HomeMy WebLinkAbout4B, Ordinance 2009-013 - 2010 Fee SchedulePrepared By: Rebecca Brazys, Deputy Clerk
Council Meeting Date: December 14, 2009
Adoption of Ordinance 2009-013 Setting the 2010 Fee Schedule
Budgeted Amount: IActual Amount: I Funding Source:
NA
Recommendation:
NA
NA
1. Motion to adopt Ordinance 2009-013 and Summary Ordinance 2009-013 Setting the
2010 Fee Schedule,
Supporting Documents:
1. See the attached memo from Rebecca Brazys
2. Summary Ordinance 2009-013
3. Ordinance 2009-013
4. Ordinance 2009-013 — Appendix A — 2010 Fee Schedule
----AVE
HILLS
MEMORANDUM
DATE: December 14, 2009
TO: Honorable Mayor and City Council Members
Ron Moorse, City Administrator
FROM: Rebecca Brazys, Deputy Clerk
SUBJECT: 2010 Fee Schedule
Background
Please see below for information on the fee changes in each category of our 2010 Fee
Schedule:
II. Building Construction
These increases are necessary to cover costs related to permit processing.
V. Parks and Recreation Fees
Parks and Recreation fee increases were minimal. The softball field rentals were
increased by $5.00 for both lighted and unlighted fields to better cover our
maintenance fees. We added a tournament fee for our ball fields in order to
ensure all of our maintenance and labor costs are covered for that type of rental.
Our regular field rentals are not sufficient to cover tournament field prep costs.
Two other non-profit pavilion fees are new in the fee schedule but have been on
our rental form for years. When reviewing the fee schedule, staff discovered the
exclusion of those fees. The City is now required to charge tax on all rental fees
and therefore this is now indicated on the fee schedule.
VI. Planning and Zoning
The fee format for the land use applications is proposed to be changed. Presently,
while each type of request incurs an administrative fee to cover the cost of Staff
time, public notices, meetings, etc., there is not a set escrow amount for each type
of request. Escrow fees are charged to cover the cost of any consulting fees or
unanticipated cost the City may incur in relation to a planning case application.
In order to put the City into a better position for charging escrows and more
City Council Meeting
\\Metro-inet\ardenhills\Admin\Council\Agendas & Packet Information\2009\12-14-09 Regular\Packet
Information\4B 2010 Fee Schedule Memo.doc
Pagel of 3
In order to put the City into a better position for charging escrows and more
accurately tracking costs, the proposed fee schedule includes a minimum escrow
charge so that applicants know what to expect. The escrow can be increased or
deceased at the discretion of the City if needed.
VII. Utility Hook-up Charges
Increases based on the utility rate schedule adopted by the Council last year.
VIII. Miscellaneous / Retail Activities
Increases based on the utility rate schedule adopted by the Council last year.
X. Miscellaneous Fees / Permits
These increases are necessary to cover costs related to permit processing.
XIII. Utility Use Charges
Increases based on the utility rates scheduled adopted by the Council last year.
XIV. Recycling Fees and Bins
The Arden Hills recycling program includes the weekly curbside recycling
program and the twice annual community cleanup event. The curbside recycling
services are provided by Eureka Recycling. The community cleanup events are
operated in conjunction with the City of Shoreview. The recycling budget is an
enterprise fund that receives revenues from the annual household fee that is
applied to the property taxes and from the SCORE grant provided by Ramsey
County. Most of the expenses are from the services provided by Eureka. Since
there are no other dedicated funding sources, the revenue must be balanced with
the expenses.
For 2010, the per household fee charged by Eureka Recycling for curbside
recycling services is not expected to increase. The contract with Eureka states
that the household fee will change each year based on the change in the Consumer
Price Index (CPI) from the Minneapolis Federal Reserve for the Upper Midwest,
which is expected to include a change of between negative one and zero percent.
For 2009, the annual cost charged by Eureka was $36.72 per household. The
processing costs per ton will not increase, but the actual processing cost varies
depending on the tonnage of recyclables in a given month and the market price for
the recyclables.
Although base fee from Eureka is not expected to change, the annual curbside
recycling fee per household is proposed to be increased from $32.00 in 2009 to
$40.65 in 2010. This fee increase is needed in order to balance the recycling fund
budget. There are three reasons for the increase in the annual per household
recycling fee.
City Council Meeting
\\Metro-inet\ardenhills\Admin\Council\Agendas & Packet Information\2009\ 12-14-09 Regular\Packet
Information\4B 2010 Fee Schedule Memo.doc
Page 2 of 3
The first and primary reason for the increase in the recycling fee is because the
2009 recycling fee was set lower than the base cost of the recycling program.
When the 2009 household fee was set, the City anticipated receiving sufficient
revenue share to offset the lower per household fee. As discussed earlier in 2009,
the recycling market decreased significantly with the recession and revenue share
decreased to zero for several months. The recycling fund balance was used to
compensate for the loss in revenue share. In January 2009, the recycling fund
balance was approximately $39,000. At the end of 2009, the fund balance is
anticipated to have decreased to approximately $18,500. The proposed 2010 fee
would cover the full cost of the recycling program.
The second reason is that personnel service charges increased from $10,450 to
$13,403 annually, which is primarily due to an adjustment to apply the actual
personnel cost for operating the recycling program to the recycling program. The
third reason is that the administrative costs associated with recycling also
increased from $1,734 to $2,897. Administrative costs are applied to all
enterprise funds, which applies overhead costs to the recycling program.
In addition to the increase in the annual per household recycling fee, Staff is
proposing a fee of $1.40 for each housing unit that is not part of the curbside
recycling program, which includes Cottage Villas, Hunter's Park Condos,
Parkshore Apartments, and Arden Manor. Although these properties contract
separately for regular recycling services, they still have access to the community
cleanup event. This fee would cover their portion of the community cleanup
event. Currently, only those households that pay a recycling fee are paying
towards the community clean-up events, even though all households in the City
have the opportunity to utilize them. The proposed fee schedule would allocate a
portion of the cost of the community clean-up events to all households equally.
The proposed recycling fee of $40.65 includes the cost of the community clean-up
events.
Recommendation
Motion by the City Council to approve Ordinance 2009-013 and Summary Ordinance
2009-013 setting the 2010 Fee Schedule.
City Council Meeting
\\Metro-inet\ardenhills\Admin\Council\Agendas & Packet Information\2009\12-14-09 Regular\Packet
Information\4B 2010 Fee Schedule Memo.doc
Page 3 of 3
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
SUMMARY OF ORDINANCE NO.2009-013
On the 141h day of December, 2008, the Arden Hills City Council adopted Appendix A of
Ordinance No. 2009-013, and by four affirmative votes pursuant to Minn. Stat. §412.191, Subd.
4, directed that a summary of Appendix A of Ordinance 2009-013 be published.
Appendix A of Ordinance 2009-013 is entitled "2010 Fee Schedule" an Ordinance
Relating to Fees Payable within the City of Arden Hills for 2010. The primary purpose of the
ordinance amendment is to update the Municipal Code to reflect fees for the calendar year of
2010.
A full copy of Appendix A of Ordinance 2009-013 is available for inspection by any
person during regular business hours at the office of the City Administrator, 1245 West Highway
96, Arden Hills, Minnesota 55112. The Ordinance is also available online at
http://www.ci.arden-hills.mn.us.
