amend the City's future land use map to designate the property as Multiple Family. The
future land use designation for Lot 2 will remain unchanged.
12. The proposed redevelopment is a permitted use in the R-4 District.
13. Lot 2 would be limited to its existing use and is considered legally non -conforming in the
I-1 District.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Cases 12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc Page 11 of 14
14. The Master PUD and Final PUD advance the City's goals outlined in the Comprehensive
Plan and are in substantial conformance with the proposed future land use amendment.
15. The proposed Comprehensive Plan Amendment would advance the City's goal to
promote the development of a variety of housing options by preserving and increasing
high-quality housing opportunities that are suitable for a mix of ages, incomes and
household types, and encourage the incorporation of affordable, life -cycle, and work
force housing into new development and redevelopment where feasible.
16. The proposed development forwards the Metropolitan Council's target of 288 new
affordable housing units by 2020 in Arden Hills.
17. The completion of the proposed trail associated with the project will advance the Active
Living goals outlined in the City's Comprehensive Plan by extending the City's
pedestrian connectivity.
18. The proposed rezoning and use would not be incompatible with the adjacent land uses.
PUD Review Findings:
19. The application is in substantial conformance with the requirements of the City's Zoning
Code for the proposed R-4 District.
20. The application is in substantial conformance with the City's Zoning Code.
21. The application is in substantial conformance with the City's Design Standards for the B2
District.
22. The applicant is requesting flexibility from the Zoning Code through the PUD process on
landscaping, tree replacement, building height, density, and parking lot planting islands.
23. The application is not anticipated to create a negative impact on the immediate area or the
community as a whole.
24. A traffic study to evaluate the proposed use was completed. The application is not
anticipated to create a negative impact on traffic in the area.
Conditional Use Permit Criteria Findings:
25. The proposed CUP amendment is not anticipated to negatively impact traffic or parking
conditions because it is an amendment to the legal description of the property only.
26. The proposed CUP amendment is not anticipated to negatively impacts Noise, glare,
odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, other nuisance
characteristics, drainage, and population density because it is an amendment to the legal
description of the property only.
27. While park dedication is applicable to the project as a whole, the proposed CUP
amendment itself does not require park dedication.
28. The proposed CUP amendment is in keeping with the orderly development of the
neighborhood and the City within the general purpose and intent of this ordinance and the
Comprehensive Development Plan for the City, as expressed in previous findings.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanninglPlanning Casesl2009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc Page 12 of 14
Recommendation
Upon review of the proposal, staff is recommending approval of all seven requests based on the
findings of fact subject to the following fifteen conditions:
1. The project shall be completed in accordance with the submitted plans as amended by
the conditions of approval. Any significant changes to these plans, as determined by
the City Planner, shall require review and approval by the Planning Commission and
City Council.
2. Executing the Final Plat and publishing the rezoning shall be contingent upon the
Metropolitan Council's approval of the Comprehensive Plan Amendment.
3. A development agreement shall be prepared by the City Attorney and subject to City
Council approval. The development agreement shall be executed prior to execution
of the Final Plat, the issuance of any permits, or site preparation.
4. The applicant shall file the Final Plat with Ramsey County within 180 days of the
approval from the City.
5. The applicant shall obtain a building permit within one year of the Final PUD
approval or the approval shall expire unless extended by the City Council prior to the
approval's expiration date. Extension requests must be submitted in writing to the
City at least 45 days prior to the expiration date.
6. The applicant shall submit a financial surety in the amount of 125 percent of the cost
of the landscaping improvements prior to the issuance of any building permits.
7. The applicant shall obtain approval from the Rice Creek Watershed District and all
other applicable permitting agencies prior to the issuance of any permits. Copies of
such permits shall be provided to the City prior to the issuance of any permits.
8. The plans shall be subject to Fire Marshal approval before building permits are
issued.
9. Final grading, drainage, and utility plans shall be subject to approval by the Public
Works Director and City Engineer prior to the issuance of any building permits.
10. The existing tower shall be brought into compliance with Conditional Use Permit 72-
24 or an amended CUP prior to executing the Final Plat and the issuance of any
building permits.
11. An updated structural analysis report shall be conducted on the tower and submitted
to the City prior to the issuance of any building permits to confirm compliance with
the Conditional Use Permit and City regulations.
12. The applicant shall construct approximately 1,680 feet of trail along the south side of
County Road F, subject to the approval of the City Engineer and Ramsey County,
which will connect their property with Lexington Avenue.
13. The applicant shall provide the required number of ADA parking spaces. The ADA
parking space locations shall be subject to Building Official approval.
14. The applicant shall install an additional five trees between County Road F and the
development outside of any easements or right-of-way.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
Wetro-inet.uslardenhillslPlanninglPlanning Cases12009109-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc Page 13 of 14
15. Lot 2 shall be limited in use to a communications tower and related equipment. If the
communications tower is abandoned, the lot shall not be redeveloped as a new use but
may be recombined with Lot 1.
Proposed Motion Language
1. Recommend Approval with Conditions: Motion to recommend approval of Planning Case
09-021 for a Rezoning from I-1 to R-4, Comprehensive Plan Amendment, Master PUD, Final
PUD, and Preliminary and Final Plat at 1296 County Road F based on the findings of fact,
submitted plans, and the conditions in the December 9, 2009, planning case report.
2. Recommend Approval as Submitted: Motion to recommend approval of Planning Case 09-
021 for a Rezoning from I-1 to R-4, Comprehensive Plan Amendment, Master PUD, Final
PUD, and Preliminary and Final Plat at 1296 County Road F based on the findings of fact
and the submitted plans presented in the December 9, 2009, planning case report.
3. Recommend Denial: Motion to recommend denial of Planning Case 09-021 for a Rezoning
from I-1 to R-4, Comprehensive Plan Amendment, Master PUD, Final PUD, and Preliminary
and Final Plat at 1296 County Road F based on the following findings of fact...
4. Table: Motion to table Planning Case 09-021 for a Rezoning from I-1 to R-4, Comprehensive
Plan Amendment, Master PUD, Final PUD, and Preliminary and Final Plat at 1296 County
Road F: a specific reason and/or information request should be included with a motion to
table.
Deadline for Agency Actions
The City of Arden Hills received the completed application for this request on November 2,
2009. Pursuant to Minnesota State Statute, the City has extended its review deadline by an
additional 60 days. The City must act on this request by March 2, 2010 (120 days). The City
may, with the consent of the applicant, extend the review period beyond the initial 120 days.
Resident Comments
Notice was published in the Shoreview -Arden Hills Bulletin and mailed to properties within
1,000 feet of the property. At this time no comments have been received.
City of Arden Hills
Planning Commission Meeting for December 9, 2009
IlMetro-inet.uslardenhillslPlanningiPlanning Cases 12009W9-021 Arden Village PUD, Plat, Rezoning (Pending)112-09-09 - PC Report -Arden
Village.doc Page 14 of 14
Public Works Breakdown
Streets
101-43100
42210
22.5%
$
27.23
Parks
101-45200
42210
22.5%
$
27.23
Water
601-49440
42210
22.5%
$
27.23
Sanitary Sewer
602-49490
42210
22.5%
$
27.23
Storm Water
604-49550
42210
10.0%
$
12.10
Total Expense 100.0 /ov:r:::
Approved:
Date:
IM
Attachment A
Application and Supporting Materials
'It
December 9, 2009, Planning Commission Meeting
Applicant Information
Applicant: Arden Vi 11 a a� El C
Address: 327-0727
Telephone No.: 3 2 0- 2 0 2- .�10 0 Other:
Fax No.: 320-202-3139
Email Address: J-.JThp-1 PnCa�andc.om,nani Ps com
Property Information
Property Owner: US Bank. National Association,, as Pprsonal Rep, of thp Fstate Georae J.
-OwnerAddress: US' Bank, Att: Mike O'Rourke, I 1 01 F., 5th Street. St- Paul, MN �.�164.. Rei 1 i nci.
Owner Telephone No. 651-466-8545 Other:
Address of Property Involved: 1296 Countv Road F. Arden Hi 11 s . MN
u
Legal Description: Lot 1 Block 1 Land 0' Lakes Addition
Property ID No.: _2730 ,310002
Type of Use: Multi -Family Apartment Bui 1 di na
Zone: 1-1 (L,imited Industrial) Property Acreage: 2.76 Acres
T e of Request*
LJApportionment of Assessments ($30 IQ Rezonin ($550)
Comprehensive Plan Amendmen .($550) ❑ Site Plan ' w (Sign or Fence) ($250)
I , `nrli#inn�l/Intc� �
rim �o Dcrmi4 nr Amcnrimcnfi (�S(1
�1 ❑V
!'nacation of Easement or Right -of -Way ($300)
Final Plat ($400 + $25 per lot) '�'�• °p
Master Planned Unit Development ($600 +escrow)� (�p�
I
LJ Final Planned Unit Development' '$ 0
Planned Unit Development Amendmen ($ 0)
Q .Zoning or City Code Amendment ($550)
LJ Land Use Requests —Not Already Specified ($200)
LJ Appeal of Administrative Decision ($75)
LJ Minor Subdivision (lot split/consolidation) ($425
'IN Preliminary Plat ($600 + $25 per lot +escrow) (nr/D. °o
Ll Variance (Zoning Code) ($350)
Ll Site Plan Review ($400)
Revised: 12-16-
Jfo.'� Page1 of3
`-T�
*Certain applications are subject to review
.and approval by the Rice Creek Watershed
District. Contact RCWD directly at 763-
398-3070 for additional information.
*The land use application fees do not cover
building, sign, or other permit fees that may
be required upon approval of a land use
application.
*All applications may be subject to
additional fees for reimbursement of
consultant costs associated with filing,
reviewing, and processing of application in
the form of an escrow to the City.
For Office Ise
Only
EN I�
Planning Case Na
09-z
�
Submittal Date
00�i
1245 West Highway 96
Application Completed Date
(0}caJ
Arden Hills, Minnesota 55112
Accepted by
Telephone (651) 792-7800
Receipt Number
Fax (651) 634-5137
Council Decision
www.ci.arden-hills.mn.us
Council Decision Date
2009 LAND USE APPLICATION
Applicant Information
Applicant: Arden Vi 11 a a� El C
Address: 327-0727
Telephone No.: 3 2 0- 2 0 2- .�10 0 Other:
Fax No.: 320-202-3139
Email Address: J-.JThp-1 PnCa�andc.om,nani Ps com
Property Information
Property Owner: US Bank. National Association,, as Pprsonal Rep, of thp Fstate Georae J.
-OwnerAddress: US' Bank, Att: Mike O'Rourke, I 1 01 F., 5th Street. St- Paul, MN �.�164.. Rei 1 i nci.
Owner Telephone No. 651-466-8545 Other:
Address of Property Involved: 1296 Countv Road F. Arden Hi 11 s . MN
u
Legal Description: Lot 1 Block 1 Land 0' Lakes Addition
Property ID No.: _2730 ,310002
Type of Use: Multi -Family Apartment Bui 1 di na
Zone: 1-1 (L,imited Industrial) Property Acreage: 2.76 Acres
T e of Request*
LJApportionment of Assessments ($30 IQ Rezonin ($550)
Comprehensive Plan Amendmen .($550) ❑ Site Plan ' w (Sign or Fence) ($250)
I , `nrli#inn�l/Intc� �
rim �o Dcrmi4 nr Amcnrimcnfi (�S(1
�1 ❑V
!'nacation of Easement or Right -of -Way ($300)
Final Plat ($400 + $25 per lot) '�'�• °p
Master Planned Unit Development ($600 +escrow)� (�p�
I
LJ Final Planned Unit Development' '$ 0
Planned Unit Development Amendmen ($ 0)
Q .Zoning or City Code Amendment ($550)
LJ Land Use Requests —Not Already Specified ($200)
LJ Appeal of Administrative Decision ($75)
LJ Minor Subdivision (lot split/consolidation) ($425
'IN Preliminary Plat ($600 + $25 per lot +escrow) (nr/D. °o
Ll Variance (Zoning Code) ($350)
Ll Site Plan Review ($400)
Revised: 12-16-
Jfo.'� Page1 of3
`-T�
*Certain applications are subject to review
.and approval by the Rice Creek Watershed
District. Contact RCWD directly at 763-
398-3070 for additional information.
*The land use application fees do not cover
building, sign, or other permit fees that may
be required upon approval of a land use
application.
*All applications may be subject to
additional fees for reimbursement of
consultant costs associated with filing,
reviewing, and processing of application in
the form of an escrow to the City.
Brief Description of Request (please also include a typed, detailed letter explaining the project):
Filing & Information Requirements
The City requests that you make a pre -application meeting with the City Planner to discuss the application
process, requirements, and deadlines. Unless waived by the City Planner or Planning Commission, a certified
survey of the property is required for all applications. The Planning Commission and/or City Council may still
require a certified survey. A checklist for other required information is also available.
Complete/Incomplete Applications
An incomplete application will delay the processing of land use requests. The application approval time
commences and an application is considered officially filed when the City Planner has received and examined
the application and determined that the application is complete. A decision on whether the application is
complete or incomplete shall be made within fifteen (15) working days following the submittal of the application.
When the application is deemed to be "complete" it shall be placed on the agenda of the first possible Planning
Commission meeting provided that all required public notices have been sent and published.
Payment of Fees
The undersigned acknowledges that she/he understands that before a land use application can be deemed
complete, all required information and fees (including all deposits) must be paid to the City. If additional fees
are required to cover costs incurred by the City, the City Planner has the right to require additional payment from
one or more of the undersigned, who shall be jointly liable for such fees. Such expenses may include (but are
not limited to) direct city payroll and overhead costs, fees paid to consultants and other professionals, and the
cost of printing, mailing, and supplies. The City may withhold final action on a land use application, withhold
building permits, and/or rescind prior action until all miscellaneous fees have been paid. Applicants are advised
that an escrow deposit is required at the time of the ' submittal of the land use application to offset costs
associated . with the proposed project. Unused portions of an escrow are returned to the applicant upon
�► successful implementation of an approved plan.
Notice of Meeting Attendance
In order for the Planning. Commission and the City Council to consider any application, the applicant or a
designated representative must be present at the scheduled meeting. If not, the matter may be tabled until the
next available agenda.
Revised: 12-16-08
Page 2 of 3
Agenda Deadline and Meetina Schedule
The deadline for submittal of land use applications Is required according to the schedule outlined below. There
are no exceptions. PlAnning Codirnission meetings are typically held on the first Wednesday of each month at
6:30 PK though please 'contact City Hall to verify the meeting date and time. City Council meetings are held
typically the last Monday of the same month at 7:00' PM. Meetings are held in the Council Chambers at the City
of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112, unless otherwise stated. Applicants are
advised that additional meetings and/or workshops are scheduled when necessary upon approval of the
#.-.Planning Commission.
2009 SCHEDULE (*sub, ject to change)
Acknowledgement and Si nature
I acknowledge that I have read all of the Information listed in the City of Arden Hills Land Use Application and
fully understand that I am responsible for all costs incurred by the City related to the processing of this
application. LA.$ ajeAN(I , 1%4, Z A.,s Azr&s�-to4c. RepAoe-r-F. Ajq 4 "r 10 C-
%
/D - 0-P
Property Owner Signature (Required) Date
T
J 0
Applicant Si ature (If different than the property owner) Date
Please contact the City Planner at (651) 7927800
if you have any questions regarding this application.
Additional doplesofthis application form are avallableon the City's website:htt 1Www.dArden-h111s.mn.us
Revised: 12-16-08
Page 3 of 3
TENTATIVE
TENTATIVE
APPLICATION
PLANNING
CITY COUNCIL
DEADLINE
COMMISSION
MEETING
DATE*
-MEETING DATE*
DATE*
(Generally held on the
(Generally held on the
-first Wednesday at 6:30 p.m.)
last Monday at 7:00 Pm)
De"' mb9'%r'.1'(2008)
J;EinUa'!Y'7
-Januar 26
y
Januay-6
February 4
February 23
• F616tWi!Y 2
4.*
-March W
Mardh 2
April 8
April 27
April 6'
Ma 25
Ma y 4
June 3
June 29
June -'I •
Jul .8
Jul y 27. -
July 6
August 6
Au-aust 31
A .3
U usf.3
Spote M'ber 9
Septehiber.28
September 7
October 7
October 26
Oct0*156t.6
NoVember 4.
Nove m'6*er 30
November 2
December 9
December 28
Decernber7
Januaa 6 (2 10)
Januaa 25 (2010).
Acknowledgement and Si nature
I acknowledge that I have read all of the Information listed in the City of Arden Hills Land Use Application and
fully understand that I am responsible for all costs incurred by the City related to the processing of this
application. LA.$ ajeAN(I , 1%4, Z A.,s Azr&s�-to4c. RepAoe-r-F. Ajq 4 "r 10 C-
%
/D - 0-P
Property Owner Signature (Required) Date
T
J 0
Applicant Si ature (If different than the property owner) Date
Please contact the City Planner at (651) 7927800
if you have any questions regarding this application.
Additional doplesofthis application form are avallableon the City's website:htt 1Www.dArden-h111s.mn.us
Revised: 12-16-08
Page 3 of 3
November 2, 2009
Planning Commission
City of Arden Hills
1245 West Highway 96
Arden Hills, Minnesota 55112
RE: Arden Village
1296 County Road F
Arden Hills, MN
Dear Commissioners:
PROJECT SCOPE:
Sand Companies, Inc.
366 South Tenth Avenue
PO Box 727
Waite Park, MN 56387-0727
Office: (320) 202-3100
Fax: (320) 202-3139
E-mail: SCI@ SandCompanies.com
Website: www.SandCompanies.com
This Project involves construction of a four story wood frame apartment building
of 55 apartment units over a pre -cast concrete and masonry wall underground
parking garage. The building is a mix of one, two and three bedroom units.
Each unit is equipped with full kitchen and one or more bathrooms. All units
have exterior decks or patios at grade. An area for mail boxes is provided near
the main entrance and a small lobby serves a management office and meeting
room. A Community Room and public toilet are also located on first floor. Trash
and recycling rooms are provided at each floor with a trash chute leading to a
compactor at the garage level. Trash dumpsters are stored inside until pick-up.
PRELIMINARY DESIGN STANDARDS:
The building has a vertical composition that fits the heavily wooded surrounding
terrain. The multiple stepped roof lines keep the scale of the building user
friendly. The forms are familiar to residential architecture but fresh and modern.
The main entrance element is prominent from the site entrance with an inviting
canopy. A separate "move -in" route is provided to keep the main entrance and
lobby available to residents, while the office locations provides an "eyes on the
street" presence. A parking island provides a location for a moving truck to park
for unloading.
All the exterior materials are consistent with the requirements of "Additional
Design Standards for new developments in the 132 and 133 Districts", and all
facades are treated equally. The building facades are strongly modulated both
horizontally and vertically and the partially exposed garage level and lower
portion of the ground floor are strongly expressed by the use of integrally colored
textured masonry in an ashlar pattern. Cement fiber siding panels are the basic
exterior material above the masonry base, with heavily textured accent colored
shakes used at gable ends and projecting living room elements.
P:\SCI - Const. & Dev. Div\Arden Village - #09-308\Architectural\City of Arden HillsTrojectl3escription110209.doc
Construction ♦ Property Management ♦ Development
Equal Opportunity Employer
UNIT INTERIORS
Units are fully finished including cabinets, floor covering, light fixtures,
appliances, closet shelving and window coverings. Carpet used in all units
except the handicapped accessible is a frieze style made from recycled plastic
bottles while the vinyl flooring has recycled content as well. All flooring products
will carry the Green Label Certification. Units will be furnished with water saving
front loading washers and electric dryers.
MECHANICAL AND ELECTRICAL
Heat is to be supplied to the building by a high efficiency gas fired hot water
boiler system and distributed to units by fin tube radiation. Apartment units will
have individual temperature control using electric zone valves. Cooling is
provided to units by thru-wall air conditioners in living rooms and some
bedrooms. Corridor heating, air conditioning and ventilation will be provided by
forced air furnaces located on each floor. Additional units will serve the office,
Community and lobby areas.
The building will be fully sprinklered with a NFPA 13 system covering the four
story apartment portion and NFPA 13 system in the garage and attic (dry pipe).
Wet standpipes will also be provided at the exit stairs.
Electric service will be provided from a pad mounted transformer to switchgear
located in a garage area electrical room. Individual meters for each unit will be
located in the same area. Distribution panels will be located in each apartment
unit. A structured media center will be located in the entry closet of each unit and
data cabling, voice cabling and television cabling will be distributed to recessed
devices from that point.
SITE DEVELOPMENT
The site will be entered from County Road F with entrance to the parking garage
south of the building. Surface parking will be located on the east side of the
building. The asphalt parking lot will have concrete curbs and gutters with
sidewalks to access the building entrances and exits. Sidewalks will be extended
to County Road F and along County Road F to connect to existing sidewalks to
the east near Lexington Avenue and to the intersection at Hamline Avenue.
Paving and roof drainage will be directed to infiltration basins (rain gardens)
south and east of the building. Some of the parking lot run-off will be infiltrated
through pervious concrete paving in the car parking area. Extensive landscaping
will be provided in buffer yards and around the building. The nature of the site
will be aimed more toward the surrounding woodland areas rather than highly
manicured lawns. Mulched beds and planting areas will be fully irrigated.
P:\SCI - Const. & Dev. Div\Arden Wage - #09-30KArchitecturaWity of Arden HillsTrojectDescriptionl 10209.doc
A tot lot is included with play equipment will be located south of the building and
the area will also be equipped with fixed seating, picnic tables, bar-b-que grills
and trash receptacles. Pervious pavers will be used at the edges to reduce
storm water run-off.
GREEN COMMUNITIES
The building will be designed to meet the requirements of the 2008 Green
Communities Criteria. The Green Communities Criteria Checklist includes
elements in the following areas:
1) Integrated Design
2) Site, Location and Neighborhood Context
3) Site Improvements
4) Water Conservation
5) Energy Efficiency
6) Materials Beneficial to the Environment
7) Healthy Living Environment
8) Operations and Maintenance
Examples of provisions meeting the criteria include low flow plumbing fixtures,
water conserving site irrigation design, surface water management, efficient
lighting and appliances (Energy Star Rated), Green Label Floor Coverings, fresh
air system to each apartment unit, and use of recycled content materials.
