Loading...
HomeMy WebLinkAbout7C, Resolution 2010-010 Ordering Advertisement for 2010 PMP- ��S. I EN H LLS � Re uest for Council A i n : q ct o Prepared By: Kristine Giga, Civil Engineer Council Meeting Date: March 8, 2010 Adopt Resolution 2010-010 Approving Plans and Specifications and Ordering advertisement for Bid for the 2010 Pavement Management Program Budgeted Amount: Estimated Actual Amount: Funding Source: $1,102,000 $1,196,768 PIR, Enterprise Funds, Special Assessments Recommendation: 1. Adopt Resolution 2010-010: Approving plans and specifications and ordering advertisement for bid for the 2010 Pavement Management Program. ..........................................� ._.........__._..__............._..---------.--................._..---._._.........-----------------....._........_.____.---._.._............_ � ........................................................................................................................................................�------.........__..----........._._..------,--........-------.........__....-----,--........_._.___...._......_.....-�------._._._.._.........__..._.._.....__ Supporting Documents: 1. Memorandum from City Staff dated March 8, 2010. 2. Resolution 2010-010. ��. EN HILLS MEMORANDUM DATE : March 8, 2010 TO: Honorable Mayor and City Council Members Sue Iverson, Acting City Administrator FROM: Kristine Giga, Civil Engineer SUBJECT: 2010 Pavement Management Program (PMP)- Approving Plans and Specifications and Ordering Advertisement for Bid Back�round On January 11, 2010, a public improvement hearing was held for the 2010 PMP proj ect. Following the hearing, the City Council ordered the improvement and preparation of plans and specifications of the proposed proj ect. The next step in the process is for the City Council to approve plans and specifications and authorize the advertisement for bids. Discussion State statute requires a City Council resolution approving plans and specifications and ordering the advertisement for bids for all public improvements to be assessed. Since a portion of the costs for the proposed proj ect will be assessed to benefiting properties, the adoption of this resolution is required. Street Improvements The following table summarizes existing and proposed street widths for each street proposed for reconstruction. Concrete curb and gutter is proposed on all streets to be reconstructed to provide support to the edge of the bituminous roadway and to aid in stormwater management. Streets proposed for mill and overlay, Janet Court, Katie Lane, and Katie Court, will have no change to the street width. Existing curb and gutter will remain in place, with the exception of spot repairs to replace damaged or sunken curb. City Council Meeting \�1Vle�ro-inet.us\ardenhills�Admin\Council�Agendas & Packet Information\2010\3-8-10 Regular�Packet Information\7C 3-8- 10Memo_2010PMP_ApprovePlans Specs-OrderAdForB id. doc Page 1 of 4 Existing Street Width Proposed Street Location (Pavement Edge to Width (Face of Curb Pavement Ed e to Face of Curb alentine Avenue 24-25 feet 24 feet alentine Crest Road 28 feet 28 feet alentine Court 24 feet 24 feet Utilit_y Improvements Watermain Watermain replacement is proposed on Valentine Court and on Valentine Avenue from Valentine Court to Old Highway 10. There have been several watermain breaks in this area in recent years; the pipe will be replaced with plastic pipe, which will perform better than iron pipe in the soils in the area. Replacement of hydrants and gate valves is also recommended in the Valentine neighborhood. No watermain improvements are proposed on Janet Court, Katie Lane or Katie Court. S anitary S ewer . Since the public hearing, staff has identified several segments of the sanitary sewer main that need replacement. Sanitary sewer main along Valentine Court and Valentine Avenue from Lake Valentine Road to Valentine Court have sags and offset j oints, which cannot be repaired with a sewer lining proj ect. These segments will be replace with plastic pipe, which will perform better than the existing clay pipe. Two spot repairs will also be made on Valentine Crest Avenue. Manholes with structural deficiencies will be rehabilitated in an effort to reduce inflow and infiltration. Chimney seals and solid manhole covers will also be placed on all sanitary sewer manholes. Sanitary Sewer services Many of the residents in the Valentine neighborhood have indicated that they have had issues with roots in their sanitary sewer service lines. The service is the property owner's responsibility from the main to the house. A private sewer service replacement item has been included for this proj ect. This work would be