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
ORDINANCE NO. 2009-013
A Special Ordinance
Relating to Fees Payable within the City of Arden Hills for 2010
The City Council of Arden Hills hereby ordains that Appendix "A" containing the Fee Schedule
for Calendar year 2010 is hereby adopted, and made part of the Municipal Code.
Effective Date:
This ordinance shall become effective the day following its publication.
Adoption Date: Passed by the City Council of the City of Arden Hills on the 14th day of December,
2009.
Stanley D. Harpstead, Mayor
ATTEST:
Ronald J. Moorse, City Administrator
Publication Date: Published on the 23rd day of December, 2009.
With Changes
(Indicated in Parenthesizes)
� EN HILLS
City of Arden Hills
Ordinance 2009-013 — Appendix A
2010 Fee Schedule
(Effective January 1, 2010)
INME
Dogs/Cats —Licenses
Two years (Pro -rated for second
$25.00
year @ $12.50)
Dogs/Cats —Duplicate Tags
Each
$6.00
Dogs/Cats — Boarding$18.00
-- ----
------------- ........
per day
Dogs/Cats —Impoundment Fee
$42.00
Dogs/Cats —Surrender Fee
Each !
$24.00
Dogs/Cats —Residential Kennel
Annual
$20.00
License
Dogs/Cats —Dangerous Dog Fee
Annual
$60.00
Copying —Minutes, City Council
Annual
$66.00
Meetings
-- ---- - - ----
Copying —Minutes, Planning
Annual
$53.00
Commission Meetings
Copying —Agendas, City Council
Annual
�$13.00
Meetings
Copying —Agendas, Planning
Annual
$6.50
Commission Meetings
Copying —Agenda Packets, City
Annual
Cost based on per sheet, staff
Council Meetings
-- ---------------
labor, and postage
Copying-----------
—Agenda Packets..
Annual
Cost based on per sheet, staff
Planning Commission
.................,
labor and postage
Copying —General
-
Any Size
------------
$0.25 er side
Assessment Search
$50 00 per half hour
C.
/ �
�
,��,:
Building Permits —Permit Fee
;Fees
based on Table I of 1997
UBC and are determined by the
........................................................................................................................................................................
.................................................................................................................................................................... .........................................
City's Buildin Official
.............................................. %ft . ................................................................
Building Permits —Plan Review
65% of Building Permit Fee
Fee
,B-----------
uilding Permits — Re -inspection
$37A_ 0�$38.00)_______
Building Permits —Manufactured
� $52.00
Home Location, Swimming
Pools, and Demolition
Building Permits —Special
100% of Permit Fee
Investigations
................... ....... ..
Building Permits —State
.0005 x Project Value or $0.50,
Surcharge
whichever is greater
Plumbing Permits —Minimum
$ 36.00 ($38.00)
Fee
Page 1 of 10
Page 2 of 10
With Changes
(Indicated in Parenthesizes)
without Server Training
.....:.....»..N....w.:.._:...-::..:_.:_.:.-,"-.._..._..:..�. m v . __._.V...�
Second Violation
� � ....:...__..:.�._:_w ... M_�.�...k:..�.:..�.�....w....._.�......�....m:_
$19000.00
........................................................................................................................................................................................................................................................................................................................................
Third Violation
. , , , , ,,,_,.,-.,,.., x,, .-.-- . ..... .� ...... ..... ..................................,.._.�...,,.�.,_...,,,.,.,._.�._,,,..,..,., »......-,
$1, 5 00.00
..,..,....,_,,...,v....,_,.,..,.,....,.,,...-._,...---.....--....,.-.,..-,,.,..,......,....-.-,..,,,._,....,..-.....,.-,-.,..
Fourth Violation
$2,000.00 and may be subject to
license revocation
:::::::::..::::.. :::::::::::::::::::::::...:::;:;:;:::.:.::::::;.::::.:::::::::::::.::::.::::::..::.::::::::::...:::;::::.:::::::::::::::
IV. M d :t Ord. a% ens
* * ......:..........:.:.:.:.:.:.,.,.,.........:.::. ::::..:..:::::
:::::::.:;::::.:::.:.:::::...:::::::::.::::::.:::;:::...:::::::;
..
.::::::.::::::.:.:::.::::::::::....:::..:::::::;.:::..::::::::::::::::::::::::::::::::::;::::;
:::::::::::::::.......:.:::::::::.:.:....::::...::::::..::
"....:: .....: ..... .
: ;;,::::::.:.:.:.:::::..:..:::.:.::......::.:.:.::.....::::::::::::.:::.:.,:.::.::.............
::........:. ........:.:.....
. .. .:::.:...::::::.:.....:::....::..::::..::..:::: .
..........:.:::....::.......:.:::..::.:...:.....:::::.:....::::::e.:.::::'...,..",::::::::::::,....:::::::::::::::::::::::::....:....:...::::::::::.::::::::::::::::::::::::::::::::.::::::.::::::.::::::::::::::::::::::::::::::.:.:::::::::,
Zoning Ordinance
:.:.... :::...:..:
... . .........:..:.::.
..1'_::::.:.*..::::::::.:::::::::::::::::::::::::::::::::::::::::�::..............................................................................................................................................................
:
j
,,, :; ....:...:......
025::per :side'.::::.
Municipal Code
f f
I
Comprehensive Plan
....... _.,.... ......... ....... ...._.._. .:_............_......._ . .......w ._..... _..,..
.....................................
s..._............................ ...................._.... ,.............
--- 1-1"-*,-"-",*-,,*****-,*,*-",-,--"-,--,"*---*-""---**-**-*,-*,***,-*"*-""-I
,.�......".,...-,---.,...",I."--."..-..--,,---...,--�-----,.--,-.-,,------.-----.......
Color Maps (8.5 x 11)
t.-",..-.""",-*--,--,",l*,--,-""I
$2.00
Color Maps (11 x 17)
.......................................................
1 .
_____ .-
$4.00
Street Maps
........ i
$2.00
__ ........................................ ............................................................................................................................:.......................................
_.." . .... -.,.............-...."....."---..-...,.,....,........",�-,..'�...".,.,...'.,-.-.."".�
As-Builts (11 x 17)
I
G
Based on number of copies and
> C
t
f
staff time
V Pa ks & R.ecr Batson :. ;
::
:: :......:.:... .:...:.
...... ......::........... : :
. ::: :::::.:: :::::.
_........... _ .:.
Ball Field Rental, Unlighted
.. .
... .. ..._..,....,w......................... ....., , ....,,
.. _..:..r....._:......w:::.:::_.::::.:.:,.."........:.:.....:_
Per four hour time block.
.:.:w....:.x..�:x.:...�:::::.:::::...W.;." .r.."w ...:...:.::::w::::.._:::::.. �_ :.
$35.00 ($40.00) per day (+
....................... .................................................................................................................................................:....................................................................................................................................................................................................................................
Tournament fees are extra. i
a licable tax
... .... .....................................................................................
Ball Field Rental, Lighted
Per four hour time block.
$75.00 ($80.00) per day (+
..... I ............. 11 ....... � .................... I ........ ........... .",'., ... 1.11 ... . .. I . . ...... � ..... .. 11 ... I ......... _ ........ -, . .............,
i
tra. to
Tournament1-1--l-,'.