Sincerely,
Rich rd A. Her
Senior Archite(
P:\SCI - Const, & Dev. Div\Arden Village - #09-30MArchitecturaWity of Arden ffillsTrojeaDescription], 10209.doc
Attachment B
Letter of Support
lt
EN HILLS
December 9, 2009, Planning Commission Meeting
-ADEN HILLS
September 14, 2009
Minnesota Housing Finance Agency
440 Sibley St. Suite 300
St. Paul, MN SS 101
Attention: Multi -family Underwriting
Re: Housing Tax Credit Program & Super RFP
ARDEN VILLAGE — ARDEN HILLS
Dear Multifamily Development:
The City of Arden Hills is a community made up of residents, businesses and institutions sharing a common
history. One of the primary purposes of a community is to. serve as a place of residence for its citizens.
Assuming this charge, offering a mix of life cycle housing opportunities becomes a challenge for local
governments, especially in suburban markets.
The City has a strong desire to support affordable and work -force housing and is an active participant in the
Livable Communities Program. The City's 2030 Comprehensive Plan sets goals that emphasize the
development of a variety of housing types that are suitable for a mix of incomes, including work -force
housing. Developers and the City must be partners to cooperatively develop housing plans to provide life
cycle housing in Arden Hills.
The City of Arden Hills proposes to use local financial assistance for this project as pari of its participation and
endorsement. If the project is selected for funding, the City Council supports the use of tax increment
financing (TIF) for the project. The TIF structure is proposed to be pay-as-you-go with a projected tax exempt
bond amount of $400,000 with 90 percent of increment returned to the project until the bonds are repaid. As
part of the TIF, the project will need to meet all state guidelines for TIF, including the "but for test:." The
project must also be reviewed under the City's business subsidy policy as well as conform to the City's
development standards.
Along with its financial endorsement of Arden Village, the City is supportive of offering flexibility in site
development standards such as density and zoning code requirements as the project moves through the
development approvals of the City. Although the project will be required to meet all building code
requirements, the building officials will, to the best of their abilities, work with project to allow for fast-track
pennitting approvals.
The proposed development is an excellent opportunity for the City of Arden Hills to meet a large portion of its
housing goals. This endorsement is based upon the findings that the project will meet locally identified
housing needs and that the proposed housing is in short supply in the local housing market. This need is
evidenced by the gap between the local supply and demand for the proposed type of housing.
The City Council's endorsement is evidenced by this letter of support for the proposed development. we
respectfully request funding approval for this needed development in the City of .Arden Hills.
Sin
Stan Ha Lead
Honorable Mayor
City of At -den Hills + 1245 West Highway 96 * Arden Hills, MN ♦ 55112-5743
Phone 6151.792.7800 * Fax 651.634.5137 + www ei.arden-hills.nin.tis
Attachment C
Section 1325.08 - Design Standards
Review
'It
,AI�}EN HILLS
December 9, 2009, Planning Commission Meeting
�RQEN HILLS
CITY OF ARDEN DILLS
MEMORANDUM
DATE: December 9, 2009
TO: Planning Commission
FROM: Meagan Beekman, City Planner
SUBJECT: Arden Village Design Review
The following review is based on information provided by Sand Companies, Inc in regards to the
Arden Village proposal. The purpose of this review is to examine the proposed development
through the lens of the design guidelines for the B2 and B3 Business Districts. while the
proposed project would be located outside of these zoning districts, it is being reviewed through
a PUD process, which allows the City to impose greater design review scrutiny in exchange for
other flexibilities in the Zoning Code.
Findings Summary
This project is in substantial conformance with the City's design guidelines.
Findings: Section 1325.05 Subd. 8 — Additional Design Standards for the B2 and B3
Districts
A. Building Materials. Buildings shall be constructed of materials that are enduring, timeless,
and well -detailed.
1. At least seventy-five percent (75%) of the exterior building materials shall be of brick,
stone, decorative concrete plank, transparent glass or any combination thereof.
This requirement has been met. The majority of the building would be constructed o� f
concrete plank, transparent glass, and shakes.
City of Arden Mills
Planning Commission Meeting.for June 3, 2009
Section 1325.05 Subd. 8 — Additional Design Standards in the B2 and B3 Districts
Page 1 of 9
2. Trim and other accent or decorative features may be metal, wood, or EIFS. Other high-
quality materials that increase the variety and appeal of buildings may be considered as
accents. Metals shall have a matte finish and neutral or earth tone colors. Metals that are
used on exterior walls shall have visible corner moldings and trim.
This requirement has been met. Trim would consist of steel fascia and aluminum.
3. Undesirable materials shall include simulated brick or stone, vinyl or aluminum siding,
sheet metal, corrugated metal, concrete blocks, materials that have no pattern or relief
when applied to large walls, brightly colored metal roofing or canopies, and pre -cast tilt -
up walls. Extensive use of mirrored or tinted glass on the first floor and materials that
represent corporate colors or trademarks that are not in conformance with approved
building materials are also undesirable.
Vinyl siding is proposed for a portion of the building.
B. Building Design. The arrangement, geometry, massing, materials and colors shall work to
create a high quality development that is responsive to existing buildings, site features, and
site design on adjoining sites in the district.
1. At least fifty percent (50%) of the largest building on each site shall be constructed at the
front setback line.
This requirement has been met. The majority of the building line is setback 40 feet from
the front property line.
2. Facade treatment shall be carried around all sides. Architectural elements such as, but
not limited to, windows, shutters, awnings, doors, masonry exterior veneers, cornice
detailing, window casings, and other architectural details should demonstrate consistency
on all sides of the structure that are reasonably visible to the general public. Plain flat
walls shall not be permitted when viewable from the public right-of-way or public areas.
This requirement has been met. The architectural details carry around all four sides of
the building.
3. To avoid long unbroken expanses and to increase visual interest from the street, buildings
of more than 40 feet in width shall be divided into smaller increments (between 20 and 40
feet) through articulation of the facades to convey the impression of individually -
constructed small storefronts or, in the case of housing, housing units.
This requirement has been met. The building has architectural details that break up the
walls and create articulation around all sides. This is done with changes to the siding
treatments.
Page 2 of 9
4. Awnings or overhangs shall be provided at entryways to provide shelter from the sun and
rain. The awnings shall be opaque so as not to create a glowing effect with lights under
the awnings. Awnings shall be constructed of durable, protective, and water repellant
material; however, plastic or fiberglass awnings shall not be permitted.
This requirement has been met. Awnings are present over all entrances.
5. Any multi-level building shall distinguish the ground floor level from the upper floors by
use of any or a combination of these techniques: an intermediate cornice line, difference
in building materials or details, awnings trellis or arcade, special window details, or brick
corbels or quoins. A strong base and top for multi -story buildings shall be established;
middle layers shall be simpler. Detail shall be an integral part of the architecture rather
than a series of applied elements.
This requirement has been met. Architectural details are present the break up the height
of'the building into smaller segments.
6. Franchise architecture identified with a particular chain shall be discouraged unless it is
architecturally integrated into the district and conforms to these design standards.
Not Applicable.
7. Entrances shall have convenient access to the street frontage and to parking serving the
use. For those properties along County Road E, access to the street frontage shall be
given priority where feasible.
Not Applicable.
C. Commercial Fagade Transparency — Not Applicable
1. Fifty percent (50%) of the first Level facade that includes the primary store entrance
and/or faces a public street shall be made of transparent windows and doors that are
recessed at least one inch rather than being flush with the facade. If the building is a one
story design and the first floor elevation exceeds twelve (12) feet, then only the first
twelve (12) feet shall be included in calculating the facade area.
2. At least twenty percent (20%) of the remaining sides that are reasonably visible to the
public shall be window coverage, half of which may be simulated windows (i.e. spandrel
glass). If additional transparent glass is used on the remaining sides, the City may
consider a proportional reduction in the transparent window and door requirement on the
primary store entrance and/or public street fagades.
3. For buildings with a use or function that does not readily allow windows (e.g. cooler or
freezer areas, mechanical rooms, security areas, storage areas) the transparent window
Page 3 of 9
standards may be reduced at the discretion of the City Council. However, the
architectural detailing must be provided by the use of upper level windows, which may
include the partial use of simulated windows, or architectural detailing that provides
arches, patterning, recesses, and shadowing that provide aesthetic interest. Architectural
detailing may include such things as change in materials, change in color and other
significant visual relief provided in a manner or at intervals in keeping with the size,
mass, and scale of the wall.
D. Building Color. Colors shall be harmonious. Building colors shall consist of muted colors
with low reflectance. Recommended colors include browns, grays, tans, beiges, and dark or
muted green, blues, and reds. Bright or brilliant colors and sharply contrasting colors may be
used for only accent purposes occupying a maximum of five percent (5%) of building
fagades.
This requirement has been met. The building colors are tans and greens
E. Fences. Fences shall blend into the landscape, be compatible with other materials used on
site, and be made of a material that minimizes corrosion. Finished and treated wood, brick,
stone or wrought iron is encouraged.
This requirement has been met. Fences on site shall meet this requirement.
F. Signs.
1. Business signs shall be architecturally compatible with the style, composition, materials,
colors and details of the building and should be an integral part of the building. Signs
shall be incorporated into the fagades of the buildings rather than extending past the roof
line and should not project more than twelve (12) inches beyond the plane of the fagades.
Retail business wall signs shall be located in a position above the front window that is
located consistently among stores.
Not Applicable
2. All other provisions in Chapter 12, Sign Code, shall apply.
This requirement will be met.
G. Site Furnishings and Seating Areas.
1. Site furnishings shall be provided based on the scale of the project. The site furnishings
may be spread out on the site or clustered to provide a more formal area. Placing site
furnishings near landscaped areas is encouraged. These areas may be shared by multiple
tenants on a property or adjacent properties and may include tables, chairs, benches,
plantings, and other outdoor amenities such as a plaza. These areas shall be maintained
Page 4 of 9
for year round use. Creativity is highly encouraged. These spaces shall be connected to
the sidewalk system.
This requirement has been met. The development would provide on-site recreation areas
for tenants including play areas and seating areas. The recreation areas will have
access to the proposed sidewalk along County Road F.
2. Benches and decorative plantings shall be provided near the primary entrance of all
buildings on a site.
This requirement has been met.
3. Restaurants shall include a functional outdoor seating area with tables, chairs, plantings,
and access to the restaurant.
Not Applicable.
H. Screening.
1. Trash and recycling equipment, materials, and containers shall be fully enclosed and
integrated into the architecture of the buildings.
This requirement has been met.
2. All mechanical equipment, whether roof -mounted or ground -mounted should be
integrated into the architecture of the building. It shall be completely screened from the
ground -level view of adjacent properties and public streets. Wood screening shall not be
permitted.
This requirement has been met.
3. Truck docks and delivery areas shall face away from the public street and shall be
integrated into the architecture of the building.
This requirement has been met. There would be minimal needfor truck docks. Garbage
and recycling removal would be required.
I. Landscaping. A generous amount of plant material and landscaping shall be used on all new
development and redevelopment sites. Office parking areas shall include a generous amount
of perimeter and internal landscaping. Parking structures shall be visually softened with
plantings. A minimum of one tree shall be placed along the right-of-way every forty (40)
feet. The tree shall not interfere with the roadway and shall be on private property.
This requirement has been met. A large amount of landscaping and rain gardens are
proposed around the parking, drive, and building areas. The lot is heavily wooded and the
project would require significant tree loss. Affordable housing and green building design
Page 5 of 9
are two reasons, listed in the Zoning Code, for the City Council to allow reduced tree
mitigation. Due to a utility easement along the front of the property it is not possible to plant
street trees. The applicant has agreed to add additional trees in the front yard area instead.
J. Parking.
1. Placing parking between the street right-of-way and a building shall be discouraged.
This requirement is met. There is no parking between the building and the street.
2. No more than fifty percent (50%) of the parking on a site may be between buildings or in
the side yards.
This requirement is net. 50 percent of the parking is below ground.
3. Sufficient parking shall be provided to accommodate the reasonable hourly peak on a
given site. Shared parking is encouraged to reduce land devoted to parking. Hourly
variations among different types of land use may be considered when estimated parking
demands.
Not Applicable
4. Plantings shall be used to soften and shade parking lots and parking structures. Parking
and service areas shall be visually screened from street views with plantings and
architectural treatments.
This requirement is met. The parking is adjacent to the building and landscaping and
grade will shield it front view of the street.
5. Parking lot islands shall be used to distribute large parking fields into separate "outdoor"
rooms that have visual relationship to the buildings they serve. Parking lot islands shall
be planted with trees or include infiltration basins and plantings. Entry drives shall be
defined by trees and shrubs.
This requirement is not met, and flexibility has been requested.
6. A concrete curb shall be provided around the periphery of all parking lots and access
roads, except where the City Engineer determines that a curb would impede drainage.
This requirement has been met.
7. Parking adjacent to streets should be screened from views with landscaping, including
but not limited to trees, hedges, flowers and other bushes and/or decorative masonry
walls. Berms shall be discouraged.
This requirement has been met.
Page 6of9
8. Parking structures that are visible from off the site shall display an integration of building
materials building form, textures, architectural motif, and building colors with the
principal building. No signs other than directional signs shall be permitted on parking
ramp facades.
Not applicable, the parking structure will not be visible from off the site.
K. Traffic Study. A traffic study shall be required for all new developments, redevelopments,
and significant modifications to existing sites unless waived by the City Council.
This requirement has been net. A traffic study has been ordered by the City and is enclosed.
L. Lighting. Exterior lighting shall be provided for the safety and convenience of occupants and
visitors.
1. A lighting plan shall be submitted that shows location, type of illumination and design.
A photometric analysis of site and building shall be submitted for City approval with all
new construction or redevelopment projects.
This requirement has been met.
2. Exterior lighting shall be consistent in type, design, scale, and color to create unity in the
Districts. High-pressure sodium lighting and other similar types of lighting color may be
required by the City to promote a unified lighting color throughout the Districts. Other
lighting colors may be considered during the City review process.
This requirement has been met.
3. Exterior lighting for parking lots and buildings shall not be excessive and shall be
directed at their intended purposes.
This requirement has been met.
4. Lighting under a gasoline station canopy shall not be directly visible from the street but
shall be recessed into the canopy or otherwise shielded.
Not applicable.
5. Light washing of buildings and accent lighting may be permitted through the City review
process provided that it does not negatively impact residential areas or traffic safety and
is complementary to the district as a whole.
This requirement has been met.
Page 7 of 9
M. Pedestrian and Bicycle Circulation. Pedestrian and bicycle improvements shall be installed
in accordance with the City of Arden Hills Comprehensive Plan and the local guiding plan
and shall be in conformance with the following:
1. Site design shall facilitate pedestrian connections and mobility within and between
building, sites, and uses by providing clear visual indicators through door placement,
signage, striping, raised pathways, and integrating landscaping components. other
features or materials may be considered that enhance and provide a safe pedestrian
experience.
This requirement is met.
2. A sidewalk shall link the primary entrance of each building on site with the public
sidewalk network. In the event a building is subdivided into multiple separated tenant
spaces, a sidewalk must link the primary entrance of each separated tenant space with the
public sidewalk network.
This requirement is met.
3. Bike racks shall be required near a public entrance of all buildings.
This requirement has been met. Bike racks have been provided near the garage entrance
and at each underground Barking stall.
4. Internal sidewalk systems shall connect with adjacent planned or developed public
sidewalks or trails.
This requirement is met.
5. The grades of all walks, parking spaces, terraces, and other paved areas shall conform to
the requirements of the Americans with Disabilities Act.
This requirement will be met.
6. Where there is new building construction or renovation where the renovation value is
thirty percent (30%) or more of the pre -renovation value of the structure, a minimum six
foot concrete sidewalk adjacent to or in all rights-of-way shall be provided. The location
of the sidewalk shall be prescribed by the Public Works Director. The new sidewalks
shall connect to sidewalks on adjacent properties if they exist. At the discretion of the
City Council, the property owner may, in lieu of constructing the sidewalk, pay the City
an amount equal to the cost of constructing the sidewalk to satisfy the obligations of this
section. Said payment shall be used by the City to further maintain and construct the
pathway system within the City.
This requirement has been met. The applicant is proposing a 1,680 foot pathway along
the south side of County Road F to connect their property with Lexington Avenue. The
Page 8 of 9
pathway would be constructed by the applicant as part of their park dedication
requirement.
7. When there is more than one building on a site, a sidewalk must link the primary building
entrances of each building to one another.
Not applicable. The proposed development would not be more than one building.
N. Drainage/Water Management Plan: A plan must be submitted with each project or lot
development in the Districts. The plan must be approved by the Rice Creek Watershed
District, other agencies as required, and the engineer assigned by the City. Two or more lots
or projects may coordinate their plans for their mutual benefit.
This requirement will be met. Plans have been submitted to the Rice Creek Watershed
District and are currently under review. All final plans are subject to City Engineer
approval and Rice Creek Watershed District approval.
Q. Environmental Conservation and Sustainability. The City encourages the use of green
materials and environmentally friendly construction and site design such as the use of
pervious surfaces, green rooftops, energy efficient materials, LEED standards, and other
green building techniques.
The proposed building would incorporate green building principals through site design,
building materials, water conservation, and on -staff LEER accredited professionals. The
project is not seeking full LEED accreditation
Page 9 of 9
Attachment D
Aerial and Photographs of the Site
It-
,ARZEN HILLS
December 9, 2009, Planning Commission Meeting
UIL
... .........
cc
cc
....... . ............................ ........... - INC
..............
i.
--------- -
Attachment E
Plans and Surveys
,!tt
EN HILLS
December 9, 2009, Planning Commission Meeting
KNOW ALL MEN BY THESE PRESENTS.• That Arden Village, LLC, o Minnesota Limited Liability Company, fee owner of the following described property
situated in the County of Ramsey, State of Minnesota, to wit:
Lot 1, Block 1, LAND 0' LAKES ADDITION.
Hos caused the some to be surveyed and plotted as ARDEN VILLAGE and does hereby donate and dedicate to the public for public use forever the
drainage and utility easements as shown on the plat.
In witness whereof said Arden Village, LLC, o Minnesota Limited Liobflity Company, hos caused these presents to be signed by its proper officer
this------- day of----------------------- 20-------
Signed. Arden Village, LLC
By------------------------------� its ----------------------------------
STATE OF MINNESOTA
COUNTY OF_______________
The foregoing instrument was acknowledged before me this ------- day of ------------------ 20___, by its proper officer of Arden Village, LLC,
a Minnesota Limited Liability Company, on behalf of the company.
(Signature) (Printed Nome)
Notary Public, County, Minnesota
My Commission Expires
1, Nothon H. Carlson, Land Surveyor, do hereby certify that I hove surveyed or directly supervised the survey of the property described on this plot;
prepared this plat or directly supervised the preporotion of this plot; that this plot is a correct representation of the boundary survey, that all
mathematical data and lobels ore correctly designated on this plot, that all monuments depicted on this plot have been correctly set; that all
monuments indicated on this plot will be correctly set within one year, that all water boundaries and wet lands, as defined in Minnesota Statutes,
Section 505.01, Subd. 3, as of the dote of the surveyor's certificotion are shown and labeled on this plot; and all public ways ore shown and
labeled on this plot.
Dated this ______ day of ________________e 20___•
Nothon H. Carlson, Land Surveyor
Minnesota License No.45873
STA TE OF MINNESOTA
COUNTY OF
The foregoing Surveyors Certificate was acknowledged before me this ________ day of
H. Carlson, Licensed Land Surveyor, Minnesota License no. 4587.3
(Signature) (Printed Nome)
20____ by Nathan
Notary Public, County, Minnesota
My Commission Expires
City of Arden Hills
We do hereby certify that on the ___ day of ---------------- 20___, the City Council of the City of Arden Hills, Minnesota, approved this plat.
Also, the conditions of Minnesota Statutes, Section 505.03, Subd. 2, have been fulfilled.
Mayor Clerk
Department of Property Records and Revenue
Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year ______ on the land hereinbefore described hove been paid.
Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this ___ day of ______________,
20___
__, Director
Deportment of Property Records and Revenue
By------------------------------- Depu ty
County Surveyor
I hereby certify that this plot complies with the requirements of Minnesota Statutes, Section 505.021, and approved
pursuant to Minnesota Statutes, Section 383A.42, this ___ day of --------------- 20___.
Michael D. Fiebiger, P.L.S.
Ramsey County Surveyor
Registrar of Titles. County of Ramsey, State of Minnesota
I hereby certify that this plat of ARDEN HILLS was filed in the office of the Registrar of Titles for public record on this ___ day of
______________, 20__, of ___ o'clock __.M. and was duly filed in Book _____ of Plots, Page ------- as Document
Number -------------------
Deputy Registrar of Titles
ARDEN VILLA GE
X C-10 OA
'�o`040
�g0�
�o I
i2 00 tl'
I
� I
16
i
0
ROYAL LA. b1t. A
W. FLORAL DR. _
W 50
a � 2
COUNTY R0. F 0 12
0
694 SST
51
694
NORTHWOOOS
Q RED FOX RD. lO
z 0
Sl
/' /' ♦ \
V/cw ry MAP
(NOT TO SCALE)
Westwood
Professional Services, Inc.
.7
(S89°56'00 E) (-NORTH LINE OF LOT 1, BLOCK 1
N89°31'55"E 2075
- -------_----
-IRANSMISWON LINE EASEMENT PER-.*
U)
q
i BOOK 1901, PAGE 520 & DOG NO.
N
N
470086 & UTILITY EASEMENT PER
— —LAND O'LAKESADD--------------------
61
I
I
I
I
I
I
I
I
i
I
A
I
i
I
J�
I
Z40
0 40 80 120
-.
