Prepared By: Kris Giga, Civil Engineer `
�
Michelle Olson � Council Meeting Date: January 11, 2010
Parks and Recreation Manager ?
County Road E/T.H. 51 Bridge- Municipal Agreement Update.
Budgeted Amount: Actual Amount: Funding Source:
NA NA NA
Recommendation:
1. Motion to withdraw the City's application from the Municipal Agreement Program
and direct staff to continue to work with Mn/DOT to pursue a bridge improvement
proj ect that includes pedestrian accommodations.
.................................................................................................................................................................................................................................�---------............,.__.._.---.__.._.__.._..___.___...------..-----......................______.__..._.-----.....__.._.............,........_._........_......_................__---_-_--.--......_,....-.-_ - -
. .. .............................................................
Supportin� Documents:
1. Memo from City staff dated January 11, 2010.
_ _ _
_. _ _
�.� EN HILLS
MEMORANDUM
DATE : January 11, 2010
TO: Honorable Mayor and City Council Members
Sue Iverson, Acting City Administrator
FROM: Kristine Giga, Civil Engineer
Michelle Olson, Parks and Recreation Manager
SUBJECT: County Road E/TH 51 Bridge- Municipal Agreement Program Update
Back�round
At the August 31, 2009 Regular City Council Meeting, staff received direction from the
City Council to prepare an application for funding through Mn/DOT's 2009 Municipal
Agreement Program for modifications to the existing County Road E bridge over Snelling
Avenue (TH51). The Municipal Agreement Program Application was submitted on
September 28, 2009. Staff received comments on this application on December 15, 2009.
The comments received identified that Mn/DOT is considering this bridge for an
improvement project in FY 2015. Because the bridge is considered functionally obsolete,
which means the geometric layout does not meet current standards, this bridge would be
reconstructed.
City staff and Kimley-Horn representatives met with Mn/DOT on December 29, 2009 to
discuss the comments and options on moving forward with improvements to this bridge.
This bridge had not been programmed or identified for replacement in the next five to ten
years. However, the City's continued efforts in seeking assistance to improve the existing
conditions of the bridge have highlighted the existing bridge deficiencies, causing the
Mn/DOT bridge maintenance office to move up improvements to this bridge to FY 2015.
The comments received from Mn/DOT bridge maintenance staff indicated that the scope of
our proj ect would need to be modi� ed due to the condition of the existing concrete. These
modifications anticipate the need for additional deck repairs once the bridge overlay is
removed. In 1993, when Mn/DOT placed the current overlay, they encountered some deck
deterioration. At that time, they decided not to make repairs to the structural bridge deck
and simply cover the deck with an overlay. The scope of our current proj ect anticipated
doing the same, removing the overlay and replacing it with modifications to the sidewalks.
Mn/DOT recommends the City add the repair of the structural deck to our proj ect. This
would include adding quantities for partial and full deck thickness repair in the event that
we encounter deteriorated areas once the current overlay is removed.
I IMetro-inet. us l ardenhills IPR�PW1Parks IMemos I Council Memos 1011110 Municipal Ag�eement Update. doc
�
In 1993, approximately 1 S percent of the structural deck area was deteriorated. That area
of deterioration has likely increased since 1993, however it is very difficult to diagnose the
amount of deck repairs that are necessary until the current overlay is removed. Adding
these deck repairs to the proposed improvements, would increase the overall cost of the
proj ect around $100,000. Since the potential redeck of the bridge could trigger other
necessary repairs, the City could be liable for additional repair costs that are not included in
the municipal agreement funding.
Mn/DOT representatives present at the December 29, 2009 meeting stated that the City's
proposed improvements to the existing bridge would delay any upcoming bridge
improvement proj ects to an undetermined date in the future.
Discussion
Staff has identified the following options for the City Council's consideration about future
improvements to the County Road E bridge over T.H. 51. Staff is requesting action on
Option 1 only.
OPTION 1: Continue to pursue the Municipal Agreement by adjusting the scope of
the project in response to the comments provided by Mn/DOT.
PROS CONS
The proj ect could take place in 2010 (State FY When the improvements take place, if other
2011). deficiencies are identified, the City will be liable
for the additional costs.
The money awarded through this agreement
does not include approach sidewalks or an
attached sidewalk from Snelling Avenue.
The sidewalk will be a substandard design (5
feet) and will not meet multi-use trail design
standards .
This is a temporary fix that will delay future
replacement of the bridge.
OPTION 2: Pursue the stand alone bridge option if the STP Federal Application is
successful. (Met Council will be meeting February 17, 2010 to determine which
proj ects will receive funding.)
PROS CONS
Could be constructed in 2012 (Federal FY 2013) The City must wait until 2012.
Meets all shared use pathway standards. Local costs- federal grants have a 20% local
match funding requirement
Will not affect future plans for bridge The City will be responsible for the maintenance
replacement. and upkeep of a stand-alone bridge.
Includes connecting path to Snelling Avenue. -
I IMet�o-inet. us l ardenhills IPR�PWIParks IMemos I Council Memos 1011110 Municipal Agreement Update. doc
OPTION 3: MnDOT rebuilds bridge in FY 2015.
PROS CONS
New bridge with a multi use pathway and The City must wait until FY 2015.
upgraded entrance/exit ramps
Pathway on bridge will meet current pathway The City will likely incur some costs for
design standards. approach work and trail construction costs on
either side of the bridge.
OPTION 4: City/ County work cooperatively to advance construct the bridge as early
as 2012 or 2013.
PROS CONS
New bridge with a multi use pathway and City/ County must front the money for the
upgraded entrance/exit ramps proj ect.
Pathway on bridge will meet current pathway The City/ County must wait for Mn/DOT
design standards. reimbursement.
If the City is successful in its STP application, a
modification to the application could be
requested to apply the funds to an attached
bridge versus a standalone bridge.
Construction will become more definite with
local (City/County) support and contributions to
the proj ect.
Mn/DOT representative Marc Goess will be present at the City Council meeting to answer
questlons.
Council Action Requested
Motion to withdraw the City's application from the Municipal Agreement Program and
dlrect staff to continue to work with Mn/DOT to pursue a bridge improvement proj ect that
lncludes pedestrian accomodations.