I ....... --------------.--------.---..-----..-.-..-fee ex
. . ............. . .................. .... . .... . ............ . ......... ...... . ...............................
applic_ . ........... .......able tax
. � . .......... ___ ....... pp
� .... ____ . . ...... .'..'_'____..._'_..'_' .... . �....-
Ball Field Tournament Fee
{Includes all day maintenance
$500.00 per day + $100.00
(Adult), Full Maintenance
staff on site �
damage deposit (+ applicable
(New)
........ ......... ......... .......1111.11111.1-1-111111-11.11
ta1.x)
Ball Field Tournament Fee
f Includes preprep for fields and
$300.00 per day + $100.00
(Adult), Minimum Maintenance
t midday drag of fields
damage deposit (+ applicable
(..... � .... .......... . . . New) ................................................ ,.'" ....... ....... ...... ....... . . . . . ...................................... . . .... ""'..., .....t
........ . ..... . .. _.....".'_."'."'........ . ... ....... ... t ....
tai
......... . ...... . ................ . ............. -.,.-" . .........x
Warming House Rental/Ice Rink
r Only allowed during non-public
$25.00 +
Rental
;use hours 1
$100.00 damage deposit (+
A i
applicable tax)
......................................................................................................................................................................
Picnic Shelters, Resident
....................................................................................................................................................................t
` Includes up to three picnic tables #
.................................... ^ ... ^ .....................................................
.............................................
$35.00 per day (+ applicable
........ ........ ......... ......... .........
& one trash container
t............................................................»..................... ......... ......,.. ,.......,.......,..,....
tax )
...........................,...,...........,.... _........
Picnic Shelters - Non -Resident
1, Includes up to three picnic tables �
$50.00 per day (+ applicable
{ & one trash container
.
t ax)
w..�,-,...................,.........................`
Picnic Shelters -
...�_.....�.--,_....:..:.__......_._:._:..m..�-,,--l"...:�v:..r....»...v..:........:._.........................._..�.�w..�..-___.....�...�....
I Includes up to three picnic tables
",............�.._._.:....-.............k....�.:.,......�...w.V..w.�..�w.....�.�.,---..�.....-,.......�...........�..............
$10.00 per day (+ applicable
Resident Non Profit
& one trash container
tax)
.... ......... ,_....,. ..,.........,,,,, ............. .
Picnic Shelters -
Includes up to three picnic
$35.00 per day (+ applicable
Other Non -Profit (New)
........................................................................................................................................................................................................................................................
� tables & one trash container
..................................................................................:....................................................................................
tax)
................................................................................
Picnic Pavilions - Resident
= Includes up to five picnic tables
$50.00 per day + $100.00
I& three trash containers
damage deposit + $50.00 key
deposit + applicable tax
p ( pp )
...........................................................................................................................................................................................................................
Picnic Pavilions - Non -Resident
. Y....................................................................................................................................................................
I Includes up to five picnic tables 1
$65.00 per day + $100.00
& three trash containers `
damage deposit + $50.00 key
..................................................................................... I ........................................ I .........................................
t
L
.......... I ................................................................................... ..... ............ I .... I ..................s
"' ... *' .... * ........ t ..........................................................
to
de o it... applicable x
Picnic Pavilions -
Includes up to five picnic tables...........................................................................
$25.00 per day + $100.00
Resident Non -Profit
& three trash containers �
damage deposit & $50.00 key
......... ......... ...._.... ..,..,.... ......... .,,.,..... ...,.,.. ...,.,,.... ,....., ,.......,
_ i
..,._,. ......,.,,..,.....,..,..,... ...
......,.,,..._..,,.....,...... ......,., ,.,,,,.. , .,...,..,, .......... ....... f ...
deposit (+ applicable tax)
....
Picnic Pavilions -
Includes up to five picnic tables �
$50.00 per day + $100.00
Other Non -Profit (New)
& three trash containers I
damage deposit & $50.00 key
_....,..
deposit + applicable tax
Additional Picnic............................................... � ............... - ... ................... Ta___ .......bles....... . � ...........
".,."",.....,...,....".�-.........� .............................
For every two extra tables
-",P�.,.""..",.",-.,.....,..";,�,..,..,."-"..-.,�fk--.^--,..-.-"-.,��.",--..�.,.,.,�."........",..,.� ........... e ............ �..... ........
$5. 0... �0 (+ applicable tax) a............. . ..p
Page 3 of 10
With Changes
(Indicated in Parenthesizes)
1.:...... :.......... _._...._:_.....::.._...::_.:..:.v. _....__.._ .... _..._...._ . �._w...
Additional Trash Container
�� . � � � . ��.
One additional trash container
� � � _ � _ .�...:.�.�....
No additional cost
.:..:...... :............ .....:...... ......_... ................ .,.,...:........, .... ............:........»......................
I
for every two additional tables
....._.:.....__.................._.:,......................................::...............:................,................................................
i
i
-,4.-,.........._....--n .:...__..w.xn..........n........_..._..........m.n........w....a...........,........wn......n.........:........n......:...........n ......
Community Garden Plot — One
r Annual (20 x 20 plot)
$35.00 (+ applicable tax)
PlotI
r
........................................................................................................................................................
Community Garden Plot — Second Annual (20 x 20 plot)
$17.50 (+ applicable tax)
Plot
I
... I ....................................................... I .......... � ................. .. ............... � ........ ........................................ ....11.111 . . . ... .............
Room Rental — City Hall,
#.....
. ... . . .-— ......... 11-1 .... ..., ... I .... ..,..,..- . ......... ..... . . . ................. ... . . ..............................................
Per Day (Scheduling a room
11*1--",*"***"",,----,-,,-,--l""I-11111*11"**-""",--",*,",---*""--l-1-111*-"""""*-,-,--*,,ll,",-"*-,-,-
Daytime usage: No charge
Community Room
after regular hours is contingent
Army National Guard: No
upon the presence of a city
# charge
.
,i employee; In the event staff is
I City Government: No charge
not available, the City reserves
Resident, Non-profit: $60.00
t the right to deny application)
Resident, For -profit: $70.00
tNon-Resident, Non-profit:
s
1
1
1
1 $100.00
i
Non -Resident, For -profit:
i
i $130.00
r
t (+ applicable ta x
Room Rental — City Hall, Small
# Per Day (Scheduling a room
t Daytime usage: No charge
Conference Room
after regular hours is contingent
j Army National Guard: No
upon the presence of a city
# charge
I employee; In the event staff is
i City Government: No charge
not available, the City reserves
;Resident, Non-profit: $25.00
the right to deny application)
i Resident, For -profit: $3 0.00
Non -Resident, Non-profit:
$40.00
C Non -Resident, For -profit: $50.00
1.. I....,."....-,....,.,.,..,.,.-.,-.,..-.,.,�,.�....,.,...,...,.,.,..'�-,.,..,..�.--"".,.,.,.",",-,"--,.-..."-,.."..."".,--",.,...
Y (+ a licable tax
Room Rental — Damage Deposit
�NN... __:_.....::..::__.. w ::�:_.::_.:_ ..:_..:..:..._�w.�:__..�
. ...... ......... '. ...... � ............ .........
'I Required
� �w �.:.�_.�_:....�.:.:.__::..:...._.::._.::__._.�:: w �N
......
i $100.00 _
»�_. _ ::w_::._ - .:_ .:_: _ ._.� : w.��.�_ w w� �..... �.�...w.�.�.