R
Scale in feet
o
I
��
J
I
I
I
J
'
'
BL OCK 1
A
LQ
WI
W
` t JIJ�
/' //
/
Bearings shown ore based upon the north line
'���•
Q I
/
/
of Lot 1, Block 1, LAND 0' LAKES ADD1 TION
and is assumed to bear N89131'55"E.
/ a
(XXXX) Record bearing per LAND 0' LAKES ADDITION
0 Denotes 1/2 inch by 14 inch iron monument
set and marked by License No. 45873
\
I
,.,.� •^
I
e / / /
• Denotes found monument
AL AL
/
AL Denotes wet land
NET LAND '
/
4 Denotes controlled access
{
'
AL N8903823E
/
104.80
X C-10 OA
'�o`040
�g0�
�o I
i2 00 tl'
I
� I
16
i
0
ROYAL LA. b1t. A
W. FLORAL DR. _
W 50
a � 2
COUNTY R0. F 0 12
0
694 SST
51
694
NORTHWOOOS
Q RED FOX RD. lO
z 0
Sl
/' /' ♦ \
V/cw ry MAP
(NOT TO SCALE)
Westwood
Professional Services, Inc.
.7
rNLI�I' I I 1 1I I I I i Fill
F I I 1 1 11 1 I I�\ �L,, � �-� � �,L, ���
6' DRAIN TILE
CLASS 5 AGGREGATE BASE
2 TOT LOT DETAIL 3 TYP. SIDEWALK CONSTRUCTION DETAIL 4 TYP. CURB & GUTTER / GRADE DETAIL
SCALE: 1-112': V-0' A0i SCALE: 1-1/2': V-0' x"01 SCALE: 1-1/2': V-00
HEAVY DUTY
LIGHT DUTY BITUMINOUS WEAR CRS.
BITUMINOUS BASE CRS.
%i ^N
. � •o�o�o�o o�o o�c .
CLASS 5 AGGREGATE BASE
6 TYP. BITUMINOUS PAVING DETAIL
A-0•' SCALE• 1-112" ' 1'-0"
DRAIN TILE @ BASE OF TREE
WOOD CHIP MULCH
• ` 4 /7 i 141 ' CONT. VINYL EDGING
7 TYP. LANDSCAPE PLAN
A 01 SCALE: I': T -Off
REMOVE DEAD TWIGS
RETAIN NATURAL. SHAPE
SET TRUNK - ROOT JUNCTION AT OR
SPLIT 6' DRAIN TILE @ BASE OF TREE SLIGHTLY ABOVE FINISH GRADE
WOOD CHIP MULCH 4' DEPTH FINELY SHREDDED HARDWOOD
BARK MULCH (KEEP 6' FROM TRUNK)
CONT. VINYL EDGING
- NO EDGING @ SIM. CREATE SAUCER FOR WATERING
SEE PLAN /– GRADE y _ FINISH GRADE
f •'.h
�Sa� �NJ-* Se�s�t��ti CREATE 80' SLOPED SIDES
,/4Er,
:>r �����'�'� �'� � • I � I—I � ATI i I—I � PLANT SOIL MIXTURE
„l ' _ : ' I I—I I—) I—I I CUT & REMOVE ALL CORDS, ROLL BACK
I�TI — I =-1 I IT) I ATI I I_ - FROM TOP of RoorBall &curl OFF
—) I I—I I I I I—III—I I—I I—I I—I (( Z><BALL DA EXCESS, REMOVE POT FOR POTTED PLANTS
I I—I I I—I I—III III —I I I—I I—I I I=III—I
•, I I I-1 11-1 I I =1 11=I I IE I I-111=111:
sEr sorroM of RooTBAI L ON RAISED
SOLID UNDISTURBED SOIL. (COMPACT IF
LANDSCAPE LOOSE)
to LANDSCAPE DETAIL 11 TYP. SHRUB PLANTING 12 TYP. LANDSCAPE PLAN
A�01
SCALE: 1-1/2': V -ON 1 SCALE: 1/2': V-0' A-0' SCALE: 1' :1'-0"
ULAQ0 D lYWRC19A 1 C C %=
NOTE EXPANSION JOINT @ 30'-0' O.C. MAX OR AS SHOWN ON PLANS
S WHERE WALK ABUTS ANY FIXED OBJECTS (EX WALLS, CURBS, MANHOLE COVERS, ETC.)
5 TYP. INTEGRAL CURB & WALK DETAIL
SCALE: 1-1/2":1'-0"
TYPICAL MAXIMUM 1:20 SLOPE IN ANY DIRECTION
RELATIVE ELEVATIONS FROM ASPHALT
+6 +6
z
I� ACCESSIBLE PARKING SIGN
INSTALL BOTTOM OF SIGN
60' ABOVE PARKING SURFACE
VAN ACCESSIBILITY SIGN
218' GAIN. POST
GRADE
SCALE: 1" :1'-0"
V12ODEGPaS AFTER INSTALLATION TRIM OUT DEADWOOD
ANDIOR DEFORMED TWIGS - DO NOT CUT
120 DEGREESSTACKING DIAGRAM CENTRALLEADER
INSTALL PLANT TO BEAR SAME
S RELATIONSHIP TO GRADE AS GROWING
CONDITION
GUY ASSEMBLY: 16' POLYPehIlem rue OR
POLYETHYLENE (40 MIL)1-1/2' WIDE STRIP
(TYP.) DOUBLE STRAND 14 GA. WIRE AND 3
STEEL STAKES OR SIGN POSTS @ 120
DEGREES O.C. (SEE STAKING DIAGRAM)
NOTE
GUY ASSEMBLY OPTIONAL BUT
CONIRACTORASSUMES FULL
RESPONSIBILITY FOR MAINTAINING TREE IN
A PLUMB POSITION OF THE DURATION OF
THE GUARANTEE PERIOD
GUY WIRE WITH WEBBING
NOTE: STAKE TOP BELOW GRADE `
PERFORATED PVC COLLAR
PLANTING SOIL MIXTURE
COMPACTED UNDISTURBED SOIL - SCARIFY
BOTTOM AND SIDES OF HOLE PRIOR TO
PLANING
14 TYP. CONIFEROUS TREE PLANTING
SCALE: 1/2'
i 0 Is
** C1
Sand Companies, Inc.
Construction • Property Management *Development
366 South Tenth Avenue
PO Box 727
Waite Park, MN 56387-0727
Office: (320) 202-3100
Fax: (320) 202-3139
Website: wmm.SandCompanies.com
E -Mail: SC1( SandCompanies.com
SITE ANALYSIS
TOTAL SITE AREA =120,304 S.F.
2.76 ACRES
55 UNITAPARTMENT BUILDING =19.92 UNITS /ACRE
BUILDING FOOTPRINTS) EXISTING = 2163 S.F.
BUILDING FOOTPRINT PROPOSED = 21,627 S.F.
' BUILDING HEIGHT= 54'4'
'FAR. = 0.64
1ST FLOOR - 20,292
2ND FLOOR = 20,055
3RD FLOOR =19,171
4TH FLOOR = 17,630
TOTAL =77,146
LOT COVERED BY STRUCTURE:
EXISTING b PROPOSED = 20%
IMPERVIOUS SURFACE = 57,601 S.F.
'LANDSCAPED LOT AREA = 62,128 S.F. OR 52%
PARKING:
REQUIRED = 2 x 55 UNITS =110 SPACES
PROVIDED= 110 SPACES
55 SURFACE STALLS
55 UNDERGROUND STALLS
' INDICATES AVARIANCE IS REQUIRED
NOTES
#1 =ACCESSIBLE PARKING SIGN
SEE DETAIL
12l =ACCESSIBLE VAN PARKING SIGN
T SEEDETAIL
#3l = STOP SIGN - SEE DETAIL
TT FOR INSTALLATION HT. (SIM.)
#41 = NO PARKING FIRE LANE
T SEE DETAIL
FOR INSTALLATION HT. (SIM.)
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION
OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION 8 THAT I AM A DULY LICENSED
ARCHITECT UNDER THE LAWS OF MINNESOTA
SIGNATURE:
TYPED OR PRINTED NAME: RICHARD A. HENNINGS
REGISTRATION NO.: 12295
DATE: �--�--
THESE DRAWINGS AND SPECIFICATIONS ARE THE
SOLE PROPERTY OF SAND COMPANIES, INC. ANY
REPRODUCTION OR REUSE OF THESE DOCUMENTS IS
FORBIDDEN WITHOUT WRITTEN PERMISSION FROM
SAND COMPANIES, INC.
PROJECT NO.: 09-306
DRAWN BY: WAL
CHECKED BY: R. HENNINGS
DATE:
--�--
REVISED DATE: A11RDEN
VILLAGE
ARDEN HILLS, MN
SITE PLAN
Am0*11
10-19-09
CURB 8 GUTTER
NOTE: COURSE BROOM FINISH IN SLOPED AREA
`'
+3
0 :+3 :.
. SEL LF SIDEWALK_ b ATIONs..
-Cal
0
+6 +3 0
z
I� ACCESSIBLE PARKING SIGN
INSTALL BOTTOM OF SIGN
60' ABOVE PARKING SURFACE
VAN ACCESSIBILITY SIGN
218' GAIN. POST
GRADE
SCALE: 1" :1'-0"
V12ODEGPaS AFTER INSTALLATION TRIM OUT DEADWOOD
ANDIOR DEFORMED TWIGS - DO NOT CUT
120 DEGREESSTACKING DIAGRAM CENTRALLEADER
INSTALL PLANT TO BEAR SAME
S RELATIONSHIP TO GRADE AS GROWING
CONDITION
GUY ASSEMBLY: 16' POLYPehIlem rue OR
POLYETHYLENE (40 MIL)1-1/2' WIDE STRIP
(TYP.) DOUBLE STRAND 14 GA. WIRE AND 3
STEEL STAKES OR SIGN POSTS @ 120
DEGREES O.C. (SEE STAKING DIAGRAM)
NOTE
GUY ASSEMBLY OPTIONAL BUT
CONIRACTORASSUMES FULL
RESPONSIBILITY FOR MAINTAINING TREE IN
A PLUMB POSITION OF THE DURATION OF
THE GUARANTEE PERIOD
GUY WIRE WITH WEBBING
NOTE: STAKE TOP BELOW GRADE `
PERFORATED PVC COLLAR
PLANTING SOIL MIXTURE
COMPACTED UNDISTURBED SOIL - SCARIFY
BOTTOM AND SIDES OF HOLE PRIOR TO
PLANING
14 TYP. CONIFEROUS TREE PLANTING
SCALE: 1/2'
i 0 Is
** C1
Sand Companies, Inc.
Construction • Property Management *Development
366 South Tenth Avenue
PO Box 727
Waite Park, MN 56387-0727
Office: (320) 202-3100
Fax: (320) 202-3139
Website: wmm.SandCompanies.com
E -Mail: SC1( SandCompanies.com
SITE ANALYSIS
TOTAL SITE AREA =120,304 S.F.
2.76 ACRES
55 UNITAPARTMENT BUILDING =19.92 UNITS /ACRE
BUILDING FOOTPRINTS) EXISTING = 2163 S.F.
BUILDING FOOTPRINT PROPOSED = 21,627 S.F.
' BUILDING HEIGHT= 54'4'
'FAR. = 0.64
1ST FLOOR - 20,292
2ND FLOOR = 20,055
3RD FLOOR =19,171
4TH FLOOR = 17,630
TOTAL =77,146
LOT COVERED BY STRUCTURE:
EXISTING b PROPOSED = 20%
IMPERVIOUS SURFACE = 57,601 S.F.
'LANDSCAPED LOT AREA = 62,128 S.F. OR 52%
PARKING:
REQUIRED = 2 x 55 UNITS =110 SPACES
PROVIDED= 110 SPACES
55 SURFACE STALLS
55 UNDERGROUND STALLS
' INDICATES AVARIANCE IS REQUIRED
NOTES
#1 =ACCESSIBLE PARKING SIGN
SEE DETAIL
12l =ACCESSIBLE VAN PARKING SIGN
T SEEDETAIL
#3l = STOP SIGN - SEE DETAIL
TT FOR INSTALLATION HT. (SIM.)
#41 = NO PARKING FIRE LANE
T SEE DETAIL
FOR INSTALLATION HT. (SIM.)
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION
OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION 8 THAT I AM A DULY LICENSED
ARCHITECT UNDER THE LAWS OF MINNESOTA
SIGNATURE:
TYPED OR PRINTED NAME: RICHARD A. HENNINGS
REGISTRATION NO.: 12295
DATE: �--�--
THESE DRAWINGS AND SPECIFICATIONS ARE THE
SOLE PROPERTY OF SAND COMPANIES, INC. ANY
REPRODUCTION OR REUSE OF THESE DOCUMENTS IS
FORBIDDEN WITHOUT WRITTEN PERMISSION FROM
SAND COMPANIES, INC.
PROJECT NO.: 09-306
DRAWN BY: WAL
CHECKED BY: R. HENNINGS
DATE:
--�--
REVISED DATE: A11RDEN
VILLAGE
ARDEN HILLS, MN
SITE PLAN
Am0*11
10-19-09
CURB 8 GUTTER
NOTE: COURSE BROOM FINISH IN SLOPED AREA
6 TYP. PEDESTRIAN RAMP. DETAIL
01 SCALE: 3/4': T -Ow
DO NOT REMOVE CENTRAL LEADER - ONLY REMOVE
BRANCHES THAT ARE CLOSE TOGETHER, CROSSING, OR
BROKEN - RETAIN NATURAL SHAPE
TREE WRAP THE TRUNK WHEN TREE IS DORMANT -
SECURING IT WITH STRING OR TAPE AND REMOVED
DURING THE GROWING SEASON
REQUIRED DEPTH OF PLANTING PIT IS DETERMINED WHEN
TRUNK/ ROOT JUNCTURE SITS 2' ABOVE FINISH GRADE
SPLIT DRAIN TILE
4' - 6' DEPTH MULCH - KEEP AT LEAST 6' FROM TRUNK
BASE OF TREE
CUT AND REMOVE ALL CORDS THAT TIE BALL AND TRUNK
WOOD CHIP MULCH
- ROLL BACK AND CUT BURLAP WRAP FROM TOP AND
SIDES OF ROOT BALL -BEND WIRE CAGE BACK AND AWAY
TYP.
FROM SIDES OF THE BALL
FINISH GRADE
EDGE OF MULCH
=I (I=III=1 '.: ':: ;:; : : •'.:' <::i ; .. ? ;' . ' ;. , • . USE A TOTOTILLER OR SHOVELS TO LOOSEN AND MIX TO A
MIN. DEPTH OF 12' -ALL SOIL THROUGHOUT THE 4x AREA
I I-1 I I- _) =i
— I CREATE 60 % SLOPED SIDES
IRRIGATION DRIP LINE
-TYPICAL LAYOUT -
-1 __ ,
X -VARIESREMOVE
EXISTING SOIL TO REQUIRED DEPTH AND STOCKPILE - USE
ROTOTILLER OR SHOVELS TO LOOSEN & RETURN AS BACKFILL
2x (MIN)
SET BOTTOM OF ROOTBALL ON SOLID UNDISTURBED SOIL
4x - WHERE SPACE KIM
- IF LOOSE: FIRMLY COMPACT
,3 TYP. DECIDUOUS TREE PLANTING
' SCALE: 1/2" : TV
z
I� ACCESSIBLE PARKING SIGN
INSTALL BOTTOM OF SIGN
60' ABOVE PARKING SURFACE
VAN ACCESSIBILITY SIGN
218' GAIN. POST
GRADE
SCALE: 1" :1'-0"
V12ODEGPaS AFTER INSTALLATION TRIM OUT DEADWOOD
ANDIOR DEFORMED TWIGS - DO NOT CUT
120 DEGREESSTACKING DIAGRAM CENTRALLEADER
INSTALL PLANT TO BEAR SAME
S RELATIONSHIP TO GRADE AS GROWING
CONDITION
GUY ASSEMBLY: 16' POLYPehIlem rue OR
POLYETHYLENE (40 MIL)1-1/2' WIDE STRIP
(TYP.) DOUBLE STRAND 14 GA. WIRE AND 3
STEEL STAKES OR SIGN POSTS @ 120
DEGREES O.C. (SEE STAKING DIAGRAM)
NOTE
GUY ASSEMBLY OPTIONAL BUT
CONIRACTORASSUMES FULL
RESPONSIBILITY FOR MAINTAINING TREE IN
A PLUMB POSITION OF THE DURATION OF
THE GUARANTEE PERIOD
GUY WIRE WITH WEBBING
NOTE: STAKE TOP BELOW GRADE `
PERFORATED PVC COLLAR
PLANTING SOIL MIXTURE
COMPACTED UNDISTURBED SOIL - SCARIFY
BOTTOM AND SIDES OF HOLE PRIOR TO
PLANING
14 TYP. CONIFEROUS TREE PLANTING
SCALE: 1/2'
i 0 Is
** C1
Sand Companies, Inc.
Construction • Property Management *Development
366 South Tenth Avenue
PO Box 727
Waite Park, MN 56387-0727
Office: (320) 202-3100
Fax: (320) 202-3139
Website: wmm.SandCompanies.com
E -Mail: SC1( SandCompanies.com
SITE ANALYSIS
TOTAL SITE AREA =120,304 S.F.
2.76 ACRES
55 UNITAPARTMENT BUILDING =19.92 UNITS /ACRE
BUILDING FOOTPRINTS) EXISTING = 2163 S.F.
BUILDING FOOTPRINT PROPOSED = 21,627 S.F.
' BUILDING HEIGHT= 54'4'
'FAR. = 0.64
1ST FLOOR - 20,292
2ND FLOOR = 20,055
3RD FLOOR =19,171
4TH FLOOR = 17,630
TOTAL =77,146
LOT COVERED BY STRUCTURE:
EXISTING b PROPOSED = 20%
IMPERVIOUS SURFACE = 57,601 S.F.
'LANDSCAPED LOT AREA = 62,128 S.F. OR 52%
PARKING:
REQUIRED = 2 x 55 UNITS =110 SPACES
PROVIDED= 110 SPACES
55 SURFACE STALLS
55 UNDERGROUND STALLS
' INDICATES AVARIANCE IS REQUIRED
NOTES
#1 =ACCESSIBLE PARKING SIGN
SEE DETAIL
12l =ACCESSIBLE VAN PARKING SIGN
T SEEDETAIL
#3l = STOP SIGN - SEE DETAIL
TT FOR INSTALLATION HT. (SIM.)
#41 = NO PARKING FIRE LANE
T SEE DETAIL
FOR INSTALLATION HT. (SIM.)
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION
OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION 8 THAT I AM A DULY LICENSED
ARCHITECT UNDER THE LAWS OF MINNESOTA
SIGNATURE:
TYPED OR PRINTED NAME: RICHARD A. HENNINGS
REGISTRATION NO.: 12295
DATE: �--�--
THESE DRAWINGS AND SPECIFICATIONS ARE THE
SOLE PROPERTY OF SAND COMPANIES, INC. ANY
REPRODUCTION OR REUSE OF THESE DOCUMENTS IS
FORBIDDEN WITHOUT WRITTEN PERMISSION FROM
SAND COMPANIES, INC.
PROJECT NO.: 09-306
DRAWN BY: WAL
CHECKED BY: R. HENNINGS
DATE:
--�--
REVISED DATE: A11RDEN
VILLAGE
ARDEN HILLS, MN
SITE PLAN
Am0*11
10-19-09
::Ters�k-Apenue
711.
,, ':.(320) Z 3iO
far; (3#)282-3139
E Afoff.- 3CJ@&-►; omffimie&com
NOTF,
TREE TOREMMN
EXISTING TREE SYM M
t-- NQhbS16�1IFIGANT TREE
z ROCK MUI N
= OOD MLUH
=PERMEAUPAVERS.
EBY;CERTkFY THAT 3.HIS PLAN, OR SPEC#FICATION
OR REPORt Y�lA3 PRPARED DY Miw 1#NOlwR MY
DMEGT SUFf:RYI3KNi & THAT I.AM A DULY LICENSED
ARCKTECT UNDER THE LAWS OF IvikNNESark
SIGKATUR.S:
TYPED OR PRINTED, NAME: RICHARD A. HENNINW
REOSTRATION NO.: 12298
DATES .�..%
TMESE #RAWINGS AND SPECIFIC"ONS AIME THE
SOLE PROPERTY OF SAND COMPANIES; INC. ANY
REPRODUCTION OA.EtEI,ISE OF THM. DOCUMENTS 1S
FORBI N WITHOUT T WREN P60MISSION MOM
SAND COMPANIES: INC.