Equipment Rental — DVD, VCR,
$10.00 (+ applicable tax)
T.V.
.:.:.::..:..:: ::: :::::::::::::::;:: .: ..:: ::.. :.:::::: .::::: :
:. . ,.. _ .:. . .
P n a nin
___ o an. zanr11n Each se agate iiiaan+d nse re nes .hall be char+ a.. :e mate fee .even:
.::.::::::::::::::..:.:.:::.:::.:::: :.:..:::: ..::::::::.....:....:.. ::...
. (. p. .................... ..............................................
.: ;. :.:::::::: ::.:::: :::.. :; :::: :_:: .:: :.:::::..::.::::. : :::.:::
_ .. .. ..�ii...
I ::.: ;...
n �tted o p s :: ::
n the...s.axne. N.:,►+.a:(3::':n<:: (E :: ' 4: tQ<.: >; .::::: p
:.a.... �t�...I�.........t e...a .. hca..I.on.. e.e ..an..... ann n ..cas.es..ar.e...sub..ect.... .
_..............................................................................�.................................................................................................�........................
F.
.1. . ..:... .. ,..... .... ..................... .... .. �....... ...:...:..
t11-110 a rnmmu m e c o ::
s r w fee to cover a� cOn . t u xn postsei ma 1nur Aita:na:char �e m
. ..: ..... :.::.... ::.:. ...:........ .:.:.:.. .. ::.:::::.: :
1. . ::; :: :::::: :: : ::::::::: :. ::: ... :::.::: :::::; ::::::::::::.
a the n l m - -
1 _ __ _ co c xce the:... r. m n 'h. r m is ;:
_ su t_ osts e _ esc......o.I a ou ......... e e c ow v d. r u. r.
pp 3': . :: .. :.:::.:::.: ::.:::..::.:::::. :.:::...:.:..: ......a be w.a....e... a eel o
_ _....... _ .............. �.. .
: .:..:....... .. .: .::.. Y
.......::: ::..:. :::::::..: .::.:.:..:....: ::
_ _ ..... .... ..
�ncreasel : ::.:
.; ....
b the_ t : .tanner on a. ct: c . _ _...... . ro. + roe t bans. ii:_
.).
:::::::::::::::::::::::::.::::::::::::::: .
................. :::..... .
:: .:::::.:::::::.....:.::.::::::::::.::.:.::.:..........:::::: ::::.::....'..::::...:..
. .. ..
............ . ._ __ _ _ _ _ _
D� r _
sc tzon _
__ _ .....
_ _ ........ ..
:.-...::....:.:::::::::.:..�N..::.:..::.::::...:::�.,.....,�::.-:..:;:.: w .::.:.,N . NM.."...::..:
..... _... .................
z ::: ; ..: .:.::.......::..........,:;:
i :.: sir ::* s.... ...... ..................... ..n�t��c1t.ccn.'�es
................ .
::: , �. .:... .
::: _
-,-.,::.:rr N:.
Preliminary Plat
1.:.
�...� ....v:.-.... �� ����::�:..�.:.. w� :.�w:�....ww.... ��.�......�
r Administrative Fee
;:
- � _� �... ..� . w w .........� v..� �.� ."�""..:r:�
$600.00 + $25.00 per lot
....,...,...--.,-.-,.,...............................,..:,..,......,.....::...-...,.,...,,.",-.,,,......,.......,....,,,..,._.,.,,,.......,.,.,....,.....,....................._..._,....,...,:._,,....-"..,,...,.........-
Escrow
.........,..,...,...,..,.............,._....-,...—.._._....,....,,,...._.._.,.._......_.................,...,.
$500.00 ($1,500.00)
Final Plat
Administrative Fee
......................................................._................................................................................................. v.....
.
$400.00 + $25.00 per lot
_...................................:.................................. w........w..........................................................................
... ......... ......... .........
i Escrow
No charge
Lot Split/Minor Subdivision
i Administrative Fee
$425.00 ($450.00)------
i
r Escrow
300.00 1 000.00
Rezoning
Administrative Fee
r.--,..:..:.:...-....—...:...�:............::...�:...s,.�:....:..:.:.:..w...:..w�:...::-.l..-.._..:....w...:.....:..:�:::......�.:..w::::�.::.
.-
.).
$550.00 ($600.00)
w.:..NN..:.__..:-:.._:._::::::.:.v _ :: _. .w_ .�:k�....v...�N:.�..: ,.--_V...—....
..........
.... ......... ...............................
Escrow (New)
$1 000.00
Comprehensive Plan Amendment
; Administrative Fee
........ ................I........ .................................. ......... ......................... I........
$550.00 ($600.00)
............................................................................................................. ......... ...........-
.....
......... .......... _.........:.:.....:.:.::.:.:....._w_...:.�...�:v:._._
Escrow (New)
-.-__.w..��.....�..:....:.--...._-.,_..�:...�:..v..-.�:�...w__:.._..:_.__.......-....-%
.::_:_..:�::..�...:�.:.:r:�:..._ $19000.00
Variance
Administrative Fee
t..............................................................................................................................................................................................................................................................................................................................
$3 ($3 50 00 00.00)
......... I .................. � .................................................... ......... ......"I ......... ...._........... ......... ..............
. ...... �.., Escrow (New)
I .................. 1-1 ..... ......................_......................... ...
$600.00
Conditional Use Permit or
11........
f Administrative Fee
I",...... ... .
......... ..................._._.....w................................................ ..I........................
$350.00 ($300.00)
.,.............._....,._.,...w....................._.,...
Amendment
........................................................................................................................................................................
Escrow (New)
€..................................................................................................................................................I..........................
..
. $600.00
Page 4 of 10
With Changes
(Indicated in Parenthesizes)
Interim Use Permit or
` Administrative Fee
$300.00
Amendment (New) _........ ...... ............
..........
...................................................................................................................................................................................................................................................................................................................................
Escrow
, ........................................................_......................................................................................._...................._..................................w................................_.......
$600.00
.................. ......... ........ ..................
Planned Unit Development
i
Administrative Fee
$600.00
Master Plan
Escrow
s.........................................................................................................................................................................................................................................................................................................................
$500.00 ($2�000.00)
....................................................................................................................................................................
Final Planned Unit Development
Administrative Fee
New
$200.00
$600.00 ......
.......... ............................. ................ . . ... ....... . . . .....Escrow
Planned Unit Development
Administrative Fee
$350.00
Amendment.,^..Escrow
(New)
$2,000.00.............................................................................................................1.........................................................
............................................................................................................................................................................................................................
Planned Unit Development
r Administrative Fee
.........................................................
$300.00
Concept Review (New)
Escrow
k................................................................................................................................................................
No Charg..................................................e.
....................................
......................................................................................................................................................................
Vacation of Easement
Administrative Fee
$300.00 ($400.00)
_._.............................:............_......................................_..............................
Escrow (New)
_......._._....................... _ . �................ __......_.............................._....
$600.00
Site Plan Review
................................ .
Administrative Fee
$400.00 ($250.00)
........................................................................................................................................................................................
Escrow New
k�.,................�...).......:...,.,.,......,:...._.........................................w.,�,,....,...........,........�:.
$..............................................................................
600.00
...._.,._........,.........,,._..:,..,:_..,,::�.....,,,...,,....,�.�,....,...M............�..:....................................-:......�,......,.....................
....._....:..:..:......................... ..........__..:..........:.......:.....,........:..,:...:..:.........:...,.........................._____....._........- ....„..................... ....
CityCode Amendment
.........:................,.,.....,..,,........,.
y Administrative Fee
_................. ,_ ,...... _...,...........,..- ,. ...............................
$550.00($600.00) ..:....
........-........:..._..._...:......:..--- ._.--------- 4.._-..:.......�.__.._..................
_ ........
Escrow (New)
_......... ._...... ... _..... ...... ... ....................
$1,000.00
......... ......... ................................................................................ ......... ............
ZoningCodeAmendment
f Administrative Fee
.. ............,....._......................................................................................._.........................,...,
$550.00($600.00)
.. ...._,_....._.................Nw..........., ,,,,,,,,.w....._.w._..__..w,..._..,...,...................,..._.......
Escrow(New)$1,000.00
................................................................................................
............................................................................................................................................................................
Zoning Letter
.................................................................................................................................
I Per half hour
$50.00 + $50.00 per half hour
after one hour of staff research
t time
......... ..................................................................................................................................}..................................................................................................................................................................................................................................................................................................................................
Land Use Requests — Not Already
I Consulting fees and
$200.00
Specified
administrative escrow
(Administrative Fee (Escrow
may also aimlv)l
y
Zoning Permit — (New) Fence
€ $15.00 ($50.00) for first 100
Construction (or Expansion)
lineal feet + $6.00 ($10.00) each
additional 100 lineal feet, or
r
€
fraction thereof
..................................................................................................................................................................
Zoning Permit — (New) Driveway
...............................................................................................................................................................
..........................................................................................................................................................
{ $18.00 ($50.00) for first 1,000
Construction (or Expansion)
;square feet + $6.00 ($10.00)
each additional 1,000 square
..:..:.,:..._.:...w...::......._.....r...�v
feet, or fraction thereof
�............�...a.__.._w � �.w._..__._....::.:...M...._..........
............ ....... . . ... ... . . . . ... .. . . . ..... . ... .. ..... . ................ ... ...... . .......:.......:.:..........:..................:.:...:.:........:...................:.....:...:..
Recreational Vehicle Parking
-...:::.._-.�:.::.............:.::.M....M...:......:...:...............:.:....:..........�
7 Day Permit, renewable once
$10.00
Permit
per 12 months
_ ...__. ,..... ... ........
......... ......... ......... ......... .... .........
Home Occupation I Permit
_..._..................::.:......................._......:. K....._........:....:..._...:.._.....__:..:r
No charge
:._. w..k-w._._......._..__..::_....-- w..w�.....:__.::..:..: _x..........
......................................................:...._...:._..:......_...:..r.........:.......r
Home Occupation II Permit
.rr:.. v �...........:.
r Consulting fees and
$350.00
administrative escrow
...,....... _ .._.._................,..._...:.:.w...............................
_ ....._._......._.......:......._....M......._........................ ........
Right -of -Way Permit
,....x
k
Per Excavation
................................................................................................k....
➢
$160.00 ($175.00)
_.................................._...................................._.........
Erosion Control Fees — Less than
Staff costs for conducting the
$155.00 ($300.00)
one acre
2
inspections
w w .�� _......_...� �... :..r... �..�._
. . . . .....:.....................:.:.....:.........:..�........................
Erosion Control Fees — One to
......._................... _ .:... �...................................rw.........w.._w..�_._.r..........................w
= Staff costs for conducting the
M�v......�...��.��...____
i $460.00 ($700.00)
five acres
inspections
.............. I.- ................................. .......... ................ ........... ....... ......
Erosion Control Fees — Six or
......................t
? Staff costs for conducting the
...................................................................
$720.00 ($19100.00)
more acres (More than five
inspections
acres) .................... .................... ...............................
..............
......
Grading Fee — 50 cubic yards or
Staff costs for reviewing grading
No charge
less
..................... ................................................................................................................................................
= plans and conducting inspections
.....................................................................................................................................................................
..............................................................................................................................................................
Page 5 of 10
With Changes
(Indicated in Parenthesizes)
Grading Fee — 51 to 100 cubic
Staff costs for reviewing grading }
$30.00
yards
plans and conducting inspections
............................................................nn........................ n n n. .. ..y...
...._..v.................x...N................�...._.. _....._...._... _.._.......................... _............
............................ .......... .. ........... ... ......... ... ........... .............
Grading Fee — 101 to 1,000 cubic
...».......
Staff costs for reviewing grading
$50.00
yards
plans and conducting inspections I
......................................................................................................................................................................2
Grading Fee — 1,001 to 10,000
......................................................................................................................................................................................................................................................
Staff costs for reviewing grading
$75.00
cubic yards
? plans and conducting inspections
...,.,...........,..............,.
...... .. . _.....,.,............._....,......_.,.,,:.,.,..,........».... ..............,....,,,,,
Grading Fee—10,001 or more
..k._.»..........................:...........................»»,....,...,...,..,.,...».».,......»,.........
} Staff costs for reviewing grading
$75.00 for first 10,000 cubic
cubic yards
plans and conducting inspections
yards + $30.00 each additional
t
k
10,000 cubic yards, or faction
3
thereof + additional plan review
fee of $50 per hour (minimum
i
r
i
.........................................................................t...................................................................................................................................................................
charge of half hour)
Appeal of Administrative Zoning,
Cost of staff time to prepare
$75.00 ($100.00)
Sign, or Subdivision Decisions
, appeal information
_......................»,..,.z,.....,_...................,.......».....,,,,...»,.......».w..
,.,,_._...,....,.,,,,...,.,......,.»._..,....._.. .
.: :::.:
t t u es
1:
.::...:::::::
::.:::::.........: ...
::::::::. :..:::::::.::
::.;::::.:::.:::::;:::::. ::
...................... .:....:::.::.: .....::...:::...:::..::....:..
..:::::::::::...:..::.:::::::;:::
..:.::.:
N.......................
Water Permits — Service
................ ...........:: j ..
. ........:...:..........:::..............................:..............w...,..:...................::..:..............:.A...............................,..
(Per inspection)
r.........................,:...............:..........:.........,...:.:......,....,v......v.,.........................................:.......
$37.00 ($38.00)
Installation(/Repairs/Alteration)
k
Water Permits — Interior
$37.00 ($38.00)
Plumbing, New Home
................................ ......... _...._.. .........
....,................................................................................ r.......................................x......
_.........................................................................v......_........................._....
Water Connection Fee, New
........... .....,..,.,..................
s
.. .. ....f...,.
$83.00
Water Turn On/Off, Temporary
.........................................................................................................................................................................................................................................................................................................................................
E
.
$35.00 ($38.00)
.......................................................................
Water Permanent Disconnect
$205.00
Curb Box and Service Lead, 1"
.............................».... ...........
Service Connection on
r
k
Unsurfaced Street
.. ....... .... .....
Restoration of Typical Road Mix
— ------------
$100.00
Street
........ ....... ... ...... ........_ _
Restoration of Higher -Type Street
..... _........ _.... .---------- ..... . ...................
Set by Engineer
.... . ..... . ....................... . ... . . .........
Larger than 1" Service
f
Set by Inspector
Connection
....... ...... ................ ............... .... .. ..................................
......... ......... ......... ......... ......... ...............
Water Permits — Plan Check Fee
_....