PROJECT NO.: 48308
VRAWN 9v: WAL
CHEOW BY: R: HENNINCS
DATE` -•"/--i--
REVISED DATE
A"EN
VILLAGE
ARDEN HILLS, MN
Tag
Tree to be Saved Number
DBH (Diameter at Breast Height)
Species
Significant Tree
Notes:
x 01
10.5
Green Ash
Yes
11.3
x 02
32.2
Green Ash
Yes
two trunks
X 11
6.2
Quaking Aspen
No
Damaged
x 13
14.7
Pin Oak
Yes
226A
14
13.0
Green Ash
Yes
10.8
16
7.9
Eastern Cottonwood
No
Green Ash
X_ 18
29.6
Box Elder
No
threetrunks
x 20
14.3
Red Oak
Yes
X 234
x 21
21.3
Eastern Cottonwood
Yes
6.8
x 21A
9.4
Green Ash
No
Qua king Aspen
x 26
8.8
Bur Oak
No
PAGODA DOGWOOD
27
11.2
Box Elder
No
O
28
11.2
Box Elder
No
20'
x 29
14.2
American Elm
Yes
x 30
12.4
Green Ash
Yes
Damaged
x 31
10.1
American Elm
Yes
x 32
11.9
Black Cherry
Yes
x 33
18.4
Green Ash
Yes
PICEA GLAUCA DENSATA
x 34
13.4
Box Elder
Yes
X 35
9.3
Box Elder
No
x 36
12.4
Box Elder
Yes
6 FT. B&B
x 37
49.2
Eastern Cottonwood
Yes
x 38
11.8
Green Ash
Yes
x 39
31.9
Green Ash
Yes
three trun ks
x 40
10.0
Box Elder
No
EASTERN PINE
x 41
15.1
Box Elder
No
twotrunks/Damaged
x 42
12.2
Bur Oak
Yes
9 x 2.5 = 22.5'
X 43
16.8
Green Ash
Yes
X 45
10.9
Box Elder
No
'iECHNY GLOBE' ARBROVITAE
x 47
12.7
Eastern Cottonwood
Yes
Damaged
x 48
28.2
Box Elder
No
four trunks
x 49
25.6
Eastern Cottonwood
Yes
CURRANT ALPINE
x 50
17.8
Box Elder
Yes
51
9.3
Green Ash
No
52
9.0
Green Ash
No
53
9.5
Green Ash
No
DRT
x 54
23.6
Silver Maple
Yes
two trunks
x 55
11.9
Green Ash
Yes
56
9.9
Box Elder
No
JUNIPERUS HORIZONTALIS m
57
17.5
Eastern Cottonwood
Yes
58
17.8
Green Ash
No
two trunks
X 59
7.2
Silver Maple
No
36' POT
60
7.3
Green Ash
No
61
6.5
American Elm
No
62
8.1
Green Ash
No
36
63
8.6
Green Ash
No
SPIREA SNOW MOUND
64
9.0
Eastern Cottonwood
No
65
19.0
Eastern Cottonwood
Yes
two trunks
66
8.5
Green Ash
No
two trunks
67
14.8
Green Ash
Yes
YT
68
9.2
Green Ash
No
69
16.3
American Elm
Yes
70
11.1
Green Ash
Yes
x 71
25.4
Green Ash
Yes
two trunks
72
8.8
Silver Maple
No
x 73
12.4
Box Elder
Yes
x 74
12.6
Green Ash
Yes
75
10.3
Green Ash
Yes
76
11.2
Green Ash
Yes
77
10.8
Green Ash
Yes
x 78
50.2
Eastern Cottonwood
Yes
79
12.2
Green Ash
Yes
80
8.1
Green Ash
No
80A
8.1
Green Ash
No
x 81
7.8
Green Ash
No
82
11.5
Box Elder
No
x 83
12.4
Green Ash
Yes
x 84
11.2
Green Ash
Yes
85
9.0
Green Ash
No
86
11.6
American Elm
Yes
87
15.4
American Elm
Yes
x 87A
13.1
Green Ash
Yes
88
12.3
Green Ash
Yes
89
13.5
Green Ash
Yes
90
11.5
Green Ash
Yes
91
16.8
Green Ash
Yes
92
11.2
Green Ash
Yes
x 93
10.5
Green Ash
Yes
93A
10.4
Green Ash
Yes
94
10.1
Green Ash
Yes
96
39.2
Eastern Cottonwood
Yes
X 97
8.5
Green Ash
No
x 98
12.0
Box Elder
Yes
99
14.2
Green Ash
Yes
100
13.2
Green Ash
Yes
101
9.5
Green Ash
No
102
8.0
Green Ash
No
103
22.1
Pin Oak
Yes
threetrunks
104
8.8
Green Ash
No
105
21.5
Box Elder
No
twotrunks
106
12.0
American Elm
Yes
107
10.2
Green Ash
Yes
108
9.4
Green Ash
No
109
11.8
Green Ash
Yes
110
8.2
Green Ash
No
111
11.5
Green Ash
Yes
112
7.2
Green Ash
No
113
8.8
Green Ash
No
114
11.6
Green Ash
Yes
115
12.2
Green Ash
Yes
116
22.4
Silver Maple
Yes
117
8.5
Green Ash
No
118
9.0
Green Ash
No
Tree to be Saved Tag Number
DBH (Diameter at Breast Height)
Species
Significant Tree
Notes:
119
9.3
Green Ash
No
11.3
120
9.5
Box Elder
No
Green Ash
121
10.8
Silver Maple
No
Damaged
122
20.9
Silver Maple
Yes
226A
123
22.1
Silver Maple
Yes
10.8
124
17.3
Green Ash
Yes
Green Ash
125
44.5
Silver Maple
Yes
No
126
11.2
Box Elder
No
X 234
127
10.2
American Elm
No
6.8
128
8.8
Green Ash
No
Qua king Aspen
129
10.2
Green Ash
Yes
PAGODA DOGWOOD
130
7.1
Box Elder
No
O
131
10.5
Box Elder
No
20'
132
8.0
Green Ash
No
133
12.2
Box Elder
Yes
E
134
6.1
Silver Maple
No
135
23.2
Silver Maple
Yes
135A
10.2
Green Ash
Yes
PICEA GLAUCA DENSATA
135B
6.6
Green Ash
No
136
25.3
Silver Maple
Yes
137
7.2
Green Ash
No
6 FT. B&B
138
10.2
Box Elder
No
139
9.9
Box Elder
No
140
9.4
Green Ash
No
3
141
8.0
Green Ash
No
EASTERN PINE
142
6.3
Green Ash
No
®
143
23.3
Si Iver Maple
Yes
9 x 2.5 = 22.5'
144
8.9
Green Ash
No
145
9.5
Green Ash
No
'iECHNY GLOBE' ARBROVITAE
146
23.5
Silver Maple
Yes
147
20.7
Si Iver Maple
Yes
21
148
9.0
Green Ash
No
CURRANT ALPINE
149
9.3
Green Ash
No
150
8.8
Green Ash
No
151
9.0
Green Ash
No
152
12.1
Box Elder
Yes
DRT
153
9.3
Green Ash
No
154
12.0
Box Elder
Yes
156
8.1
Green Ash
No
JUNIPERUS HORIZONTALIS m
157
10.2
Green Ash
Yes
158
8.5
Bur Oak
No
159
6.1
Box Elder
No
36' POT
160
13.1
Green Ash
Yes
161
10.8
Bur Oak
Yes
162
9.3
Green Ash
No
36
163
8.8
Green Ash
No
SPIREA SNOW MOUND
163A
7.5
Green Ash
No
164
27.8
Green Ash
Yes
two trunks
166
15.9
Green Ash
No
two trunks
167
11.9
Green Ash
Yes
YT
168
10.2
Green Ash
Yes
168A
7.4
Green Ash
No
169
15.2
Bur Oak
Yes
170
12.0
Green Ash
Yes
171
16.5
American Elm
Yes
172
7.1
Green Ash
No
173
10A
Green Ash
Yes
174
9.5
Green Ash
No
175
23.0
Si Iver Maple
Yes
176
17.5
Silver Maple
Yes
177
32.2
Si Iver Maple
Yes
178
8.1
qua king Aspen
No
179
23.8
Silver Maple
Yes
180
8.0
Qua king Aspen
No
181
9.2
Green Ash
No
182
8.3
American Elm
No
183
13.1
Green Ash
Yes
183A
9.6
Green Ash
No
184
28.9
Silver Maple
Yes
186
7.8
Green Ash
No
187
7.5
Quaking Aspen
No
188
16.2
Silver Maple
Yes
189
8.2
Silver Maple
No
190
8.9
Green Ash
No
191
15.2
Silver Maple
Yes
192
10.3
Green Ash
Yes
193
9.0
Green Ash
No
193A
9.5
Silver Maple
No
x 194
30.0
Green Ash
Yes
197
9.3
Black Cherry
No
198
12.6
Green Ash
Yes
199
13.5
American Elm
Yes
200
9.9
Green Ash
No
x 201
14.0
Eastern Cottonwood
Yes
x 202
9.5
Green Ash
No
203
10.2
Box Elder
No
204
11.5
Green Ash
Yes
205
27.5
Green Ash
Yes
threetrunks
207
8.3
Box Elder
No
208
7.1
Green Ash
No
209
20.6
Silver Maple
Yes
x 210
8.9
Box -Eider
No
211
11.2
Pin Oak
Yes
212
22.4
Pin Oak
Yes
213
10.8
Green Ash
Yes
213A
11.0
Pin Oak
Yes
214
31.5
Pin Oak
Yes
215
7.4
Bur Oak
No
216
12.5
Green Ash
Yes
217
10.8
Pin Oak
Yes
218
8.5
Green Ash
No
219
24.1
Silver Maple
Yes
220
11.2
Bur Oak
Yes
Tree to be Saved Number
DBH ( Diameter at Breast Height)
Species
Significant Tree Notes:
x 221
9.5
Green Ash
No
222
11.3
Pin Oak
Yes
224
11.9
Green Ash
Yes
x 225
29A
Green Ash
Yes three trunks
226
17.1
Silver Maple
Yes
226A
10.5
Box Elder
No
227
10.8
Pin Oak
Yes
228
6.5
Green Ash
No
229
8.3
Pin Oak
No
233
7.4
Qua king Aspen
No
X 234
7.5
Qua king Aspen
No
x 235
6.8
Qua king Aspen
No
x 236
6.7
Qua king Aspen
N o
Total Signifcant Tree Caliper Inches = 1940
Total Signifcant Tree Caliper Inches Lost= 1307.5
Total Signifcant Tree Caliper Inches Lost Minus Green Ash = 810.1
Tree Replacement (Caliper Inches) Required = 405.05
Tree Replacement (Caliper Inches) Provided = 194.8
*Tree Replacement (Caliper Inches) Not Provided = 210.2
Total Signifcant Tree Caliper Saved = 632.5
Total Non-Signifcant Tree Caliper Saved = 199.9
New Caliper Inches Required = Gross S.F. of all Floors / 320 = 77,148/320 = 241.1
New Caliper Inches Provided = 236.0
New Caliper Inches Provided Broken Down As Follows:
Caliper Inches Used to Fulfill New Requirement = 41.2
Caliper Inches Used to Fulfill Replacement Requirement = 194.8
Total Non-Signifcant Tree Caliper Inches Saved used to Fulfill New Requirement =199.9
Total Caliper Inches on Site Required= Signifcant Saved +Tree Replacement + New Caliper Inches= 1278.6
Total Caliper Inches on Site Provided = Significant Saved + Non-Signifcant Saved + New Caliper Provided =1068.4
Percentage of Minimum Caliper Requirements Met = 83.6
Tree Ratio Required for 3-4 Story Building:
2.0"-3.0"= 50% met through New Trees
3.5"-4.0f1=30% met through Non -Sig. Saved Trees
4.5"-6.011= 20% met through Non -Sig. Saved Trees
Perenials & Shrubberies Required (S.F.)= .10 xxLandscaped Area = 6012.8
Perenials & Shrubberies Provided (Includes Rain Gardens) (S.F.) = 8490.0
Planting Islands Required (S.F.)= .10 x Parking Area = 1938.0
*Planting Islands Provided (S.F.)= 886.0
*Indicates a Variance is Required.
NEW PLANTING LEGEND
t
s
..SCI
Sand"Companies, Inc.
Construction • Property Management 0 Dei elopment
366 South Tenth Avenue
PO Box 727
Waite Park, MN 56387-0727
Office: (320) 202-3100
Fax: (320) 202-3139
Website: ivrvw.SandCompanies.com
E -Mail: SCI g&ndCompanies.com
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION
OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION & THAT I AM A DULY LICENSED
ARCHITECT UNDER THE LAWS OF MINNESOTA
SIGNATURE:
TYPED OR PRINTED NAME: RICHARD A. HENNINGS
REGISTRATION NO.: 12295
DATE: ----/--
THESE DRAWINGS AND SPECIFICATIONS ARE THE
SOLE PROPERTY OF SAND COMPANIES, INC. ANY
REPRODUCTION OR REUSE OF THESE DOCUMENTS IS
FORBIDDEN WITHOUT WRITTEN PERMISSION FROM
SAND COMPANIES, INC.
PROJECT NO.: 09-308
DRAWN BY: WAL
CHECKED BY: R. HENNINGS
DATE:
REVISED DATE: ARDEN
VILLAGE
ARDEN HILLS, MN
TREE MITIGATION
L-1.0
10-19-09
SYMBOL
MARK
COMMON NAME
SIZE
QUANTITY
TOTAL TREE
BOTANICAL NAME
CALIPERSTREES
RED MAPLE
A
ACER RUBRUM
3' B&B
B
24'
AMERICAN LINDEN
B
TILIACORDATA
r B&B
21
63'
HACKBERRY
C
I CELTIS OCCIDENTALIS
r B&B
13
39'
PAGODA DOGWOOD
O
p
CORNUS ALTERNIFOLIA
2-10 B&B
6
20'
RED SPLENDOR CRABAPPLE
O
E
MALUS RED SPLENDOR
1-112' B&B
2
WA
BLACK HILLS SPRUCE
®
F
PICEA GLAUCA DENSATA
6 FT. B&B
14
14x2.5 = 35'
SCOTCH PINE
®
G
PINUS SYLVESTRIS
6 FT. B&B
10
10x2.5 = 25'
TANNENBAUM MUGHO PINE
®
H
PINUS MUGO TANNENBAUM'
6 Fr. B&B
3
3 x 2.5 = 7S
EASTERN PINE
®
J
PINUS STROBUS
6 FT. B&B
9
9 x 2.5 = 22.5'
o$o
SHRUBS IN ROCK MULCH BED AROUND BUILDING
TOTAL TREE CALM
SHRUBS
'iECHNY GLOBE' ARBROVITAE
INCHES ° 23r
ATG
THUJA OCCIDENTALIS
24' POT
21
CURRANT ALPINE
CA
RIBESALPINUM
24' POT
12
RED TWIG DOGWOOD
DRT
CORNUS ALBA-ELEGANi1SSIMA'
24' POT
22
JUNIPER ANDORRA
JA
JUNIPERUS HORIZONTALIS m
36' POT
14
JUNIPER BLUE CARPET
JBC
JUNIPERUS SABINA (CALGARY)
36' POT
13
SPIREA GOLD MOUND
SGM
SPIREAXMOUNO
24' POT
36
SPIREA SNOW MOUND
SSM
SPIREA NIPPONICA
24' POT
36
YEW TAUTON
YT
TAXUS X MEDIA
36' POT
7
t
s
..SCI
Sand"Companies, Inc.
Construction • Property Management 0 Dei elopment
366 South Tenth Avenue
PO Box 727
Waite Park, MN 56387-0727
Office: (320) 202-3100
Fax: (320) 202-3139
Website: ivrvw.SandCompanies.com
E -Mail: SCI g&ndCompanies.com
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION
OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION & THAT I AM A DULY LICENSED
ARCHITECT UNDER THE LAWS OF MINNESOTA
SIGNATURE:
TYPED OR PRINTED NAME: RICHARD A. HENNINGS
REGISTRATION NO.: 12295
DATE: ----/--
THESE DRAWINGS AND SPECIFICATIONS ARE THE
SOLE PROPERTY OF SAND COMPANIES, INC. ANY
REPRODUCTION OR REUSE OF THESE DOCUMENTS IS
FORBIDDEN WITHOUT WRITTEN PERMISSION FROM
SAND COMPANIES, INC.
PROJECT NO.: 09-308
DRAWN BY: WAL
CHECKED BY: R. HENNINGS
DATE:
REVISED DATE: ARDEN
VILLAGE
ARDEN HILLS, MN
TREE MITIGATION
L-1.0
10-19-09
020
*W
Coll 48 Hours before digging:
GOPHER STATE ONE CALL
Twin City Areo 651-454-0002
h
ly W
ly O
6'
- 984.
3
PROPERTY LINE
Rain Garden Plant Schedule
CODE
QTY
COMMON NAME/LATIN NAME
SIZE
ROOT
REMARKS
BNS
86
BONESET
PLUG
SEEDLING
PLANT 18" O.C.
FINISH GRADE -
MAXIMUM OF 60% PASSING THE #40 SIEVE.)
Eupotorium perfoliatum
—30% ORGANIC (PEAT MOSS, HYPNUM OR SPHAGNUM)
- ''' ;;•`'. '
BASE
BFG
117
BLUEFLAG
PLUG
SEEDLING
PLANT 18" O.C.
_`
2. INFILTRATION RATE OF RAIN WATER GARDEN TO BE DRY WITHIN 48
Iris versicolor
HOUR PERIOD, UNLESS DESIGNED OTHERWISE.
3. CONTRACTOR TO PROVIDE RAIN WATER GARDEN INFILTRATION TESTING
SEE STORM SEWER PLAN FOR CONNECTION.
BASE
CLR
TO INSTALLATION OF PLANTS AND MULCH.
CULVER'S ROOT
PLUG
SEEDLING
PLANT 18" O.C.
1 134
Veronicastrum virginicum
BASE
BES
BROWN—EYED SUSAN
PLUG
SEEDLING
PLANT 18" O.C.
204
Rudbeckic subtomentoso
BASE / SIDESLOPE
SWG
359
SWITCHGRASS
PLUG
SEEDLING
PLANT 18" O.C.
Ponicum virgatum
SIDESLOPE
GOA
283
GOLDEN ALEXANDERS
PLUG
SEEDLING
PLANT 18" O.C.
Zizio aures
SIDESLOPE
NEA
113
NEW ENGLAND ASTER
PLUG
SEEDLING
PLANT 18" O.C.
Aster novae—anglioe
BASE
JPW
JOE—PYE—WEED
PLUG
SEEDLING
PLANT 18" O.C.
112
Eupotorium mcculotum
BASE
CAT
32
CATERPILLAR SEDGE
PLUG
SEEDLING
PLANT 18" O.C.
Corex crinito
BASE
ROD
RED—OSIER DOGWOOD
18"
#2 CONT,
PLANT 5'-0" O.C.
21
Cornus sericeo
HT.
BASE
BCB
31
BLACK CHOKEBERRY
18"
#2 CONT.
PLANT 5'-0" O.C.
Aronico melonocorpo
HT.
BASE / SIDESLOPE
HBC
25
HIGH BUSH CRANBERRY
18"
#2 CONT.
I
PLANT 5'-0" O.C.
Viburnum trilobum
HT.
SIDESLOPE
QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE.
CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN.
Rain Garden Notes
1. REFER TO PLANTING DETAILS FOR PLANTING INSTALLATION METHODS AND GUIDELINES.
2. PROVIDE AND INSTALL EROSION CONTROL BLANKET AT RAIN GARDEN AREA SIDESLOPES
AFTER ALL PLANTING HAVE BEEN INSTALLED. BLANKET TO BE ONE SEASON GEOJUTE,
MNDOT CATEGORY 2 (STRAW 1S, WOOD FIBER 1S), OR APPROVED EQUAL. BLANKET TO BE
OVERLAPPED BY 4" AND ANCHORED BY SOD STAPLES. PLACE BLANKET PERPENDICULAR
TO THE SLOPE. TRENCH IN EDGES OF BLANKET AREA TO PREVENT UNDER MINING.
PROVIDE SILT FENCE AT TOP OF SLOPE AS NEEDED.
3. SHREDDED HARDWOOD MULCH TO MATCH OTHER PROJECT PLANTING MULCH. PLACE 4"
DEPTH OF MULCH AT ALL PLANTING AND EROSION CONTROL BLANKET AREA (NO FILTER
FABRIC).
4. REFER TO TYPICAL RAIN GARDEN CROSS—SECTION FOR DESIGN DETAILS. DRAINTILE TO BE
" AT BOTTOM OF SECTION AND CONNECTED TO STORM SEWER SYSTEM. COMPACTION
AND/OR SOIL EROSION IN THE RAIN GARDEN SOIL PROFILE IS NOT ALLOWED. REMOVE AND
REPLACE AS NEED TO PROVIDE PROPER INFILTRATION AND DRAINAGE REQUIREMENTS PER
ENGINEERS APPROVAL.
0' 20' 40' 60'
elt
s$
104—
a 74—(
88—c
,��6
-026- 8 -HB
e46
k"— —Rra
6—ROD
PERENNIAL PLANTING
REMOVE CONTAINER, SET SOIL
MASS ON COMPACTED SOIL MOUND
MATCHING PERENNIALS NATURAL
GROUNDLINE WITH FINISHED SITE
GRADE.
ALL PERENNIAL PLANTING BEDS
SHALL RECEIVE 2" COMPOST
MULCH.
EDGE ALL PLANTING BEDS WITH
SPECIFIED EDGER WHERE
ADJACENT TO LAWN AREAS.
CULTIVATE TO 10" MINIMUM.
SCARIFY SIDES AND BOTTOM OF
HOLE.
BACKFILL PLANT PIT WITH 1/4
PART COMPOST TO 1 PART
EXISTING TOPSOIL, WELL MIXED.
V
;T REMS
LA26
REMOVE CONTAINER, SET SOIL MASS
ON COMPACTED SOIL MOUND
MATCHING SHRUBS NATURAL
GROUNDLINE WITH FINISHED GRADE.
ALL PLANTING BEDS SHALL RECEIVE
4" OF SPECIFIED MULCH AND WEED
BARRIER FABRIC.
EDGE ALL PLANTING BEDS WITH
SPECIFIED EDGER WHERE ADJACENT
TO LAWN AREAS.
SCARIFY SIDES AND BOTTOM OF
HOLE.
BACKFILL PLANT PIT WITH SPECIFIED
BACKFILL SOIL.
N.T.S.
LAST REVISED:
SHRUB PLANTING
„rti„r LA27
FINISH GRADE L — _ OVERFLOW STORM SEWER MANHOLE OR CATCH BASIN.
NEENAH R-4370-25 BEEHIVE CASTING & FRAME,
3.1 VERIFY WITH STORM SEWER PLAN
3:1
DRAINTILE/OVERFLOW SECTION '
4" DRAINTILE CONNECT TO STORM SEWER OR DAYLIGHT
N. T. S.
LAST REVS
TYPICAL RAIN GARDEN CROSS-SECTION
LA22
20095061PLF01.dwg
Sand Companies, Inc
C-----fi-*PropeM Maoagennowevelopme.