Set by Inspector
........ .....I.. ........, ........ I.....,.......... :....-, ......._ ....»...
Water Permits — Re-inspection
*
$37.00 ($38.00 )
........................................................................................................................................................................
Permits — State Surcharge
...................................................................................................................................................................................................................................................................................
............. ...........Water t
$0.50 (.0005 x Project Value or
..................................................................... .......... ......... ..........
..........."'............................ ........... ........... .. .......... ......... ........... ............ ...,,....................
$0.50 whichever is treater)
...............................::......,....:.............�......... ..,. ........».. ..... ....
.....................
Water Meter/Spacer Charges —
k.........
Fee includes removal of meter,
k
$130.00
Customer Requested Water Meter
bench test at maintenance
Accuracy Test
facility, and returning meter to
residence; Fee will not be
applied if the meter is found to
be inaccurate to a degree t
k
exceeding three percent (3%) {
from the result of the bench test
.... .............. ...............................
...................................................... .............
Water Meter/Spacer Charges —
$3 80.00
3 /4" x 7 1 /2" Meter
. .... ......
Water Meter/Spacer Charges —
$405.00
3/4" x 9" Meter
Water Meter/Spacer Charges — 1"
......... .._........ _........ ................... ..._ ..... _
$430.00
Meter
E
Page 6 of 10
With Changes
(Indicated in Parenthesizes)
............:..........._..................._................................. » . N_.:.... _.... ..._»..._....,.,.._....., ............N.,
Water Meter/Spacer Charges —
, ::.:. N.,....._.:...: _...._.. _ _ _.._..._......: �....,_.:_ _ _ .._ _»_ .�
z
, _» a w _ _ _�» _ �.
s $700.00 (Contact Public Works
(Greater than 111)
for Quote)
Water Connection Fee —
$800.00 per acre or portion
(Connection fee for previously
thereof
un-served or expan.......... . ......ded lots
..... .....
}
Water Availability Fee —
(The units are based on the
$300.00 per unit
(New or Additional
? Metropolitan Council's
Connections)
formula for calculating new
sewer availability charge
t
................... ................ ............. ........`
SACunits
. .
..................................._......................._.........._......_.. _...,....,...»,.._..._.,_................
Sewer Connection Fee —
f $800.00 per acre (or portion
(Connection fee for previously
t
s thereof)
- n 1
un served or expanded ded lots)
{
t
Sewer Availability Fee —
x (The units are based on the
$300.00 per unit
(New or Additional
Metropolitan Council's
Connections)
I formula for calculating new
sewer availability charge
SAC....units)............................................................................................
Sewer Permits — (Service
(Per inspection)
$37.00 ($38.00)
Installation/)Alternations/Repairs
.................................... ...................................
_..,...................... ,........................................... ........... .......... ..,.................. ......,....
.... ..:.... .....,....,.....,.....,....,....................................................,.........................._......_...,..... ...................-
Sewer Permits — Plan Review Fee
>
Set by Inspector
........ .......... ........... ... ........ .... ............................,..,.,,..,..,................. ........... .....,,.....
Sewer Permits — Reinspections
.. .... . . . .. ... .. ......... . .. ...:...............................................
............................,.............. ........... ..., ,. .,,., , , ,....... , .... ... ... .. ,
..... .............. ..,.........,.,..........,................,.....................-..,.......,..........,,.,...,..,....,...........:...,.... ......................
i
$3 8.00 per hour
Sewer Access Charge
Set by Met Council Annually
$1.825.00 (for 2008) ($2J00.00
.......................................................................................... ....... ..... ... . . . ..... ... ......... . .Sewer
E
t
for 2010))
Permits, State Surcharge
t
$0.50 (.0005 x Project Value or
...................................................................................... .
...........................................................................................................................................
$0.50 whichever is reater)
............................................................................................................
Sanitary (Sewer) Utility
$100.00 per month
Prohibited Sump Pump
Connection Surcharge
::::
c l n u ::.: ..:: ::: ...: .......::
VIII 1 A : Iv :: ::
_ _.: __ s__� _a eo s�Ret ct ..:..is:.. ...... :..:. .::::..
.: .. . ...
::::::::.:.......::::::.::
.. . ::: :::::::: ::::
3/4" Hydrant Meter Rental
.
No monthly fee if returned
$10.50 for permit + $100.00
(New)
'within 7 days
deposit + $25.00 per month
t
rental+water usage
............................................................................................................ ......... 3" Hydrant Meter Rental (New)
? No monthly fee if returned
$10.50 for permit + $800.00
within 7 days
f deposit + $25.00 per month
renal a usage
t 1+ water
Boutique/Garage Sale
Application/notification of City
No charge
Hall required
..................................... ......... ......... ........................................ ..... . ........ .. .......
Casual Roadside Stands
................., ....................................................... ....... .....,....... . ......... _
Application/notification of City
.
No charge
Hall required
..... ...
........................................................................................................................................................................:...................................................................................................................................................................::...........................................................................................................................................................
Tent Permit
t $50.00
i,..
......... .......... .......... .................................................................. ......... ......... .........
Sidewalk Sales
............. ....... .......... .......... .............. ............ .......... .. _ ...... ............ ........
..... _.. ........ ......... .......................... .......... .......,........ , .. ,...... .... ...... ,_ ....... . ..,....
$50.00
..... ......... .... ...... ......................
Business Licensing — Amusement
Includes arcade, dance hall,
.;.........
$100.00
Facilities
2 movie theater, pool/billiard
}
tables, bowling alleys, indoor
tennis, skating facility, outdoor
3
tennis s driving ranges etc.
> >
Business Licensing — Wholesale
— -----------
= Liability insurance required
$200.00
Bulk Fuel Storage
......... ......... .................. ....... ........
Page 7 of 10
With Changes
(Indicated in Parenthesizes)
Business Licensing Hotel/Motel��
...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
$6.00 per room
Business Licensing — Courtesy
j
$25.00
Bench, Non -advertising
}
t
Business Licensing — Courtesy
f
$75.00
Bench, Advertising
.w.....................:....:..
Business Licensing _
Includes musical devices,
$15.00 per location + $15.00 per
Mechanical/Electronic Devices
t amusement rides, bowling alleys,
machine
etc.
5
i
.. ...... . . .... .. .. ........ .. ... . . ... .. .......
:......................,.........,...,...........................................,..........,,......,........................rr..................r....r...:..............................
Business Licensing — Retail Sales
.. ..
t..... r..w.v. r.v.....w....v.r..,....,..r.w.w...r..v...ww.....w.wr.......................................................,.......................,........................,,.....,..............,,..............,..............v....,............,,w.....w...m...,vrrwm,.....v.,w.n.nw.....m,vw.,vnw....,,,,,,...,
t Includes antique shops,
....,,,,,..........,,..,,...
$50.00
i
y beauty/barber shops, boat
dealers, Christmas tree sales, dry
cleaning, laundry, bakery, candy,
meats, wholesale foods, caterers, {
motor vehicle sales, optometrist,
s mortuary, video sales/rentals,
} over-the-counter tobacco sales,
vending machines (excluding
tobacco), & other retail goods {
not listed
.. ........................... ...,....... ......... ....�...,:.....�:�.�...�.�._.k.�...�...v...��..w...�..._._.k..._.r.._..�.�...�....__.�.....�.M�.k�...N............v....�w�...�....��...k.�v.._...__.�....__,,._V...__,v..�.�.__..�..�.v.�,.�.K.�...�M�w.�,..��.�,..._.......�_..