366 South Tenth Avenue
PO Box 727
Waite Park, MN 5638 7-072 7
Office: (320) 202-3100
Fax: (320) 202-3139
Website: www.SandCompanies.com
E -Mail: SCI@SandCompanies,com
mod
Vla flood Pro emkIm ai Serviem tnc.
370112th St. N., Subs 206
5.Coud,MN56=
PHONE 320253-M
FAX 3202533737
TOLLFREE 13004709195
vllwllkv--!---odpLcwn
I hereby acetify tbat this phn was
161% rad by me or Hader sky direct
snpervWm and that I am a duly
HewA d LANDSCAPE ARCEII'1BCr
under the lam of the
State of Ninneeota,
Date: License Na
Dubxe&
eChedm&
Drawn:
Ddc
Bevidou Date
RAIN GARDEN
LANDSCAPE PLAN
L-1.2
ANTI—WASH/GEOJUTE EROSION CONTROL FABRIC (MN/DOT 3883, TYPE 2)
VARIES, SEE GRADING
AND LANDSCAPE PLANS
ON SIDESLOPES OF 3H:1V OR GREATER. ANCHOR FABRIC WITH SOD STAPLES
AND PROVIDE 4" OVERLAP. TRENCH EDGES OF FABRIC TO
PREVENT UNDERCUT. COVER WITH 4" DEPTH SHREDDED HARDWOOD MULCH
FINISH
RA FINISH GRADE
THROUGHOUT.
3:1 �''
36" DEPTH PLANTING SOIL MIX, UNCOMPACTED IN 6" LIFTS
3.1
-..•� VARIES SEE GRADING PLAN
AND TILL 6" DEPTH INTO NATIVE SOILS.
—70% SAND, (5% PASSING THE /200 SIEVE, AND A
FINISH GRADE -
MAXIMUM OF 60% PASSING THE #40 SIEVE.)
—30% ORGANIC (PEAT MOSS, HYPNUM OR SPHAGNUM)
- ''' ;;•`'. '
NOTES:
1. PROVIDE SEDIMENT BASIN AT ALL INLETS WITH RIP RAP. VERIFY BASIN
SIZE AND RIP RAP TYPE PER PLAN, AND/OR WITH
• s�` - .'` SLOPED SUBGRADE
ENGINEER/LANDSCAPE ARCHITECT.
_`
2. INFILTRATION RATE OF RAIN WATER GARDEN TO BE DRY WITHIN 48
SECTION 4" PVC~ CON TECH A2000 SLOTTED DRAINTILE,
HOUR PERIOD, UNLESS DESIGNED OTHERWISE.
3. CONTRACTOR TO PROVIDE RAIN WATER GARDEN INFILTRATION TESTING
SEE STORM SEWER PLAN FOR CONNECTION.
AND OBTAIN APPROVAL BY ENGINEER/LANDSCAPE ARCHITECT, PRIOR
COARSE FILTER AGGREGATE(MnDOT 3149.2H)
TO INSTALLATION OF PLANTS AND MULCH.
GEOTEXTILE FABRIC—TYPE II(MnDOT 3733), 12" DIA. MIN.
FINISH GRADE L — _ OVERFLOW STORM SEWER MANHOLE OR CATCH BASIN.
NEENAH R-4370-25 BEEHIVE CASTING & FRAME,
3.1 VERIFY WITH STORM SEWER PLAN
3:1
DRAINTILE/OVERFLOW SECTION '
4" DRAINTILE CONNECT TO STORM SEWER OR DAYLIGHT
N. T. S.
LAST REVS
TYPICAL RAIN GARDEN CROSS-SECTION
LA22
20095061PLF01.dwg
Sand Companies, Inc
C-----fi-*PropeM Maoagennowevelopme.
366 South Tenth Avenue
PO Box 727
Waite Park, MN 5638 7-072 7
Office: (320) 202-3100
Fax: (320) 202-3139
Website: www.SandCompanies.com
E -Mail: SCI@SandCompanies,com
mod
Vla flood Pro emkIm ai Serviem tnc.
370112th St. N., Subs 206
5.Coud,MN56=
PHONE 320253-M
FAX 3202533737
TOLLFREE 13004709195
vllwllkv--!---odpLcwn
I hereby acetify tbat this phn was
161% rad by me or Hader sky direct
snpervWm and that I am a duly
HewA d LANDSCAPE ARCEII'1BCr
under the lam of the
State of Ninneeota,
Date: License Na
Dubxe&
eChedm&
Drawn:
Ddc
Bevidou Date
RAIN GARDEN
LANDSCAPE PLAN
L-1.2
0 2009 Westwood Professional Services, Inc.
• lNSF =952
- : �MFIG=47.f.64
ar�u-gar. r9- E : �u=96� is f
I
:_
:
x:Q
INV-9775INV-97
BUILDING
:
7N1f�—. . .
7
WN R- IH
O E BE EL COLLEGE dr SE
MINARY
I
..................................................=
:n
I
..
::
...=:
I
I
•: •:-: •. 3 .•.'.'.'.•.'. •.•.'.' .•. •. •.• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
LEGAL DESCRIPTION: (PER TIME COMMITMENT NO. f 02053)
State of Minnesota
Ramsey County
Lot 1, Block 1, Land O'Lakes Addition
(Torrens Property, Certificate of rifle No. 292192)
SURVEYOR'S NOTES:
1.) This survey was prepared using the rifle Commitment provided by Tri -County Abstract and rifle Gouronty, Inc., Commitment No. 102053, having on effective date of September 4, 2009 at 8.00 AM,
2.) Zoning information and setback requirements ore per the City of Arden Hills Planning Division. The subject property is zoned */-I". Limited Industrial District. Building and parking setback requirements
for I-1 zoning are as follows:
Building setbacks
Front yard- 55 feet
Side yard- 20 feet
Rear yard- 20 feet
Parking setbacks:
Right of Way- 20 feet
Side yard- 5 feet
Rear yard- 5 feet
3) There was no observable evidence of earth moving work, building construction or budding additions at the time of survey.
4.) Fieldwork to complete this survey was performed on October 9, 2009.
5.) Land Area = 120,304 Sq. ft. or 2.76 acres.
6.) The underground utilities shown hove been located from field survey information and existing drawings. The surveyor makes no guarantees that the underground utilities shown comprise all such utilities in
the area, either in service or abandoned. The surveyor further does not warrant that the underground utilities shown ore in the exact location indicated, although he does certify that they are located as
accurately as possible from information ovoilable. The surveyor has not physically located the underground utilities. Gopher State One Call Ticket No. 90514887
7.) The Surveyor is not quolified to make a determination as to the subject property being used as a waste dump, sump or sanitary landfill, although there is no obvious evidence of this being the case.
8.) At the time of survey, there was no observoble evidence of cemeteries and no research of historical records was mode by the surveyor.
9.) Property is subject to Exceptions listed in Schedule B -Section 11 of said rifle Commitment No. 102053 rhe exceptions ore listed as they appear in said rifle Commitment:
1. Subject to an easement for transmission line purposes, together with the incidentol rights connected therewith, in favor of Northern States Power Company, as set forth in the instrument recorded in
Book 1901 of Romsey County Records, page 520, as to that part of said 50 foot strip of land lying North of a line drown parallel to and 72.5 feet South of the North line of Northwest Ouorter of the
Northeast Ouorter, Section 27, Township 30, Range 23.
Note: Said instrument also riled of record 04/29/1964, as Document Number 470086. (affects subject property- shown on survey)
m. Subject to the restrictions and snow fence easement in favor of the State of Minnesota as set forth in the instrument recorded in Book 2064 of Ramsey County Records, page 15Z (does not affect
subject porcel-shown on survey)
n. The following items appear as memoriols on the Certificate of Title and will carry forward to any subsequent Certificote of Title:
Notice of Lis Pendens filed 10/02/1945, as Document Number 223640.
Notice of Lis Pendens riled 01/08/1959, as Document Number 399585.
o. The following item appears as a memorial on the Certificote of Title and will carry forward to any subsequent Certificate of rifle.-
Easement
ifle:Easement in favor of Northern States Power Company as filed 02/26/1971. as Document Number 554970. (does not affect subject property)
SURVEYOR'S NOTES (CONTINUED):
p. Drainage and Utility easements as shown on the recorded plat. (affects subject properfy-shown
on survey)
q. Rights of Tenants, as tenants only, under unrecorded leases.
r. Terms and conditions of Leases and any subleases or assignments thereof, related to Cell. Tower
Leases as evidenced by Lease filed as Document Number 576994 and Recognition and Attornment
Agreement riled as Document Number 1930374. (affects subject property -not plottob/e)
Note: The lease instruments of record do not specifico/ly confine that portion of the subject
property affected by the lease.
s. Subject to Final Certificate and any limitation of direct access contained therein, riled 04/02/1955,
as Document Number 346124.
L Subject to Final Certificate and any limitation of direct access con toined therein, Ned 09/13/1963,
as Document Number 461204.
u. Subject to Final Certificate and any limitation of direct access contained therein, filed 07/28/1967,
as Document Number 512852.
10,) The subject property lies within Zone C (Areas of minimal flooding) per FEMA Community Panel
Number 270375 0002 B. dated July 2, 1981.
11.) There are no marked parking stalls on the subject property.
12.) Upon reviewing the Final Certificate documents referenced in the title commitment, the surveyor
discovered a Warranty Deed recorded in Book 496 of Deeds. Page 144 which conveys a 50 -foot
wide strip of land to the St. Croix Falls Minnesota Improvement Company for a transmission line.
It is not clear if any right or interest still exists in said 50 -foot strip, but its locotion is shown
on the survey.
13) Existing building coverage - 2,160 sq, ft.
14.) Existing hard surface coverage- 13.705 sq. ft.
DEVEL OPAIIENT SUMMARY
Owner:
U.S. Bank, National Associotion, as
Personal Representative of the
Estate of George J. Relling
US Bank, NA, 101 East Fifth Street,
EP MN s-10,
PO Box 64142
St. Paul, MN 55164
Developer.
Arden Village, LLC
PO Box 727
366 South 10th Avenue
Waite Pork, MN 56387
Engineer/Surveyor:
Westwood Professional Services. inc.
3701 12th St. N. Suite 206
St. Cloud, AN 56303
Coll 48 Hours before digging:
GOPHER STATE ONE CALL
Twin City Area 651-454-0002 /
/
/
/
/
V- ♦ ♦
♦
♦
♦
Elevations shown are based upon NAVD 88. ♦ \
Benchmark- MnDot Station Frederickson MNDT RM 1 \
Elevation = 969.46 ♦ \
). Tree Dia. DBH Species Tree I.D. Tree Dia. DBH Species Tree I.D\ Tree Dia. DBH Species \
10.5 Green 1 093 1 10.5 1Green Ash SS8 11.2 silver Ma le
-PUG- POWER UNDERGROUND
-SAN- SANITARY SEWER
-sra- STORM SEWER
- IG -
TELEPHONE UNDERGROUND
-war- WATERMAIN
-x- FENCE. LINE
CURB do GUTTER
—Poli— POWER OVERHEAD
-FOP- FIBER OPTIC
❑s CURB STOP
Bearings shown ore based upon the Ramsey
County Coordinate System, NAD 83, 86adj
30 0 30 60 90
Scale in feet
EXXXX) Record bearing per LAND 0' LAKES ADD1 7ON
e Denotes found monument
0 Denotes 1/2 inch by 14 inch iron monument
set and marked by License No. 45873
20095061 PPF01.dwg I
Sand Companies, Inc
Co=Property Management *Development
366 South Tenth Avenue
PO Box 727
Waite Park, MN 5638 7-0 72 7
Office.- (320) 202-3100
Fax. (320) 202-3139
Website: www.SandCompanies.com
E -Mail. SCI@SandCompanies. com
Vieshvwd
Vllieitwood Pro ewil jai S/flli % W-
3701 12th St. N., Suite 206
St. Cloud, MN 56303
PHONE 320-253-9495
FAX 320-253-5737
TOLL FREE 14600-270-9185
vrwumwestwoodps cam
NOT FOR
CONSTRUCTION
I hereby certify that this plan was
pmpumd by me or under my direct
supervWon and that I am a duly
licensed LAND SURVEYOR under the
Ion of the State of Idinnesota.
Nathan H. Carlson
Date: License No,
DesiAneck
Cbedrod: RTG
Drawn: NHC
Dais 11/02/09
Revision Date:
ARDEN
VILLAGE
ARDEN HILLS, MN
PRELIMINARY PLAT
C-0.0
LEGEND
OtD
HYDRANT
0
STE'EL/WOOD POST
ELECTRIC METER
-4-
SIGN -TRAFFlC/OTHER
®S
SANITARY MANHOLE
p
MAIL BOX
®
CATCH BASIN
GAS METER
®
FLARED END SECTION
ra,
POWER POLE
CONCRETE SURFACE
ELECTRIC BOX
`sar`i
GRAVEL SURFACE
st
STORM MANHOLE
-
BITUMINOUS SURFACE
ID
TELEPHONE BOX
-cA5-
GAS LINE
-PUG- POWER UNDERGROUND
-SAN- SANITARY SEWER
-sra- STORM SEWER
- IG -
TELEPHONE UNDERGROUND
-war- WATERMAIN
-x- FENCE. LINE
CURB do GUTTER
—Poli— POWER OVERHEAD
-FOP- FIBER OPTIC
❑s CURB STOP
Bearings shown ore based upon the Ramsey
County Coordinate System, NAD 83, 86adj
30 0 30 60 90
Scale in feet
EXXXX) Record bearing per LAND 0' LAKES ADD1 7ON
e Denotes found monument
0 Denotes 1/2 inch by 14 inch iron monument
set and marked by License No. 45873
20095061 PPF01.dwg I
Sand Companies, Inc
Co=Property Management *Development
366 South Tenth Avenue
PO Box 727
Waite Park, MN 5638 7-0 72 7
Office.- (320) 202-3100
Fax. (320) 202-3139
Website: www.SandCompanies.com
E -Mail. SCI@SandCompanies. com
Vieshvwd
Vllieitwood Pro ewil jai S/flli % W-
3701 12th St. N., Suite 206
St. Cloud, MN 56303
PHONE 320-253-9495
FAX 320-253-5737
TOLL FREE 14600-270-9185
vrwumwestwoodps cam
NOT FOR
CONSTRUCTION
I hereby certify that this plan was
pmpumd by me or under my direct
supervWon and that I am a duly
licensed LAND SURVEYOR under the
Ion of the State of Idinnesota.
Nathan H. Carlson
Date: License No,
DesiAneck
Cbedrod: RTG
Drawn: NHC
Dais 11/02/09
Revision Date:
ARDEN
VILLAGE
ARDEN HILLS, MN
PRELIMINARY PLAT
C-0.0
C 2009 Westwood Professional Services, Inc.
CONCRETE PED
RAMP
CONCRETE PED
RAMP I
I
Grading Notes
1. LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS
SHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY
SITE CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION.
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF ANY DISCREPANCIES ARE
FOUND.
2. CONTRACTORS SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS
AND DIMENSIONS OF VESTIBULE, SLOPED PAVEMENT, EXIT PORCHES, RAMPS,
TRUCK DOCKS, PRECISE BUILDING DIMENSIONS, EXACT BUILDING UTILITY
ENTRANCE LOCATIONS, AND EXACT LOCATIONS AND NUMBER OF DOWNSPOUTS.
3. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF
"STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION AND BACKFILL/SURFACE
RESTORATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF
MINNESOTA.
4. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL
AND SOD OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY STAND
OF GRASS IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND TURF
ESTABLISHMENT.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING
TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL
SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE
NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE
ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM
TO APPROPRIATE MNDOT STANDARDS.
6. ALL SLOPES SHALL BE GRADED TO 3:1 OR FLATTER, UNLESS OTHERWISE
INDICATED ON THIS SHEET.
7. CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING AND
PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN POINTS
WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS AND EXISTING
GRADES.
8. SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS & GUTTER
FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARE TO FINISHED
SURFACE GRADE.
9. SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS.
10, CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS
AFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THE
CONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNER
ACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES.
11. CONTRACTOR SHALL PROVIDE A STRUCTURAL RETAINING WALL DESIGN CERTIFIED
BY A LICENSED PROFESSIONAL ENGINEER.
12. ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES
INCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
PERMIT REQUIREMENTS.
13, PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, AT
MINIMUM, WILL BE REQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BE
ACCOMPLISHED BY MAKING MINIMUM OF 2 COMPLETE PASSES WITH
FULLY -LOADED TANDEM -AXLE DUMP TRUCK, OR APPROVED EQUAL, IN EACH OF
2 PERPENDICULAR DIRECTIONS WHILE UNDER SUPERVISION AND DIRECTION OF
THE INDEPENDENT TESTING LABORATORY. AREAS OF FAILURE SHALL BE
EXCAVATED AND RECOMPACTED AS SPECIFIED HEREIN.
14. EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKING
AREAS SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITY
METHOD AS OUTLINED IN MNDOT 2105.3F1 AND THE REQUIREMENTS OF THE
GEOTECHNICAL ENGINEER.
15. EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS OR
PARKING AREA, SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF
THE ORDINARY COMPACTION METHOD AS OUTLINED IN MNDOT 2105.3F2.
16. ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENT
GEOTECHNICAL ENGINEER, EXCAVATION FOR THE PURPOSE OF REMOVING
UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE
GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING ALL REQUIRED SOILS TESTS AND INSPECTIONS WITH THE
GEOTECHNICAL ENGINEER.
M I ra-1-ft. 0. *�-v 0- msgw Moms
L %=EE� I
0' 30' 60' 90'
Coll 48 Hours before digging:
GOPHER STATE ONE CALL
Twin City Area 651-454-0002/
/
Grading Legend
--- - qLj-,
EXISTING CONTOURS
.•-980=
PROPOSED CONTOURS
�ell-
TOP AND BOTTOM OF RETAINING WALL
856,3
EXISTING SPOT ELEVATION
66.30
PROPOSED SPOT ELEVATION
�l
(CURB ELEVATIONS ARE AT TOP OF CURB)
—�
FLOW DIRECTION
62.80
EMERGENCY OVERFLOW
ELEVATION
—r►—�
PROPOSED STORM SEWER
®—S7
EXISTING STORM SEWER
—rr►s—
EXISTING GAS LINE
—Pa+--
EXISTING OVERHEAD POWER
—PUG—
EXISTING UNDERGROUND POWER
— rtw—
EXISTING OVERHEAD TELEPHONE
—Iuc—
EXISTING UNDERGROUND TELEPHONE
—crv—
EXISTING UNDERGROUND TELEVISION
— x —
EXISTING FENCE
EXISTING TELEPHONE BOX
Q
EXISTING ELECTRICAL BOX
G
EXISTING STORM MANHOLE
®
EXISTING STORM CATCH BASIN
r0i
EXISTING POWER POLE
®
PROPOSED PEDESTRIAN RAMP (SEE DETAIL)
'
EXISTING TREES TO REMAIN
EXISTING BITUMINOUS
EXISTING BITUMINOUS TO REMOVE
20095061GDFOt,dwg
Sand Companies, Inc.
Condmedon#Property Management ftevelopmeot
366 South Tenth Avenue
PO Box 727
Waite Park, MN 5638 7-0 72 7
Office. (320) 202-3100
Fax: (320) 202-3139
Website: www.SandCompanies.com
E -Mail. SCI@SandCompaniesxom
Vikovood Protemloml Sewioes. Inc
3701 12th 9t. N. SuPoe 206
St. Cloud, MN sli=
PHONE XW453 9495
FAX 320,2539737
TOLL FREE 14KO4704M
www mestwoodps aom
NOT FOR
CONSTRUCTION
I hereby certify that this plan was
pmpuvd by sae at "Hier my direct
supervision and that I sm a duly
Hcenwd PROFESSIONAL BNTGRaM
I nder the laws of the State of
R T. Gpbn
Date I3oenee No,
Dedxne& RTG
Checked: RTG
Drawn; TAH
Date X/XXM
Revision Date X/XX/XX
ARDEN
VILLAGE
ARDEN HILLS, MN
GRADING & PAVING
PLAN
C-1.0
I
-
I .
I I
I
.
I
I
L� R�2 3 01 OI J5 Ok. 0.15 016 017 ab OI 018 0.18 dB L� 11h d9 Ul9 0.19 019 01B th dB �017 ab d6 015 d5 014 014 ah 013 013 0,63 012 Ok d2 012 012 01 all 01 011 all OR 01 R11 011 01 all at 01 01 I ot 01 all an 01 all 01 01 all at 01 all at 01 all all 01 all On 01 all OR ell all at 01 all 011 Ok all all Ok all 01 01 all DID Ole RIO able 01 all On 01 olo Ole Ile RIO Ole aho olo DID olo 610 Ole olo o -lo Olo all abo 01 olo olo Ill (
. + + + + + + + + + + + + + + + + + + + + +
Do A .00 ROO 02 ROD ROO ON ROO ROO ON ROO age 0.00 ROO ROO 02 C
022 0.02 3 ON 0.115 0,05 1106 i ROG U7 OM 10,09 0.10 010 010 all all 011 all Oil 011 all 011 OJO all 010 0.09 0,07 1106 22 0.02 1102 02 OR all OR OR O.Ol OR OR 0.01 am a& 0.01 OR am 0.01 am 0.01 0.01 On am all on am abi OR am abi on am A am am om abi OR III R OR III am am abi on am on OR om. om on am all OR am 1 R n all OR 01 ell Ox+ o.+ eDo a 0
.
+ + . . . . I + + . + . . . . . . . 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . + . . . . . . . . . . . + + + 0 . . . .