Business Licensing — Restaurants,
$20.00 per 1,000 square feet, or
Cafes, Coffee Houses, etc.
fraction thereof
....,...... _. _ _ .. _..._..... _.._. _._....... _ .._..
Business Licensing — Restaurants,
z...,.._.,.........., ......_,,..................._......_,....,.............._..,.......H..,._,..._,........,.........,..._,...._,......................_,..,......,...,.w....._..�...,
. ,,._,.,.,....,..._. _..._._.
$300.00
Drive-Thru
..................................................................................................................................................................
Business Licensing — Service
.................................................................................................................................................................{................................................................................................................................................................
$100.00
Stations
Business Licensing — Grocery
f
$20.00 per 1,000 square feet, or
fraction thereof
............................ ..,..,....,..,.:.......... .,
Charitable Gambling Permit — Per
---------- .-..-.-..
1 Includes investigation fee
$150.00
Minnesota State Statute, Chapter11i
34.
.9
Tobacco Sales License
Includes investigation fee
$200.00
........ ......... ......... ......... ......... ......... ......... ..................
Fireworks Sales
.............v................................x...............w._....._..............
As part of existing business
w. k................................... ......... ................
$100.00
.... ....,...._
Fireworks Sales
...................�.............,.....v_............_.w._..............,......,........._.,._....................._-- ... �.....
{ Exclusive Business
_....................
$350.00
......... ........ ........ ......... ..............- .... ....................... ......................................
Massage Therapist
..._..._. ..........._.._.... ..._..... _... ......... ...
Annual Fee, Includes
......... ..............................._.................. ......... .................................................
$50.00
investigation..... fee
. .......
Massage Therapist Establishment
. ..... ------- 1_11_________11_____11 - -- - ---------------
Annual Fee, Includes
$150.00
................. ........................................................................................... ............. ............. ................ ...........
i
investigation fee
.... _........ ....... ............... _.._ ........ _........_......._.... .....
_....... .....,,, _., ..,, , ,.. ,, . ,,,.,,..._._._...... 4_..... __...._..__ .......
Solicitors, Peddlers, Transient
Please reference Section 350 of E
$150.00 background
Permit — For -Profit Organizations
1 the Municipal Code for more i
investigation + $100.00 per
information r
month permit fee
....... ............................... ......... ............_ ._,.._._..,,,,._...._. _ v.
Solicitors, Peddlers, Transient
M_.....�,, ..,... ,,,....,,,...,...........,......._,,.,....._...,..,........,.._,...,,,...,,,,,...............,,,,,,.._.,,
Please reference Section 350 of
,,w,,,,,,,,,,....,,,,...
No charge
Permit — Non -Profit
£ the Municipal Code for more
Organizations
information z
Tx ::::
n s
:::.:.:::::::::::.::::
..::;:..:::. :::.:......
::::::::..:: .
:...::.::::::::. .......... ..: .
Initial Fee
I Per Sign E
f
,..
$50.00
............ ....._.. ......... _...._... ......... .......
Permanent Signs, Annual
; Per Sign, 100 square feet or less
$20.00
Renewal
................:.....:..:.:..........:.._........................................vM..,,.._..,,..,...........v.,....:.:....................,.....,..._..,:._......,,...,,
f
(maximum allowable size) r
Temporary Signs
.............................._
,..r,.. ,..„,,,..,,, ,�....�.....,....----........,.,,..... .,..„.,,,,,......,..�...:.,,..,,�,,,,,,,,,,,,,,..,,,,,,.,,....,.,...,,.,.,.,..,,..,..,
k
$50.00
...................................................................................................................................................2.................................................................................................................................................................
Signs, Impoundment ..,,.,..
..............................................................................................................................................................
= First Offense
3 ...... :.,...............,... ,
$25.00
_ .................
Page 8of10
With Changes
(Indicated in Parenthesizes)
:^Signs, .V.Impoundment .��»..._:..:...:_�.:.::.:::.:�..�::.-m..�__,.:.,..
f._
� Second Offense ���.:._._...»..�..�...�_».�..�:__..�.:..�».»;:.:._.»»M»..�.»..»..»»N»»�.».»..»__.._�50.00
........................................................
Signs, Impoundment
Third Offense
$100.00
::: :;
u F I' r:rn :::.:::::::;.::::.:.::::..::::.::...::::::.
e e e
sC u.a�eo .. . e �� .. is . .
.
::.: :..: .
.;:.:....:........:..........
.........................:.:::..:..:
......»...».............._...._.........»..............
Rubbish Hauler
...:.. .
»...._»..................._.........................................».........»..........._.....».».........._......
Annual
_...,......_....... w»....»....»......»......................._...»_...........................»_...
$150.00
........ ........ ................... ....----,.......... ....... ..................
Recycling Hauler
....................................................................... ............_........... ...._....
= Annual
.... ..........................................................................................................................................................
_....w..----- ..............._......._...................-,--.......................
$150.00
Contractor License
Annual
$30.00 ($50.00)
...........:...........:....,........_..........:.._..::.:............__..:::.::::.:_..........::..:.-----.:.,,,....._..::.....».:..:...:.:..:.:» ::.»..:..»..:....w. »� _:�k...»..�...................................... ........ I ...................:__... �......:._:_:w......
Miscellaneous Permit Fee (New) For all other permits not listed -
...
» »� » w.
$38.00
....................................................................
Staff Research
$50.00 per half hour
Penalties for Late Payment
Failure to pay any penalty
10% of license fee or $30.00,
imposed shall be grounds for the
whichever is greater
suspension or termination of any j
license issued by the City
. _.................. ................................................ w...........-::.:.:.........�..w
Tobacco Sales, Illegal
g
t .... _._.�.........M.................................................._........----- ..------ .._.:..........._..._............
First Offense i
__.................._..............._.................... ..........
_.......................... .
$100.00 + warning
.......
Tobacco Sales, Illegal
. . .......................
. - - ------------------ - - - - -------
- - ------- --------
t Second Offense
. .............. . . .... . ..... . . . . . ..................
Suspension of license for
i
remainder of calendar year
Tobacco Sales, Illegal
Third Offense
....................................................
Revocation of license for one
year
Candidate Filin Fee
g
t
t
2.00
Insufficient Funds/Returned
$30.00
Check Fee
i
........... ............. ........,.. .................................................... ....... ......... .................
Rental Registration Fee
.. i................................................................................... �... ............ ........... .......... ................:....
i
...................:.......................... �.. �........
$40.00 per rental unit
....... ... .. ._....
Rental Registration Penal Fee g Penalty
_ _........ _.._..............:.........................................._.....M..................:
v...... . »......... _. »....... _.............
$80.00 per rental unit
:..»......:......_.:.......:........._.._::»._.». »....:_.....� m..,, �._r..»:..»».:..._._.._...w..-».»::.
Residential Contractor License
� ._» »� � . � ».:..w» _ ...._
. _..__ �� »r
$5.00
Check
..............................................
Business Subsidy Application
} Required to reimburse City for
$29000.00 + $10,000.00 escrow
Fee(New)f
eu
11 t f review
cos o
:: .