102 0.113 . 3 &04 0.115 R06 1106 1 0.07 0.09 11 eU all 10+11 R13 am, 0114 0.114 11+14 01+4 1111 5 0.114 01+3 OIJI 11+11 01+2 0+11 R+09 017 0.107 OI 016 R+04 0104 OM+ ah U+3 0+22 11+02 U+2 012 O,+02 Ol I on OR oli o1+2 on ell on on 01+01 Om OR 0.01 OR am 0.01 021 am A all OR 011 all all 011 On ell abi on on. A OR OR aoi OR on on. am am A am am Sol OR 02 0,01 OR 02 0.01 OR RDI 0,1111 On on ROI On On (101 02 Roo ROD 02 0,00 ROO O1 too ROD ON O.DO ROD ON Clo ROO A 0,00 ROO ON (
Ob3 ah 3 O� ah 01 6 0161 d5 dB RIO 013 0.16 0.18 018 0.1 B &19 018 RIB RIB 015 0.12 Ch 019 .010 dB O� 0I d6 th6 d5 d4 R& ah 63 013 ah 62 012 d2 d2 011 d2 012 Ok O.t2 012 012 d2 0.11 01 01 OlI 011 01 011 Ok d2 ah Ok d2 Olt 011 011 all 011 01 all all C+M all ell all all all 0+01 all all oll all 01 01 all all 01 all ell 01 all all 01 all Cla all all OR ol oll all 010 ate 01 Ole 610 Ole olo clo able ah RIO DID Clo olo Ole 010 RIO Olo (
+ + + + + + 1 + + + + + + + + + + + 4 + + + + + + + + + 4 Of + 04 + + + + + + + + + + + 4 + + + + + + + + + + + + + + + + + + + O+ 41 O+ O+ 0+1 O+ + +0 Ill + + O+ + +0 O+ O+ 40 O+ Ole + + + + +
103 1103 4 0.05 R05 0.06 1103 i R03 U3 1113 0.20 1122 023 0.23 0.23 023 023 0.23 023 022 ah 0.112 018 &+05 U+3 th J04 0106 016 d5 U45 014 R+04 01+4 02+3 a+03 06+3 012 O,+02 812 0+22 a+0 2 012 0+2 0.+0 2 012 0+2 OI 2 012 DIM 02 0.01 021 0.01 0,02 02 102 1102 42 0.02 .02 on on doi Roi am o.62 ok aO2 U2 OR 01 0.01 OR OR on on on abi on on om on am A on a& om OR on doi on m to bi I .a Ill A all .00 ROD &OO A (100 all .00 .00 to A too us 0.00 too 0.00 (
. . .
+ + + + + + + + + + + + + + + + + + + + + + + 4 + + + + + + + + + + + , + + + + + + +
I OM R04 4 025 ROG 01 5 0 M+ i R+02 0102 UI 0+24 0+25 0128 02+8 02+9 OI 0�8 O�q 019 028 027 R27 024 018 023 0.04 024 IL06 ROG 0.06 R06 0.05 0.05 13.05 R04 ON 0.03 U R02 0102 0 12 R0 2 0102 OM a0 3 0103 0 M U+2 012 R+02 0102 02+2 R+02 RI Ob+2 R+02 0102 012 O,0 22 022 0.02 092 0 12 0.1112 U2 1102 0,02 042 022 R02 0.01 OR OR 0.01 OR R02 0,02 R02 0,02 0.01 OR OR 0.01 OR 02 ROI OR OR 0.01 041 on 0.01 OR Om A OR doo Roo 0+2 01 ROO 0+2 010 Ol 0 0.00 0.00 ROO ON 0.00 ROO ROO Roo 0,110 0.00 (
014 O.1m 5 016 ah 01 7 Oh 1 0.15 OI B ? 01 014 O�3 OI 055 R57 69 69 R58 OI 056 O_� OI 0�6 051 a� 019 0.16 010 OI 017 & d6 016 Ok 015 015 a1k d3 013 ab 012 012 ah 013 ab 0I 013 01 Ob ab Ck d2 012 th? Rt2 OI 013 ab d3 ab ab 012 O� d2 d2 Ok d2 ak 013 O.b 013 012 d2 012 012 Ok 01 2 012 d2 012 012 Ob O,t2 R� 0.1 0.11 011 01 0.11 011 011 0.11 01 011 1111 0.101 0+2 all OlI OlI 010 01 OlD 0,18 01 III 010 able OI OI 0110 OI DID Olo RIO Ito Olo (
I
+ + + + + + 1 + + - + + + + +
ON R05 6 ON 0.09 0.10 017 i 0.24 026 5 a4l O�4 0.27 13,40 0.43 R+43 613 0+30 R+41 0142 11+43 0 M+ OI CAD CA+O 11+34 017 0124 0117 11+1 I 0+10 R+09 U7 017 ah Ob+6 02+5 a+04 (1+0 4 014 O,+03 U43 OM+ a+03 U+3 0 N+ a+04 U+4 OX+ a+03 0+23 013 O,+03 013 0 M+ R+03 013 0 X+ 0.104 0.404 0 14 O.+03 OD+3 0+23 O.+03 U+3 0 13 a+0 3 0+93 014 O.+04 OA+ 3 813 a+03 0102 012 11+0 2 OA+2 0+2 O.+02 a+0 2 013 al 2 U42 . 012 d 2 011 OR 0+2 U+2 012 R+02 0102 012 a+0 2 11101 OR 0+01 all OR O+D1 Ol 0 0110 ReD aCO 0+2 ROO 1+00 0+00 0100 Roo 0+2 0+00 Ol 0 01 0+00 al 0 0+3 C
+ + + + -
013 11+05 6 R09 0.10 all 0121 OI R+30 , 8-1-15'-f OA2 0+50 O.+64 0.116 R+94 R+84 1,173 L+27 O.+70 03+6 011 OI 05+7 05+8 R+37 O,+31 0126 0.113 0.113 0112 OIJO R+0 B 018 a+07 Obb 016 a+05 00+4 014 O.+04 RC4 04+4 a+0 4 0+04 0 M+ a+0 6 6+0 6 015 d5 0104 U+4 R+04 III 014 R+04 RI 015 0.05 015 O� O.+05 R+04 014 O.+04 U+4 Ol a+0 4 014 0 14 R05 02+5 015 11+04 6+03 013 0103 R+03 0 M+ O,+0 3 th 014 a+0 3 th 012 a+0 2 0102 U+2 11+02 U+2 0 12 O.+02 d2 012 d2 all OR 0+01 0111 OR 0+01 0+01 0+2 01+01 01+01 ON abo alo 0 olo atoo ROO 0+00 OI Ol 0 01+00 RIO 0 al 0 Roo (
' i ' , -
013 at .t5 017 010 th 0101 OI 014 "I, th O)IS 112 ZOO IA9 R� L!lO 2�7 2�4 014 11 L63 Lb 113 69 OI 0.50 R� 0.13 R� a� d9 01B 018 OI OIB 018 ab Ob5 015 d5 016 015 d5 d5 016 ab 017 017 1 OI 015 d5 016 015 d5 015 016 ab 67 017 O.& Ok 015 d5 ah 015 d5 d5 016 d6 016 016 d5 013 013 OI 01 4 014 O.& O& tt5 a1k d4 013 d2 012 Ck d2 013 013 0.4 013 012 at2 012 011 011 ol I all ol all at all all all oll. olo DID olo RIO olo olo DID olo olo DID ale (
I
+ + + + + + I + 4 - + + + + 4 + + 4 + + + + + + + + + + + + + + + + + + + + + + + I + + + + + + + O+ O+ 41 O+ O+ O+ O+ O+ O+ + + + + ola + + 4 4 + + + +
0.03 015 ON aog RIO all. t 0.21 0.18 .'1 117 L46 L64 2.86 L75 313 ?_5B 321 1.81 W L57 L46 L16 R54 a28 022 0.23 0.15 R14 012 010 1109 010 DID alo a09 ROB ON OX 0,07 ROB 026 0.06 0,06 ROB aO9 0.09 OR ROB 0.06 106 0,06 On ROG ROG &06 OBB ROB U9 ON R07 RUG 1106 R06 037 1106 1316 0.06 ON ROB ROB ON 10.106 1104 1104 0.04 0.05 R05 0.05 0,05 ROG 0.115 015 013 OI 0102 U+3 O.+03 d4 0 14 0.04 0.03 OM 0.02 0.02 III .01 0.0 m .01 .01 III A .01 101 02 He 02 ROO 0.00 0.00 ROO 0.00 0,00 too ON (
+ + + + + ' + + + + I + + + + + + + + + + + + + + + + + + + + + + + + + + +
I 1 0+18 6+20 . OI 2 2+0 I 1+3 1371 L+73 116 1+32 O+ 19 R17 0.14 all all 0.12 all 112 010 010 ROB ObB R09 0.10 109 107 ROB 019 010 1111 010 110 9 R 017 R09 RO 019 R07 01 019 Oh 1111 029 O.09 07 017 R09 R09 0 19 0.0 7 RB 029 O.09 al 019 R09 U6 U5 Ok Ok 016 a 6 t 017 06 0.04 a03 O 0 0
R04 0.06 047 0.10 R12 0.15 1 166 1.71 L69 1.78 2.66 2�3 M .4 2.82 .5 .21 014 0+21 al I I I I + I I + ,03 014 0,05 10,05 1105 0,04 0.04 023 0.03 0.02 1102 0.01 0.01 m .01 0.01 OR OR 0.01 OR 0.01 ROD ON 0.00 ROO 02 0.00 ROO 02 0,00 ROO ON (
013 111m 016 019 0.10 R13 0,171 OI 016 I! a 2 55 L� L�2 1.4 2. Z� 96 Z� 0 P-12 L�l 139 02 III R� a� 6o o.� &�3 010 0.17 0,14 0.16 015 0.15 R16 014 0.13 010 6 01 0.12 all 010 0.12 013 0.13 0.14 013 0.12 019 010 011 OI ell d9 O� O� 613 R14 013 0.12 019 0+10 6 OI all R19 R12 R� 0,13 a14 O� 0.12 d B 018 Rh 019 017 ab 0.10 010 d9 Ob 014 RIk O& 016 d6 III 016 1 d5 014 ah 013 d2 d2 Ol I 011 011 011 OR 01 0.11 U+ I OlD RIO Ole 0.10 do the dO do the 010 Ile ale _ (
+ + + + + + + 1 + 4 - + + + _� __ _r___-F___r___r___T ---- T___77 --- r --- T----.F---T ---- r --- T____T ---- F ---- T ---- :F---'; ---- T ----:F --- :F --- T ----:F --- :F --- :17-77-7 ---- :F -----F --- T7---'F----:F --- T ---- T------F---T----r-----F --- :17 --- r----r---:F --- T ---7----r --- :F---T----47---T----:F----F---f'-----F-----F --- T ----:F --- :17-7-717-77 --- 7 --- T ------F --- T------F---r --- r --- :17 --- T----F---T ---- T7 --- 7-717 --- �F --- �F --- T-7+7-77-47 --- �17 --- �17 --- T---7F__--F_'_T ---- :17 _1 --7T ---- T7 --- T------F---f ------ ;----T ---- r --- r --- r--47 --- :7 --- :F ---f-- -
ON 0,06 02B 010 0.15 R19 0.23i 0.26 0.30 1. 11 0.6 0. 0,79 1.94 1.97 E07 9 1.77 056 0.71 0.78 0.79 0.41 037 0.31 0.29 028 0.23 0,19 121 020 0.19 0.18 018 0.18 116 0.13 0.14 0.15 0.13 0.12 OJIG 017 0.16 aIG 0.16 0.16 0,15 012 0.13 0.14 013 0.12 R16 016 0,16 0.16 0.16 0.16 W5 0.2 0.13 0.14 013 0.12 0.15 016 0.16 015 RIG aI6 0.14 all 0.10 0.11 R09 ROB 0.12 0.13 0.12 0.07 1106 0.05 0.05 107 0,07 017 0.08 0.06 0.06 0.05 0.04 ON OM 0.1113 0,01 OR On 0.01 ROI 0. I 0.01 OR 0.01 ROD ON 0.00 1100 0.90 OR ROD 0.00 0.00 ROD ON (
I I
. . . . . . . I + 4 . + + + +_ + *---*- R2F-'7'-o'- -+-- *____+___�__ -*---*- -f---.i---+---+- . -_ --*.---+---+---*---4---l�.--.i�---+-- _*___
J 9 0.63 . I . 11 . � L �1 + -7 �k§_ o* _' +_ _'
OX ROB 0.10 014 0,23 0.30 0,341 0.78 026 , , , , , 1.78 ��--L'f9-Y.7'C--0*7�-L'f5--Ll'O--O*7�-D'f9-�.4'6--O*3F-O-,*2-5-0-2+--9--o,26 0,24-�l'f�Ok-O'EF2-023O16O.I6M8 0,20 0,15 20 -0,-+ff-f2+-�-0*1�--O-.+l-5-tl7--O*l�--O-.+1-5-022 -020 0,19 0.15 10FII 014 0.15 0.17 014 0.15 022 -020 RI9_t15__011§__a+9_&2I 0.13 0.12 0.13 -0�*�-a-+f9-tl67--O-,+16--O�i4--�iO-C-O-L+-i--a-+C7-�,+O�-o-�+-g--O.+cB- 16-0.0-8--0108 - - - - - - 102 0,02 1101 01 I 0.01 041 0.01 d01-o1F-0,1F1-�,`C1-Um RDI 0.01 0.00 0.00 ROD 02 (
' I � __Y__ -
016 d9 0.16 O�2 Ob 059 OA61 019 O�9 .I L59 1,�5 2.+45 65 ?_1 7 2 0 64 2�6 - 4 2� IJIG Lb I 11 U. U IJJ LhblJ 11.4111 JJ8 J.Jb I JJIJ W1 Ucfl n Ueb I I 11.11:1 I U.1 J.. / uld I / I Z4 I LL 8 U... - I 0. 4 0 6 0.7 ( .', I.I. tl 1b I U,db UZA 11 e�e LU U,dJ I UZb 1111111 / I J. � Ulb 11 8 UZ UZ4 I fd U.11 & I ll.d� J U.. � 1.1.11 U111 U. Ll 1.1,11) alls RIO 019 OI . . 8 017 Ok Ob5 - - -2 012 all ell 01 all ell OR ell OR all all all DID 0 N (
+ + + + + + + 1 4 + . + + + + + + + + . + + .. + . 4 + + + + + + + + + + + .. + + .. + + + 4 + + + + " + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 4 + + + +
0.14 RIB 024 032 R40 V52 0.721 a9D R91 . L 5 134 212 L42 E12 E47 P-4 23 2 lL5 P-07 1.05 1.119 1.43 1 . 123 R94 CA 0.63 0.53 0.47 15 .46 1 .26 &34 033 0.21 0. 2&0 02 0.19 0.11 032 a� 012 R+21 11+23 R+31. 0.31 0+20 ( i DID 1+9 a� R`31 0+32 a� R+2. 0123 a 1 R31 120 0.19 020 019 0.21 0.3. 0.32 0.11 0.20 .21 R30 029 OB 0.17 O.I( 012 R.3 023 (23 0.15 0.12 0.11 0,13 R13 0.14 0 014 0.15 R14 02, 010 0.09 ON 0.1112 0.02 OL3 103 0.03 10P Il 0. I 0. . .91 09i .1011 0.01 OR OR 0,01 On 0.00 ROD ON (
+ + + + + + + , + I ' " .. + + + + .. + + + + + + + + + + + + + + + + I
- I 04 0 2 0 ol on on aoi on a& om on On. om on
0,16 R� R+310 03+7 0145 OA5 0166 I R+78 R+84 . OI 47 1.60 1.61 Z04 2.07 Z28 2 ... am Z03 IA6 L�.5 L+D9 I i LC6 (187 R+75 0167 OAS OA5 CA CAB CI 33 o2+9 ,+28 a+37 03+8 0+25 a+2&0 02+1 0+20 OI 15 03+5 13+21 oI 0,121 02+2 11+33 0+35 0+23 ( ) 0.121 1+9 OI 02'5 0+32 OI R+2 0122 OI Q 03+4 1+23 0.119 all 01+9 0124 03+3 j 0+32 RK 0120 +21 11+30 0,51 11121 0.17 all 0115 11.7 02+7 (+24 0,114 0.113 0112 13,113 0114 I 0.12 0.14 0,19 &20 R19 0.14 0.14 0+10 013 0,03 6+04 014 11+ .+03 U+ 010 do 0+00 (
I
I i . "
0.17 ab 0.50 A 01 DAB 0101 615 017 . 3 1.113 115 DAB L�2 1.4 312 019 1+41 L 3 1.4 101 016 � �1114 I 13.�4 87 69 019 ab 015 ell 81 0134 O�3 �9 a� 012 0.56 OI O.N� 050 R� 17 10�9 84 OI 0,15 0. .56 1159 64 ) OI 0 1 0.57 115B 15�4 R� R � R� OI l5 6 6 a� 60 60 0.57 O� � 6 OI 12 0,14 .�l 63 0.55 O�8 OI 01C 10�5 0. 2 0,51 010 ell 0.10 0.17 014 0.17 RIO R�5 69 013 I 11�5 013 012 R 2 012 012 Rt2. d.2 Ok all 011 ell 011 011 011) OI 0.1 010 (
1+ + + + + + I + + 4 + _" + '+ + + + + 4 + + I+ + + + + + I+ + I + + I + 4 + + + 4 4 + I + 4 + � + I + + + +1 + + + + + + + + + + 4 + + + +
- - __ I + + I I I + + I I
RIB 024 0.32 0.38 0.41 0,141 OSI OSIS . ,7 I+ L/3 e . , 46 9 16 M �71 L39 1 ��+99 03+6 0+81 0378 R+71 O.+71 0165 0+59 R+57 0.47 OA5 0.49 0,49 DAG 0.46 0.46 R41 0.45 0.44 0.43 &44 0.37 037 043 0, 0.45 0.40 OA5 0.43 OA3 0,44 0.36 03 0.42 0.44 OA O'.44 0.45 0,40 0.44 0.43 OA3 0.44 0.37 67 01.+43 0142 039 11+38 0.37 036 0.39 0. i7 035 0.28 5 019 818 0.23 0.30 0.38 0.31 01" A ROB 0.09 2 2 0+ OI 0+2 O+ 2 O+ I
+ + + + + + I + + + + + + + + I + + + + + + + + + + + + + + + + + +
010 0.19 027 0.36 026 0391 0.46 0 , 62 16 2 L28 1.69 2 ��� 0 1 8 !4 1181 196 1+71 1 i3 1.534 R+71 03+7 0+20 6+71 11+75 O.+70 0169 0 13 R62 R73 Ol 1 R69 R45 151 OA3 150 a54 R48 R52 DAB 051 R+66 0375 R+64 R+41 11+48 0151 CAB 05+3 R+48 0,151 CAB 11151 OI 037 4 0164 0.141 11+48 0+51 0148 CA3 R+47 01 OA+7 0+50 R+65 0375 0165 10,142 0149 R+47 OI R+44 OAO a+42 02+5 R+32 67 1+43 O,+41 R+31 02+6 R+26 0129 OA+3 CAB 0.3 .22 0.15 ROB all 0.1 1 CA III 0,04 153 3 ED . I OR 0 aOO 0.00 ROD 010 0.00 (
0,13 0.12 3 O� 64 O�5 R� I 0,51 OA5 1, 0 150 119 a�6 OI a I ; 0. . L L19 1 5 Lb .85 1143 OI 036 R� RGO OA5 O�l 0140 019 R� Ito Ill Ok DAB DA2 R� E� DAD R� 0.54 DAB OA5 62 1 011 015 OAD Ob OI O�9 R� 1 63 CAB Oli5 OI IAG at 1 OI 01) Ob (lb 68 R!ll 0.52 GAG OA3 a� 1�3 010 OI O�2 O.� 0,56 018 051 Rk 0141 O�3 CA5 CA9 OAG 0.59 62 O.55 OI 013 OA5 43 6 R� 0 aig I.I 0.16 0. 017 1 Ilk O& 5 - 014 014 OI k 012 Ot 0. I +1 011 DID the OI Ol (
+ + I + + + + 1 + + + + + + + + 1.+ + �- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
014 0.12 17 1109 0.24 034 030i 0.24 0,52 , 1 LI 130 1.24 L29 0.76 0 0. , 3 20 1,59 L88 210 1.69 L44 0.85 0.47 0.75 1.32 0.62 0.40 036 L26 L52 157 L38 L22 R69 OAO 0,61 L19 054 10,313 026 1.23 L47 1.52 1.35 120 168 0.39 0,61 119 0.54 0.38 026 L23 L47 1.52 1.34 119 R67 0.39 RGO L18 053 0.37 025 121 L44 1.4B 1.29 114 R66 0.40 0,53 144 0.43 R30 0.66 0.91 0.84 OA3 0.66 0.49 O�4 10.52 III 0 18 0167 +2 0. 036 0.28 023 019 0.13 0.10 107 , ON � 6 A U4 R03 12 .01 .01 0. I too 00 0.00 .0
+ + I + + ' + I + + + + j+ + ' - + + + + + + + + + + + + + + + + + + + + + + + + + + + + + i + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
010 0.14 8 0.27 R30 05 0 a40 012 6 L2 1.24 1.32 121) 1,74 2 �C 0.59 1.65 0.79 2 b 31 114b eJU 210 ZI1 L76 �02 224 0.96 1,98 1.09 213 1,82 L46 L97 1.68 1.84 L58 1.89 213 0.85 I.B6 1.00 ZDB LBI L45 107 1.67 L82 L56 128 213 0.84 1.85 0.99 ZOB LBI 1,45 LB6 10 121 L56 1,88 212 0.83' 125 0,99 ZO7 1.79 1.43 L83 10 1,76 L47 1.77 1.99 R70 1.67 0.76 L91 1,55 116 1+14 O.�9 R+93 R+63 87 010 0376 ReB RS8 0. 057 43 0.26, a 0 5 1 0 0 0 0
1 1 - �� , T�9 ..11 B 0.1 ell .1 X . 6 0.05 ON R02 0.02 021 RDI 0.01 0. 0,00 ROO 0.00 0.00 RO ON (
' - ' + � I Z�4 2 + 5 Ill 6 2�5 L 8 1.18 � � 1, � �� 11 B I a 0 116 (1�7 1.16 1 OI 7 0. Rh _+I 0 114 0. 0.12 61 019 , 7 0 4 0 3 ab 012 0 1 0 a I a I abo DID DID DID ol� the (
a� 0.16 3 t5O OI 159 0 11211 OA2 016 6 18 1148 Lk IA9 1.�O 2. 19 Ok IN 252 ?_ 10 1.18 lb 64 87 210 L� 5 Z�4 i 18 L56 1.10. 216 2A3 21 � 1 ?_ !4 E59 1 1 0 E 6 221 bu e 6 Z� -0 214 2 15 210 L�9 IA9 ZtIS Z! 6 P-1 9 1, �5 Zb 1�8 210 L�9 Z15 21 0 L', 9 IA9 h 2.54 117 1. I .