I. Fal se A ar :F es ::::::::::::::::::::::
:. :: ::
: ` :::::::: :: ..... :
.: ....::.:: .:...::.: ...:::::...........:...::......:...:..::......:....:.....:.:::.:.:...:::::.:.:.:.:..:..:.:.:...:.
False Alarm
::. .............. ....... .. ...... ....................
.............................................................................................................................................................................................................................................................................................................................
;First three alarms
... ......... .
No charge + letter
False Alarm
Four through fifteen alarms
$50.00 per alarm
................................................................... ....................................................................................................
False arm Al
. .......................................................................................................................................................................................................................................................................................................................................
Over fifteenalarms
150.00 per alarm
.... :::: ::
....
by ` ti l >::::::>;::::>:>:.>:::::;::.>.;>::;
s at Q ees .
:: ::: :..:.::: ::.:.::::::.::::
........ .: ..............
.::::::.::.:. ..:::.... . .:: :::::::::
:: :::::::::::: .::.
... ,::.
.: , .:.:: :::::: .
_ .. ,......
Tobacco, Liquor, Charitable
;:.......:.......................::::..:......::.... . .:..:: .;.:.:..:..:.:.::....
....:......:::.. .
.._:
'
. :::.....:.::::.:. .
$150.00
Gambling, & Solicitor's Permits
.......
1I. U e .... tht ITs Char es
:::
:::::::.:::::::
Residential Water Per Quarter:
.. ......... ............................................. . ............. . .. . I . .. . ........ . _ ._.._......................... .........................._.........................._......._....._.............»...............
Senior Base Charge . .............
............ ........ ».....................
_ ..........».�..............._...........».._...._........_......._.. » ...»..----- ._------- ..._._..
$22.40 ($28.83)
Non -Senior Base Charge
.................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
$32.00 ($33.92)
Over Base — 10,000 to 35,000
$2.73 ($2.89) per 1,000 gallons
gallons
.... ......... ............................ ..........
............ ............................................................................................ ... ...... ........................- ....
..... ............... .............. ..... ................ ....................... ..... ................................................
Over Base — Greater than 35,000
$4.78 ($5.07) per 1,000 gallons
Gallons
.. .. ... ... ................ ................. .. .................................. I ............ .......... ..........................>.
Standby
................ ......... ......... -- ----- ....... .......... . .... .... . i
$00($6.36)6.er accp
Water Testr
. ..... .....
Fee set b M State Health De t
y p
.... ........account
1 .60
Residential Sanitary Sewer Per Quarter:
.......
Residential Senior Base Charge
.........1 ....... ....
_. ... ....... _ ,..... .
F ......... ......... ......... .........
$55.00 ($71.01)
Page 9 of 10
With Changes
(Indicated in Parenthesizes)
.......... _.._...._................. .._............. ..........._..._.....M......w_M..
Residential — Non -Senior Base
$67.83 ($74.75)
Charge
f
Residential Usage
$3.75 ($4.31) per 1,000 gallons
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
after 15,000 gallons
Residential Surface Water Per Quarter:
..........................................................................................................................................................................................................................................................................................................................................
Residential (Senior & Non- s
.
: ...............................................................................................................................................................
s
$9.32 ($9.60) per lot
) Senior
..I .......... .... ... ..... ........................................... ....I.... ........ _.................
f
........................... ....._.................#............ _................................................w..w...................................._..............._......................... .............
Residential — Townhomes
$12.08 ($12.44) per unit
......... .................
Apartment
$76.06 ($78.34)
Commercial Water Per Month:
Base Charge
` 3/4" Meter Size or Smaller s
$10.67 ($11.31) per month
...................................................................................................................................................................................................................................................................................................................................:..............................................................................................................................................................
Base Charge
1" Meter Size
$19.50 ($20.67) per month
............... ....... ....... ...........»............... _.».» v ...v.v.. r..»...» .........»..��...
Base Charge
g
» ».�.._ ..
1.5 Meter Size
_ _ _. _.. _
$36.31($38.49)er month
p
...I..... .I....... ...
Base Charge
2" Meter Size
$55.79 ($59.14) per month
......................................
Base Charge
.......... k...............................:.......k .._ .
3" Meter Size
� `
$116.22 ($123.19) per month
....... ----------
Base Charge
- 4" Meter Size
$172.01 ($18233) per month
................................................
Base Charge _
' 6" Meter Size
._._..»..........................»......-----.»_._.--.._..,......._..._..........,............._.................._................»...........»........_..
$283.58 ($300.59) per month
_..._........_.._..._...........�._.»_.»._.......,,..........._.._..._.._.....»._»_._... _.,...»M.1__...._.......
Base Charge
j 8" Meter Size
$567.16 ($601.19) per month
.............................. ... ......... ......... _.................. .......... ......
Base Charge
............................................ ..........._...................................v......................
10" Meter Size
..............................................»......».................................
$804.25 ($852.51) per month
.... ....... .......... _ ....... ........ ........ »....,_... »...,.._._.
Base Charge
»..»..»....._ _wM...M.........»»..._....»».,,._....» .__».,...,, _..,._......w . »_... ......_..._.............
12" Meter Size
_, ._.......» ..,.._., _..»,,,.,,....,,....w».. »..�_._..,.,.,...._.»_.,............v....»_......,._..»..
$1,13 8.97 ($19207.31) per month.........
Over Base — 3,334 to 1107
r
.». ._. _..w..».» ..
$2.73 ($2.89) per 1,000 gallons
gallons
......... ...... .................................... ....... ........
Over Base —Greater than 11,667
$4.78 ($5.07) per 1,000 gallons
Gallons
ti ;
f
.......................................................................................................................................................................i�....................................................................................................................................................................t..............................................................................................................................................................�
Standby
:......._........:..............................: ....................r..........:._..........................._.................
3
= Average
$16.89 ($17.90) per account
Water Test . . ..............
....... Fee set ........ , ...... 1.11 ......by MN State...... ..... . ... Health Dept
.53 per mont. ... . ............ .....h
Commercial Sanitary Sewer Per Month:
... ......... ......... ......... .........
Commercial Usage
» ...
......... ................ ......... ........ ......... ......
...._ .....
..
$4.05 ($4.66) per 1,000 gallons
Mobile Home/Apartment artment p
......... ........ ......... .................. ......... ........................ .........
__.... _.._.__,.............
$26.16 ($26.95) per unit
Commercial Surface Water Per
Month:
. ......... ........................................... ............................................. _...........................
Apartment
............................................................................................................................................................................................................................
; ........ ......... ......... . ......... ......... ....... .._..
......._........................ ................ ..w........._..._.................... ...
$25.3 5 ($26.11)
Industrial and/or Commercial
..................._........................................ ....-............._....._................................
....._....:........_.. _.........:....».......... M.. _ .... _::. _. _ . w ...� _.....................m........................................._.._._._.w.._._..___w
$3 9.5 8 ($40.77) per acre
_.._..__._ ......__._..._.....__.............._._............
Undeveloped Land
t
$4.66 ($4.80) per acre
Per Residential Parcel (with Annual $32.00 40.65
curbside regy lin 3
_.... ..... ._...,_...). ;
Per Residential Parcel without s
curbside rec clip New $1.70
2 Annual E
................... ..... \ ..................... e ....................................... ...
.
Recycling Bin One bin per resident provided $6.00 per bin
free of charge
............................................................................................................................................................................................................................. g..................................................................................................................................................................................................................................................................
Page 10 of 10