1 �* 1 �,
+ 4 + � + + 1 + + + + + + + 4 4 + . + 4- + + �. 4 + + + + + + + . + + + + + 4 + + + + + 4 + � + + + + + + 4 4 i + + + + + + + + + + + + � 4. + 4 + + __T
0.17 0.22 7 0.36 R40 0.49 II LkbIJ U.Jb t_-ttl 116 144 Z03 ?_OI 2 5 3.28 0.79 3.86 Z?6 '.22 2P3 ?_28 2. � 2.65 E!7 2.34 ; 2 3.61 146 4,04 Z38 22 � 2.45 Z 38 227 55 2.19 2.28 2A7 -ak- + 9-6 2 2X�7 3.56 LOI 3.99 231 2.21 241 Z36 126 2.54 219 2 3 6 1.01 398 Z29 119 238 2.31 !.20 2.4 7 P-12 228 331 0.6 3�3 L 4 1 2 IA15 1+7 1+27 0.58 00 1.30 1.47 113 0.94 0 05 0.55 0 0+1 ell 0+6 5 0 4 0 3 OI 6+02 0+01 all. 8101 OR 01.01 RIO 0 DID ROO ag( 010 (
. I I - + ,
+ + + + + + I + + + + + + + + + + + F L -1 t + f + + + + + + + + + + + + � + + + + + + + + + + + + + + + + + + + + + + + + + + +
+ + + +
� - I + + I + + + I - + + I + + + - � 43 ! ."
0.17 0.23 131 0.38 0.46 0.53 1621 0.76 0.83 3-19 1.52 0,96 L95 ZIB 2 11 3.03 2.12 323 231 1,65 tO8 LU5 2 1 L+83 2.31 E75 i �59 3.52 2.51 3.57 Z78 Z7 213 L )6 Z74 79 Z56 Z70 2.55 3.47 147 3 4 2.75 ) . L94 2 6 a+47 ZA j 3 2,69 209 L93 172 L Z56 ZG 254 a 2,47 353 2.74 67 2.06 1,90 . 6 . P-51 231 3.16 ZO 3.04 2 11 �30 SB L58 U6 1.07 115 L14 1.6 BIG L71 L33 0.91 1.2 0.62 +76 0 +44 0. �3 4�O 2+ 4 0,15 11 0.08 0.06 . 5 0 4 0. 3 R03 0.02 R02 R02 0,01 021 0.01 ROO 03 0.00 101 0.00 (
I ' - + -
I+ ' � 231
016 OI . "!5 6 R+42 OA5 Chi O.IiD a;4 , , 61 1, IA7 119 L�5 �40 Z;3 ?_t7 212 215 Z F' Il G 4491 313 2,4 Zk q6 110 q.�9 316 13.�5 3191 3lO �11 2�1 337 Z�4 k �43 314 Z42 1 312 P� 3A7 ?4 I 315 - .,13 2+91 3.� 3,� 317 Z� 8 3.19 21'49 315 F�I Z�3 1 2.+41 3,11 2.+91 31q2 31I 3[16 Zk k18 2A+6 I 312 07 21 Z� 9 61 1 2,� Z� 6 1 Z 3 2tl �7 ZbO ZG7 116 L�8 115 IN � 2�2 IA7 & Ill, .1 60 OA9 0.56 013 0�13 �9 69 017 .1 G 0. 5 046 d5 OI 013 at2 011 011 011 RIO able 010 Ill 010 (
i I - �j , + + . + + . + I - .�S + + + . 1, + + + + + 4 + + + + + + + + + +
+ + . + 4 + + + _[ 6 2. W 3.3 3 a95 4N .91 3. 3D 3.09 3.2 ... 2 312 3.3 327 a kO2 90 3 ... 2.9 3,03 3.06 ,111 0 2. 9 3.3 5 58 11 4 3.1.' 3. 9 Z�9 13 325 3.90 . 0 387 3, 0 2. 3,02 3.)5 )9 2. 9 3.) 3.85 3. 0 .01 323 179 2.35 11 11 0 0
, I I +
0.08 0.10 118 026 0.34 0.44 R61 ,I R+77 D.90 �� IAI F21 3 LI P+ 212 2 '31 2+61 1�+JAJ.+� A . . I . � j . . . .. . I . I . . .
+ + . + + + + I + � IN � I I I ..... 0 A ! i . . � . . ��� A A A .. A ' i A ' . I . i
0 6 ROB �2 016 0.16 023 0 0 1 5 1.94 2 L96 0 ZJ3 Z 2 Z�O A42 a�2 P,G K Z 0 238 3.8 323 2.95 a53 Z59 2 4 2.05 ZD0 05 01 Z�G . . U7 2.78 L92 W 229 Z49 Z313 . I 6 211 E�4 OB 2.4 . I - . . . . .. . I I I I . I I I I . .
I I - - ( C CCq
016 Rb 18 O� Oh O�3 ObI 0141) 015 d1f 0.19 0.57 DAG 1.4 1. i9 L�9 th 212 2 4 6 0 j% I. � Ok Z�4 216 64 L�7 2 T-Z� 3 Z�2 R�2 L�6 1A7 L& 90 Z�B 2�3 218 1 �4 61 L64 Lh 00 ZtB � � � 1 10.2 214 L�5 L�l 2l9 2+10 ZII 0 89 114 117 0.47 OI 2 i2 2+17 215 IA9 2�2 2.19 ZI 7 017 L�2 L� ,T-4 --Ii, E.4-2; 3 2+21 L;5 215 214 E14 OA4 Elm 314 2�7 ?_�4 2.12 IAG .� ?-I 6 �11 L�5 1�-, L55 11� I 0 0 ab 014 O�l 010 0.18 015 3 010 0 7 015 013 '012 10+01 011 ell 01 011 Olo 010 all DID (
+ + . . . . 1 + + . . . . . . + + + I + . . . . . . + + + . . . . . . 4, + + + 4 + + + + + + . . . . . . . . . . . 4 . . . . . . .
0.04 R05 17 0.09 0.12 0.15 019i 0.13 0.30 I 143 110 L65 136 2)8 Z33 2.64 230 Z)B 2-21 11+83 L .26 L93 2.18 222 Z59 E86 2. 4--Z-2) ?_32 L92 L36 �08 1.36 22 2.29 231 �53 2 69 220 Z01 101 107 1 n, 1.91 2+16 �30 Z+6 0 2+26 2104 2113 1374 1120 L+94 L+24 1+91 Z+I 7 219 72 237 2.13 2122 L83 131 2.1 4-49 I -a 23fi_2 4 P-65 2.92 2 A5 Z31 L64 L36 Z4 2 335 ?_24 2117 L89 15 Z10 L97 L77 L51 L67 L42 ROB 022 0.31 024 021 0.18 R09 ON O. 6 0.05 1104 R03 0.02 102 OR 0.01 OR 0.01 0.01 RDO 0.00 RO' 02 C
I I
+ + + + + + i 0+9 O+ + � , + + + , + . + + + , + I + + + + + + . . + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 4 + + + + + + + + + + + + + I + + I + + I + + + + + + + + + + + + + + + + + + + +
103 R04 G ROB RIO 0.13 0,161 .1 23 1.78 240 L74 1,69 2 5 Z56 2.67 252 952 1.76 eOl Z28 3.6 222 L94 126 239 Z67 3,04 2.31 7 Z07 226 2.49 3.35 234 210 ?,05 Z61 1,39--28 1 L65 Z22 Z53 ZG4 2.50 2.49 1.72 L95 2.22 3,11 2.20 L93 134 2.37 2.65 Z75 Z59 Z58 1.83 228 Z40 K 5 Z4 ) ZF i 1,11 2. 7 3.02 2.84 2.70 2,70 1.97 Z� 2 3.+70 4+51 2+44 Z52 2,23 L93 - �2k 2.01 Z09 Z% Z02 L55 0,02 0,19 0.26 023 0.12 R08 0.07 106 a 5 R04 103 0,02 0.02 0.02 ROO. 0.01 OR 0.01 ROO ON 0.00 0.0 0.00 (
i +0 A
11
013 a1m 6 017 at9 all 014 i ah �17 . 6 L14 115 IA9 Z�9 LI5 310 2.16 315 3 �4 218 �b 68 2 2 Lk L12 3,13 �O 1310 3A6 3 13 4 31 I Z�3 Z58 e46 2�2 1 +14 lk Lb 313 P-13 3+13 312 Z16 119 L�4 Z19 LhG 1�1 3,12 219 319 63 3�2 �11 Zh L�6 Z� Z1 2A15 81 -2.S 2. 0 4.12 P-14 3�2 310 216 61 68 68 Z�5 Z& 2.4 1.49 ' 2 217 1t8 01, R� Ok a16 015 OI O�3 013 d9 019 017 a.6 015 014 d3 OI 012 all 0,11 OR 011 RIO 010 DID 0.1 the (
-
+ + . . . . 1 4 + + 4 + - ' . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . + + + + + + - -47 +_ + + a+76�la . . .
0.03 0.04 5 ON R09 0.09 0.11 t 0.22 022 9 1K 1.33 1.61 61 Z+I 3 112 61 2163 2183 1 .1 E44 0 �106 Z+65 2 ')I 258 L97 2.36 1.30 Z78 Z70 4.12 Z2 3 3.76 3.07 2.71 L72 239 E59 328 52 7 2.11 110 P-69 2.61 231 LID 2.39 2M ?_62 258 256 L97 2.36 1.30 Z71 2.93 121 Z51 222 3.02 3.29 357 33. V9 2. 1 04 L26 2.4B 2.53 2.80 Z99 322 Z93 253 L68 196 Z52 221 L55 R61 0.49 0.64 RIG 0.16 0.26 023 0.13 108 ON ON ar6 ON ON R03 U2 Ok ell 01 I 0+41 0.01 0 0.00 0.0 ON (
+ + + + + + i + + ____r + + + + . + + + 4 I+ + . - + + + + + + + + + I a + + 4 + + + + + + + + + + + + + + + + + + + + + + + + + +\ + +
103 R04 6 1109 0.10 0.09 0.12i 0,22 R31 2 a8i 0,61 0.77 1.02 028 1, �4 102 2.02 L62 O, i6 0.73 04 L46 1 '4 I 2,83 L47 L59 1,41 L81 ZO5 Z15 326 312 A : �- )b 11+3 L+00 Z+O 0 111 R+55 61 L+32 L+44 12+2 L+46 L+36 05+5 1+3 1+12 21.14 L+77 R+75 0+29 L+54 1+81 14 316 a311. i 16 5 3. 1 Z43 Z74 2.97 Z68 Z40 2.02 � 32 2,22 1.94 L82 Z8( 2 11 0.15 0.26 023 0.13 CA R05 ON 0,03 0.02 0,02 On 0.01 0.01 OR OR ROO ON �bo, ,OW(
I It I
11 k y .1 � 14 + l
O.& ah 6 Ole DID ell ate 1 ak 019 d Rh R53 RAI 0141 0 OI 118 ab 0.13 017 0!1�3 63 0 15 O.b AX L+44 Z�B 3+ 119 318 319 81 e43 2+ , � Z17 1,�9 09 11 I Lh 0,13 R�4 O.� 6�4 011 a1B 116 013 Rb 0 . ab Ok Ok 01 0.11 0+41 0.01 RIO DID - , � AD DID " (
+ + + + + + 1 + + +. + + + + . + + + . 4 + + - I - -_ IF + + + + 4 + + + + 4 + + + + + + + + + + + + 4 + + + + + + + 14 +( (
ON R05 6 ON R07 0.08 11121 0,19 R13 .. 027 0.25 0,37 0.45 0 15 0.46 0.45 0.51 0 57 050 a57 I I . JB 1,44 � 1 , L93 1.81 I I 1 9 0.87 0.62 018 0.23 023 0 . 1 0.15 0.13 0,10 ON R05 0,04 102 0.01 ' am ago ON 0.00 0.00 A
+ + + I + + + + + + � + 1+ + + + + + + + + + + + + + + + + + + + + + + + 4 -f + + I I I I I + +
0.04 R04 5 015 O,+06 01+06 0,071 a+04 6+0 2 4 027 028 OI 053 0.36 035 0.36 0 32 0.30 0.22 3,25 3.02 359 3120 1.46 0.92 '109 Z50 L62 0,76 1.41 Ill 0,87 163 RE 0.25 0.09 106 0.17 0,16 0.14 0,12 alo Ills d5 ON 1103 R02 aOI 021 X ROO 0.00 ROO 00 0.00 (
I I .
. )
013 11m ) 4 015 d6 Ok 0141 Rb R& 5 0.1 q R�l R� Ob 017 0_18 10.� 018 Ob 0 ' 6 017 I ak 1 4.�9 4�5 3A3 1.4 1 � Z16 L� OI III 6 011 013 O.0 0.53 018 015 d9 010 018 01 d9 016 d5 14 013 R12 011 011 DID 0 0. 0 RIO the C
+ 4 + + + + + + + 4 + . + I+ + + + + + + 4 + + + + + + + + + + + + + + + + +
(
OL3 0,103 ) 4 025 d5 11+0 6 0151 R'O 4 U'B 7 RV R12 016 0.20 0.22 0113 0.24 025 0.23 0 13 0.19 .17 0.13 .48 28 IM 132 L25 121 LOE 0. 0.86 0,64 0.43 0.33 R21 010 ROB 68 ON aO6 0.05 ON R04 0. 3 Ilk w abi on bi /am ON 0.00 uo on (
I I . y
+ + + + + + I + + ____7 + + + + . + + + , + '+ B + + + + + + + + + + + + + + + + + + + + + + + + + + +
023 0.03 ) 3 024 0.06 0.06 Ob7i ROG 0,09 ( I OK all 0,13 0,16 US 019 R20 R21 021 0 L a15 1113 O+jI 6.60 9 E73 1.78 1.92 L59 127 In 022 0.9i 0.4 R59 039 0.29 0.29 020 0,13 0.10 U7 ROG R05 0.04 013 1 0. 0+41 am 0.01 OR I aOO 030 ROO 0,00 ROO (
I .
012 Rh 13 a& d5 016 0171 ab 018 F-6 &12 O� 0,13 114 0 0.17 0,17 O� 0 �2 0.12 I 0.10 719 ' IS 3.�2 914 Lt2 Lt9 L�4 ak OI 0 R� + CIS R� 0.19 0.14 OI 0.10 010 018 OI Rb 0 012 all 1 01I I olo RIO Ile OI RIO abo (
I ARE))S14 VHH,H,Al0u1E .
+ + � + + + + I + + - _+ + + + + . + + + 4 I+ + + + + + + + + + + + + + + + + + + + + + + + 41
102 R03 )33 1103 R04 R05 11051 0.1116 0.07 0 U. , 0.10 010 all Ill 0 2 0.13 1114 109 9 9 U9 09 R09 713 492 3.06 Z05 1.51 1,02 L03 027 0.68 7 0.42 0.22 R13 017 0.14 . .10 0.0 0.03 R03 d2 6+02 all 01 0,01 ON Olo too 0+00 0.00 ROO w (
......... .......... + + + . . ss U14HP-T APARP-TMIEN"I"Ir . . . . . . . + + + + + + + + + I " I . . . . . . 1_1�/;
102 0,02 )33 1103 R03 0,04 R041 0.05 0.06 7 00 0,08 OR 0,09 0,09 0 10 0.10 R07 107 0 7 ON &07 R06 . 0.45 0.32 0.23 R13 015 0.12 .09 ON R09 0.08 ON R06 0.05 R04 RE .01 I I
1 7.16 1.92 3.12 ZUG 12 0,85 024 0,75 i� �112 101 I OR 0.00 ROD ON 0.00 ":Pr oxl,�
' + 1
115 4�3 . � + + "" 4 (
2 0
OR
012 d2 ) 2 tb 0I 013 O&I 0I Oh5 5 Olf OI 016 ab Ob 0 JB OI 6 5 015 0 5 Ok 11 Rt5 310 ZI 2 1.� ato a R 1 1�2 R� OI RIB 016 .. 3 CIS 016 R16 ak OlS d5 OI 014 Rk . I 0 . all all DID RIO 0 - ti ol,G/
- - I
I + + + + + . + + + + + + + + + + + _;
102 d2 ) 2 012 R+02 R+03 d3j' a+03 R+04 4 10.1 U5 1105 R05 046 0 14 R04 024 ON 0 4 014 11 14 R+ 60 2
04 � I 33 ILS 0.86 .44 0.50 6 0.43 0.36 028 0.16 014 0.13 0107 016 d5 6+04 014 R+04 U+:4"O!�q+ R43 6+02 012 0101 01 I OR ROD RCOI ;x 01I 0,100 (
+ + + + + + + + - + + + + + - + + I 4B + + + + + + + + + + + + + 'Ir Z+ + +
+ + + I I I I I + I + + I
I OM
041 R02 ) 2 R02 R02 0,02 0.031 R03 0.03 4 101 R04 1104 0.04 1103 0 )3 R03 0.03 013 0 3 01+03 d I ,03 R03 . S62 Z05 135 OL5 0,42 0.40 0.39 OI 0,10 D+ 10.117 ROG 0.09 0.10 0.10 045 104 0,03 a03 R03 0 OM R+02 R+02 2 0.01 aw am Aar,�,Ao ok, ROD ROO ON (
011 011 I Ul 012 d2 012 0121 Ok OI _3__t� d3 013 d2 CI 0 3 Rh at 3 013 9 3 OI I'l2 Rt2 312 213 L63 116 010 CI 6 051 O.� 014 0.19 0.16 OI 013 &b Ob 016 1b 013 012 2 012 O� d2 . 2 012 Olt all,droi,47ro "aho Clo olo Olo (
+ + � + + 4 + I + + + + + + + - . + + + + + + 4 + + + + + + + +
CAI 0,01 101 OR 0.01 0.02 O.0d 102 0.02 t -WE 0.03 1102 R02 0,02 a )2 d2 012 012 912 RI J'12 d2 .121 1.88 L36 0.93 0.47 0.28 023 0.23 OI 0+18 0+14 0.14 Rb On a+02 6+05 0.05 104 U 2 R02 ROI OR 2 0.02 OR a 04--Ifol all OR Clo do 0 too (
I . ::: + , I + �
+ + f + + + + I + + + + + + + + + + i + '+ + + + + + + + + + + + + + + + + + + + + !1� I I ,.,,
OR 02 101 OR 0.01 0.01 0.0a, 0.02 0.02 , I 11 all Ill 112 1,12 0 12 112 112 012 012 112 d 1 12 101 0194 R�3 R+79 1162 0.35 a2O 0.16 0,18 0.117 1+15 . 0+11 RUB 012 R+02 R+03 Od 4 L03 102 0.01 0.0 41 OR 0,01 W��J. a OR 0.01 0.01 On too ON ON (
+ + . . I ,::::� + +1_1 +
021 at I OR 0+01 all 11.10111 011, OI 3 2 1k 01 011 01 0,11 0 1 ell all all a )I 0.11 Ill I Olo OI RIO Olo 010 ole oto a; III a a 0. a O. a DID 610 aio able Olo a a ROO a. D RIO Ot 010 0.10 010 010 all DID 61 OA3 OA3 0,15 055 R& 0,14 ell 0.14 0.13 ell 018 Ob 013 d2 OI A 013 Ok 012 0,11 011 01 4��aol 4t('011 0+01 ell all ol abo DID abo (
I+ ,�" x
+ + � + + + + + + + + + + + + + + + + + + + 4 + + + + + + + + 4 + + 4 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 4 + + + + + + + + + + + 4, + + + + + + + ,<� + + + + 4 + ,F� +
+ + + + I 01�1 ,
. 0
OR am . 01 0.01 0.01 O.Ol om on 0.01 11 0.01 0,01 0.01 0,01 0,01 0101 Doi Doi on 01 on Ilm 0.01 01 0.00 0.00 ROO 0.00 0,00 0.00 ON 0.00 ROO ON 0,00 0.00 ON 0.00 0.00 0.00 0.00 0.00 0.00 ROD ROD 0.00 0.00 0.00 0,00 0.00 too 0.00 0.00 DA) ROO 0.00 ROO ON 0.00 too ON 0,00 ROD too 0.00 100 ON 0.00 ROO ROO 0.00 0.00 ON 0.00 ROO 0.00 0.00 0.00 OR 0.00 100 0.00 0.24 028 028 0.22 0.20 0.15 0.10 0.08 010 R09 0.09 ON ROG 0,06 0 . 0.02 . 0.01 toL.4"I 0.0 .01 0.01 OR 021 0.01 0.00 0.00 too CA (
11 �
+ + f + + + + 1 + + t + + + + 1.� '+ '+ + + I + + + + + + + + + + + + + + + + + + + + + + + + +
, )I PI OR 0,01 to __ -ROO.- _OA - Ago_ _UO.- _Ux - AOOI 4,09- -95. - 4W- 40 11- -5X - 40I -10 O_ -M - ADI -UO- -OX - AM- -UU- -4X - ga-40 4,01 04 - " m ox ROO 0.00 0.00 0.00 0.01 0.01 ROO ox 0.00 0.00 0,00 (
101 0.01 s 01 0.01 0.01 0.01 URI 0.01 0.01 0101 OR 0101 0.01 0 1 q 0101 ra - 411- I-4,00-400. OL -45. _UO.__Ox_49o__U9�_OA -.190-ROOL-Ils-.10A.- _R04 --ox - 404--0,00---m- ON__UO___Os_-QOD___RO4__Ox --OAl-4OO_--9X -AOC_--RQU--M -.1100_- -UO_--OX- 1100--UOL-4,00 -915_049L-02-0- 4�3-42- M-.QC7--U6--UX-AP--U7--U6-404--U4--U4-992--U�--M-4M- Ul--04 "
.
tol ell . �l all 01 ell all! 0+01 all �4 ell OR all ell 0+01 at all ell 0+01 ell all ell ell all OI RIO Ole do ato 010 OI RIO abo olo DID DID ell RIO the Olo RIO Ole DID 016 Olc DID DID the olo RIO DID ell RIO olo 010 too Ole ell RIO all 010 RIO DID 010 DID Ole Clo RIO ato ell all DID 010 60 Olo Olo olo the 010 DID all DID &12 0.16 69 Ob 016 at5 Ok 016 d5 d5 a1m Rh d3 013 at2 ab I OR 011 011 011 tbl 011 ,OhC 010 RIO OlD OlD 0.10 01 OI DID the 010 all tho (
+ + + + + + + I + + I + + + + + t + + + + + + + + + + + + + 4 + + + + + + + + + + + 4 + + + + + + + + + + + + + + + + + + + + + + + + + 4 + + + + + + 4 + + + + + + + + + + + 4 + + 4 + + + + + + + + + + + + +
0,00 0.00 " 01 021 0.01 Rol OR! too 0.01 )I tol 0.01 on on On abi abi aoi on abi om on Roi On ROO ROD ROD ROO ROD too too ROO ROO ROO 0,00 ROD 0.00 0.00 ROD 0.00 0.00 ROO 0.00 0.00 0.00 ROO ROO ago ROO o.OD ago too ROO ROO ROO ROO age too ROO ROD ROO ROD ROD ROO too too ON ROD ROO ROO ON too ON ROD ago DOD ROO ON 0.00 ON ROO 0.01 ROB OA 1109 R07 R05 0.04 104 0.03 ON R04 0.04 a03 R02 0.02 102 R02 0,01 OR ROI On On OR On 041 ROD ROO ROO ROD ago ROO ROD aoo ON ROD ROD too (
I
+ + f + + + + I + + + + + + + + + + + + + + + + + + + +
0100 0.00 '00 ON 0.01 0.01 ROO! coo 000 0.00 ago ON ROD aoo ago ROO too 010 0,00 0.00 0.00 0.00 ROO 0.00 0,00 ROO 0.00 0.00 too A rA Ono age 0.00 9109 age 0,00 OR 0.00 e.00 0.00 0.00 0.00 5181) BI BIDS BI He He aloe too 0.00 10,00 RO 02 0100 RO RO RD RO 0 0100 RO RO 0 RO 0100 Ol 0 RO RO OXO to RO U D RO to Ol 0 RO RD RO Oe RO Ol 0 ell R05 R5 0 15 1104 R03 013 a0 R02 012 R02 tl all l. 0 01 R 1 041 0101 all tl 0101 RO 0100 ROD too RO Ro ao 0 Ox Clo Ol 0 02 (
' ' "' - -
. �
An An I.An n& An An n &i rilln An . An An n1in ntn n1n Am An InIn Am ntn n1n An An An An nL An n1m An An I An An An n+m n1in An An ntn An n Im An An An An An n& An An ntn An An An An n1n n+m ntm An nfin ntn An An An An n& ntn n1n n1m An n1n An ntn An An An An An An n1n ntm n1in n1n An n1ii n A Ai n1ii A:) A:) nlm n�:) A:) n�t) AD n li�) An nt rit n� n1i nt n+ni Int nti nt An Ai An An An n1n n1n n+m An An Am All Aft n1m r
. EXTERIOR LIGHT FIXTURE SCHEDULE
-
. . � FIXTUREJ DESCRIPTION . LAMP
TYPE - -
(`_i� 51TE PLAN - FHOTOMETRIC5 . AAA DECORATIVE .20'. POLE,. 12OV, .PULSE. START, TYPE Ill DISTRIBUTION, (1 )l 75W
. . . . . . . . . . .
I . . HAND'HO�E, CAST ADAPTER FOR ' SIDE MOU * NT " MAST ARM, H * OUSE HPS .
�O 5CAL : I . . SIDE SHIELD,' FINISH BY ARCH'. ' ' ' * . .
-
01 I I VISMAIRJE UGHU MON '1-T3-'175"-S-'1-*AM-"XX*-HS'S * ' '
� 20 1 . . ARM, VA101-81 ' ' ' ' ' ' ' . . . . . . . . . .
,
I
. . . . . . . . . . . . . . . . . . . .
. I . . (OR APPRO0 tQbAL) . . , . . . . . . . . . . .
.
. . . . . . . . . . . . . . . . . . . . . . .
. . � POST -VERIFY EXACT . BBB DECORATIVE OUTDOOR CAST ALUMINUM FIXTURE, QUAD -TAP. . (1)70W
. .
I TYPE & FIXTURE ON 120,1Z . OB/ . I . L . . . . . . . I . . HPS '
. . . .249/2.77VO T B4LL4ST,. ARCHITECT SHA�L SELECT. . . .
FIXTURE SCHEDULE. . . . . .
� . . . COLOR FROM. FACTORY. STANDARD COLOIRS,. (2) 12VOLT . . . (2)20W
I . � 30' . . . EMERGENCY LAMPS. . . . MR16 .
. . . . HUBBELL *LMC'_1OHPS-8-9-21EM1.2 - - - ' - - . .
. - -
I (EMEROI-LIX HlIGH' UtES: SURE" LIX LITHINIA) ' ' ' ' '
. . . . . . . . . . . . . . . . . . . . . . .
I
.
.
1-111L - -14, . CbC 13"'REIICES�SEIJ HID bOAUMT.' RWNb REGkIES�ED'FRESNtL LENS, (1)70W
.i�......,. .......6 . .
I . . . - .W., 1-��.... . CLEAR SPECOLAIR ALZk NISH, *120 VOLT," ALUMINUM TRIM 'RING, HOS '
1 ..�...6... . .6....�.d PVC W/2#10 * ' I . . .
.&. . . .,., I .%,.,.,.,.". I . UIL LISTED DAMP LOCATIONS, HEIGHr 6.125* ' ' ' ' ' '
...... . . . . . . . .
I I . . . . . . . . . . : � .,.* , . * . . 3o [ & GROUND . . PR . ESCOLITE RHD802-7 . OHPSFE-STH8 . 02 . . . . . . . . . .
..... :::::q
GRADE--*,,, .0 .... ... a....D. . . . .
.,.*."&,., . . . -...XL I (LITHONIK, HAM INDY,_ VANTAGE,' PROGRE5S) . . . . . .
. - .... . . ... .6% . - . . . . . . . . . . . . . . . . . . . . . . .
� - Js ..... ...
- .F.".. '_'�"_ - - = .
. -1 �1 I . ....... ... . 1.::� - I I I - - DbD DEtORATIVE'WALL Onk, i2OV, PULSE tTAkT,"TY0E IV . . . (1)70W
- .O.. ....... . .
. . . . .0. I 1=1 I
I - I ,."., ." *%!, E�,M=,1'11 IF1.1 I I DISTRIIIBUTIOK, HANO HOLE' cAST*ADAPTERFOR SIDE *MOONf MAST HPS '
....... ...... - - . . I . .
1=_1 I 1=_1 -I 'A .. ......
_ .
� _. '_ .. - - - I - FINISK BY ARCH . . . . . . .
- ...........:.W.. .6 �_ . . ' ' . .
. =1 I I I 1=1 I , I . . ARM, HOUSE'SIIJE SHIELD,
.....I,& = : - - - -
1.:,9.1.1.1.%. - _E1 I Mi I - . . VISIONAIRE LIGHflNG MON 'I - T4-70 ' S-1 -AM 'XX ' H5S ' . .
� . 1=1 I 1=1 I I 1 6-..---,&.-�-:.:!�-:!:-7� I . .
'0. I I I . . ....... I I I I I 1;�
. I 61- - :��d I 1=1 I I- ..[Z- - -4-6, (OR APPROVED LQUAL) . . . . . . . . . . . . - -
. . . . . . . . . . . . . . . . . . . . . . . . .
-A.---..,D.-. �-��
� - ...Lf..-:-:. - - 3000 PSI
..
I I 1-1111 - �1*:::-.:�:�:*A� 11'
_ j
- i . . . . . . . . . . . . . . . . . . . . . . .
� I f - -"� - ::- 4, - 0 -
,
.
. 11 - I - CONCRETE . . . . . . . . . . . . . . . . . . . . . . .
. __ -] I I -
,
I I I , I I
. -I I . . . . . . . . . . . . . . . . . . . . . . .
I . . . . . . . . . . . . . . . . . . . . . . . .
I
.
I �- 30*--� . . . . . . . . I . . . . . . . . . . � . . . .
. . . . . . . . . . . . . . . . . . . . . . .
.
. . . . . . . . . . . . . . . . . . . . . . .
I
I
. . . . . . . . . . . . . . . . . . . . . . .
�
. I LIGHT POLE DETAIL . . . . I . . . . . . . . . . . . . . . . . .
;;;; '+ a ' "' I NO . SCALE . FIXTURE TYPE *AAA" � I . . . . . . . . . . . . . . . . . . . . .
.. ... a SI O'6 a
"I ' " 2 2 +
+
a
.
' '
'� , L +
OL L17 6
+
I+ " +
66 1.71 L6
5 5 L� L �
I 0, 7
+ +
0.63 . " L
'4 �4 �26 a '4 2 + I
?
+
.
' 2 8 5 N72 05 "' '
+ + + + I I
-
.0 20 1 2 0.3 0.3 020 2
� + 3 �46 L , R+ I + + .21
3 O_
3 023
08 -0 IL, 1 2 U35
L 5 � l
,
1. 3 3 1.4 � I 0 .t 6 11 .5 6 05 9 R� .1 ,
+ 4 , '�
43 0, . , 0.4 .00 (
1 + + + + + +
-
�� a' a I DA, 0.00 (
�F� R�� -� , + ,
" to
3 11 a1m -I
�
k�� ' R�' to D
'I 0.12 '
I I I em, C
014 0.12 . 3 ' R05 ' 'a' to' OR a
+ + + + ' + I I +
010 0.1 )
4 6 1 R05 U,4 101 U22 all 0 n em 0.
0. 0.16 1, "
-
f ` ,
0 FIIA+�,'
I
I
" , rx/. I
' I
1.5I 4 2
,
. 0, �
,
. ,+ N Ij
� � +' �"+'[_
� Y_
11
I
� I 11
I
.
.
I
.
. _,��,
,� "'11 I
h*kj
-
-
Sa
r
LA
'I F
'A
#
. �**+sci
nd Companies, Inc.
Constructlon # Property MLsmkgement *Development
366 South Tenth Avenue
PO Box 72 7
Waite Park, MN56387-0727
Office: (320) 202-3100
Fax. (320) 202-3139
Website: www.SandCompaniemcoin
E -Mail. SCICaSandCompanies.com
JTLIN�D�ELL ENGINEERING INC
MECHANICAL - ELECTRICAL CONSULTANTS
1 3411 KILMER LANE NORTH
PLYMOUTH, MN. 55441
(763)542-9163
lnfo@Undeleng.com
.
.
.
I
-
,
I -
. �
\
I-
\ 1%
,
I
\/ ,(�) 16, �
1� - 1:�,
�_
11
A-IRDEN
VILLAGE
ARDEN HILLS, MN
PHOTOMETRIC PLAN
P_M__ I 0 0
10-28-09
.
Ita.-
,,--ARQEN HILLS
MEMORANDUM
DATE: December 9, 2009 PC Agenda Item 5,*A
TO: Planning Commission
FROM: Meagan Beekman, City Planner
SUBJECT: Report from the City Council
November 9, 2009, City Council Meeting
The City Council established a three hour time limit for all City Meetings. If a Planning
Commission meeting should run beyond three hours a motion to extend the meeting and a
majority affirmative vote from the Planning Commission would be required.
November 30, 2009, City Council Meeting
The City Council approved a motion to table planning case 09-020 for additional information.
This application was from Clear Wireless for a CUP to install antennas on the existing Country
Insurance building located at 2 Pine Tree Drive. This item will likely go back to the City
Council at their December 14, 2009, meeting. The Planning Commission unanimously
recommended approval of this planning case at the November 4, 2009, meeting.
TCAAP Update
On Wednesday, November 19, 2009, the GSA held a bidder's conference at Fort Snelling. The
purpose of the meeting was to share information about the property with any and all parties
interested in purchasing the entire 585 acre site for redevelopment. The meeting included a
summary of the history of the property, and explanation of the known contaminants remaining
on the site, and a discussion about the transfer process and how the GSA would ensure that all
required clean up occurs. There were approximately 50 people in attendance. It is unknown
how many were potential bidder's. Most of the City Council was in attendance.
City of Arden Hills
Planning Commission Meeting for November 4, 2009
\\Metro-inet.us\ardenhills\Planning\Planning Commission\CC Reports\120909 - PC report - CC report.doc
Page 1 of 2
Prior to the meeting the City Council approved a TCAAP Reuse Statement that included the
information that the City Council thought was important to express to a future bidder. The
Reuse Statement is attached to this update.
The City is moving forward with beginning the process of adopting zoning standards for the
property. Staff has begun working out how this process will unfold. More information will be
provided as it is available. The Planning Commission will be part of the zoning process and will
review and make a recommendation on any changes that are proposed to the Zoning Code.
The City is also working with Ramsey County to determine how much of the 585 acres will be
transferred to the County from the purposes of park and open space, including the Wildlife
Corridor and Primer -Tracer areas. The City is also working on a north -south trail concept that
will connect Highway 96 to the wildlife corridor.
City Administrator Ron Moorse will be leaving the City on January 10, 2010. The City Council
will appoint an acting City Administrator until an interim City Administrator can be found. The
City Council has begun the process of recruiting a new City Administrator.
City of Arden Mills
Planning Commission Meeting for November 4, 2009
\\Metro-inet.us\ardenhills\Planning\Planning Commission\CC Reports\120909 - PC report - CC report.doc
Page 2 of 2
----A,RQEN HILLS
TCAAP Reuse Statement for the
Bidders' Conference — November 18, 2009
TCAAP Reuse Statement:
The City of Arden Hills has been looking forward for many years to the opportunity to convert
the TCAAP property to a reuse that benefits the community and the region. The TCAAP site
provides a unique opportunity to start with a blank slate and create a singularly exceptional new
future for the site. The TCAAP Reuse Statement sets out the City's baseline expectations for the
reuse of the property. It is the City's strong desire to work with a buyer who will use the City's
expectations as a starting point, and will bring the creativity and commitment necessary to
accomplish a truly exceptional development.
The recently adopted 2030 Comprehensive Plan is set to guide the community over the next
twenty years. The primary purpose of the Comprehensive Plan is to support and implement the
City's vision:
Arden Hills is a strong community that values its unique environmental setting, strong
residential neighborhoods, vital business community, well-maintained infrastructure,
fiscal soundness, and our long-standing tradition as a desirable City in which to
live, work, and play.
Arden Hills is a strong community with established neighborhoods, an extensive park and open
space system, and stable business community. Except for the former Twin Cities Army
Ammunition Plant (TCAAP) property, the City is almost fully developed. The TCAAP property
occupies a significant portion of Arden Hills and its potential reuse offers both benefits and
challenges. Reuse of the TCAAP property must be able to benefit the community and region
without placing financial burden on existing residents.
The General Service Administration (GSA), on behalf of the Army, is selling the land in an
industrial condition. The condition of the property varies, and there are portions that meet,
exceed, or are below the industrial condition. The City will expect the property to be remediated
to allow for the land uses described in the Comprehensive Plan. The remediation must be in
conformance with the Minnesota Pollution Control Agency (MPGA) requirements for the
approved land uses.
City of Arden Hills — TCAAP Reuse Statement
November 18, 2009
Page 1 of 4
The 2030 Comprehensive Plan provides guidance for the future of the TCAAP property and
includes the following goal for the reuse of the TCAAP property:
Develop TCAAP in a way that accommodates a mix of land uses that is
sensitive to the natural environment, economically sustainable,
and a benefit to the community.
The Comprehensive Plan will form the basis of the land use regulations; however, the City
reserves the right to amend the Comprehensive Plan to ensure that the former TCAAP property
becomes a positive contribution to the established part of the community and the region. The
regulations will also need to recognize the inherent limitations of the property. The City is in the
process of preparing land use regulations, densities, design standards, and a list of permitted uses
for the TCAAP property.
The 2030 Comprehensive Plan currently divides the TCAAP property into four land uses, which
are shown on the attached future land use map and defined as:
Mixed Residential (-240 acres) — provides for a variety of housing types and
densities in close proximity, including single-family detached homes, single -attached
homes, condominiums, townhomes, apartments, and senior housing options. The
anticipated average density is 10.4 units per acre with a minimum average density of
six units per acre up to a maximum density of 46 units per acre. This land use is
designated for the proposed TCAAP redevelopment, and the density is subject to
change once a final land use plan is selected.
Mixed Business (-220 acres — areas designated for a variety of businesses, including
commercial, certain light industrial uses, warehousing, office, general business, retail.
This designation will be used for the future business uses on the TCAAP property.
Park and Open Space (-76 acres) — areas designated as public parks.
Park Preserve (149 acres) — areas designated as natural or scenic areas that are to be
preserved for public use or open space.
The "Mixed Residential" and "Mixed Commercial" categories have the potential to allow a
broad variety of land uses. Additionally, the mixed residential and mixed commercial areas must
also have accommodations for parks, open spaces, and pathways integrated with those uses.
While the future land use boundaries and acreage may be adjusted depending on the proposal
and benefit to the community, the future land uses are anticipated to form the basis of the zoning,
design, and use regulations.
City of Arden Hills — TCAAP Reuse Statement
November 18, 2009
Page 2 of 4
Reuse Expectations and Considerations
With any reuse scenario, the City has expectations that must be met. Additionally, it must be
understood that there are other limitations that need to be considered when preparing a reuse
concept. The following list of expectations is not all-inclusive and is not listed in order of
importance:
Expectations
• An environmental plan that remediates all of the land to the required standards to
accommodate the land uses outlined by the City. The plan will meet all Minnesota
Pollution Control Agency and Environmental Protection Agency requirements, including
financial commitments to ensure that all contamination remediation requirements are
met.
• Environmental remediation of the land in a timely manner is a top priority to the City. A
reuse plan will need to include timeline information related to the remediation and
redevelopment. A reuse plan that selectively uses or "cherry picks" parcels while
ignoring other parcels will not be considered.
• A bike and pedestrian trail corridor from the Highway 96 Regional Trail to the Rice
Creek North Regional Trail to allow a connection to the southern portion of Arden Hills.
• Substantial park and open space requirements will be incorporated within the mixed
business and mixed residential uses to provide parks and open space areas and amenities
to serve the community and the development.
• The City will require designated park land, park land dedication, and/or park dedication
fees.
• The City has a tree preservation and landscaping ordinance in the Zoning Code. The City
will expect substantial landscaping and trees, and the requirements may be enhanced for
the TCAAP property.
• All utilities, including electric service, will be installed underground.
• All Rice Creek Watershed District requirements will be met.
• The on-site storm water ponding could be incorporated into the open space amenities.
• The redevelopment will incorporate green building and design principles where feasible,
such as Leadership in Energy and Environmental Design (LEER) standards. This could
include using the Army's water treatment process to develop a geothermal energy
generation capability and/or the use of some land for solar or wind energy generation.
• Buildings must be constructed from high-quality, long-lasting materials.
• All roads and paths must meet City requirements if they are dedicated to the City.
• The redevelopment must be able to pay its own way and demonstrate that its tax base will
support the long-term maintenance of the on-site infrastructure and support City services
including, but not limited to, police, fire, inspections, and maintenance of roads and
parks.
• A reuse scenario must seek to create a walkable environment that is pedestrian and
bicycle friendly.
City of Arden Hills — TCAAP Reuse Statement
November 18, 2009
Page 3 of 4
• The residential and commercial areas must be connected by sidewalks and trails to each
other and other parks and open spaces. Residential sidewalks and commercial
sidewalks/trails will be privately maintained.
• The reuse must consider opportunities for transit connections.
• The design and construction of any bridge over Rice Creek must be coordinated with
Ramsey County and respectful to the adjacent open space.
• The Wildlife Corridor, the Primer/Tracer area, and a north -south trail corridor will be
dedicated for park and open space related uses separate from any park dedication
requirements.
• All costs related to consultants to facilitate the redevelopment will be the responsibility of
the developer.
Additional Considerations
• The City will seek to diversify its commercial tax base and generate high quality jobs (i.e.
high technology, medical). The City is interested in a corporate campus to help diversify
the City's existing commercial tax base.
• The City will seek to establish viable retail groupings to enhance long-term sustainability.
• The City will seek to provide a variety of housing options on the site to accommodate the
current and future needs of Arden Hills. This may include affordable housing and market
rate housing with a focus on owner occupied housing.
• The City will seek to have uses that generate property taxes.
• The City has not guaranteed the use of Tax Increment Financing (TIF) or any other type
of financial incentive for the redevelopment of the property.
• The only access points to the property are at County Road 96 just west of Snelling
Avenue and at the intersection of Interstate 35W and County Road H. The development
capacity of the TCAAP property is limited by the capacity of these two access points.
The City does not have funds to upgrade these intersections.
• All development and permitting fees in the City's fee schedule apply.
• In addition to the Metropolitan Council sewer and water access charges, the City charges
a sewer and water access charge.
• The United States Army operates a network of wells, underground pipes, and a treatment
plant to remediate the groundwater contamination. This groundwater treatment must be
able to continue along side any redevelopment.
• Additional information, such as environmental data, is an asset of, and available from,
RRLD, LLC. To find out what is available and how to obtain the information, it is
necessary to contact RRLD, LLC directly.
Uty or Amen dills — TGAAP Reuse Statement
November 18, 2009
Page 4 of 4