performed only if requested and paid for by the property owner. Language is included in the contract documents that the Contractor shall provide unit prices for private work, and that any private work will be done as a contract between the Contractor and the private property owner. Providing this option will maintain the integrity of the newly reconstructed street, as well as save the property owner road restoration costs in the future. Storm Sewer The existing storm sewer system will be improved and expanded throughout the neighborhood. Best management practices, such as rain gardens, in�ltration trenches, biofiltration basins, and other features will also be incorporated into the proj ect in order to meet the Rice Creek Watershed District's water quality requirements. City Council Meeting \�1Vletro-inet.us\ardenhills�Admin\Council�Agendas & Packet Information\2010\3-8-10 Regular�Packet Information\7C 3-8- 10Memo_2010PMP_ApprovePlansSpecs-OrderAdForBid.doc Page 2 of 4 Financial Implications The estimated total proj ect cost for the improvements is $1,196,768, including contingency, engineering and overhead fees as outlined in the Assessment Policy. The City's portion of the project costs are currently budgeted from the PIR and Utility Enterprise Funds (sanitary sewer, surface water management and watermain funds). A proj ect cost summary is listed in the table below. The budgeted amount includes total costs programmed in years 2009, 2010 and 2011. Roadway costs include a 37% overhead; utility costs include 30% overhead. Project Cost Summary Fund Budgeted Engineer's Estimate Watermain Enterprise Utility $ 75,000 $ 148,392 Sanitary Sewer Enterprise Utility $ 20,000 $ 139,562 Surface Water Management Utility $ 175,000 $ 167,557 PIR/Assessments $ 532,000 $ 741,257 State Aid (street and storm sewer) $ 300,000 $ 0 Total $ 1,102,000 $ 1,196,769 Amount received from assessments $ 370,629 Amount funded by the City $ 826,139 The watermain and sanitary sewer improvements identified in the feasibility report have a greater estimated cost than what was included in the budget. The City will also need to utilize more funds from the PIR for the roadway improvements, since State Aid funds will not be used on this proj ect. The finance director has indicated that these funds currently have sufficient balances to accommodate the increase. Assessments As detailed in the feasibility report, two preliminary assessment rates have been established, for reconstruction and for mill and overlay. The table below lists the estimated assessment rate per residential equivalent units (REU) based on the latest engineer's estimate. City Council Meeting \�1Vle�ro-inet.us\ardenhills�Admin\Council�Agendas & Packet Information\2010\3-8-10 Regular�Packet Information\7C 3-8- l OMemo_201 OPMP_ApprovePlansSpecs-OrderAdForBid.doc Page 3 of 4 Type of Improvement Number of REUs Estimated Assessment Rate Reconstruction 31 $ 8, 7 8 6 Mill and Overlay 44 $2,23 3 Council Action Requested Staff recommends the adoption of Resolution 2010-010: Approving plans and specifications and ordering advertisement for bid for the 2010 Pavement Management Program. City Council Meeting \�1Vletro-inet.us\ardenhills�Admin\Council�Agendas & Packet Information\2010\3-8-10 Regular�.Packet Information\7C 3-8- 1 OMemo_201 OPMP_ApprovePlansSpecs-OrderAdForBid.doc Page 4 of 4 � EN HILLS CITY OF ARDEN HILLS COUNTY OF R.AMSEY STATE OF MINNESOTA RESOLUTION NO. 2010-010 A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE 2010 PAVEMENT MANAGEMENT PRO GRAM WHEREAS, pursuant to a resolution passed by the City Council on January 1 l, 2010, the Consulting Engineer, WSB & Associates, Inc., has prepared plans and specifications for the improvement of the following streets: Valentine Crest Road, from Valentine Avenue to cul de sac, Valentine Avenue, from Lake Valentine Road to Old Highway 10, Valentine Court, from Valentine Avenue to cul de sac, Janet Court, from Lake Valentine Road to cul de sac, Katie Lane, from Cleveland Avenue to 1272 feet south, Katie Court, from Katie Lane to cul de sac, and has presented such plans and specifications to the City Council for approval; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS, MINNESOTA: 1. Such plans and specifications, a copy of which is attached hereto, and made a part hereof, are hereby approved. 2. The City Administrator shall prepare and cause to be inserted in the Bulletin, the official newspaper, and in the Const�uction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published as required by law, shall specify the work to be done, shall state the date and time that the bids will be received by the City Administrator and City Engineer at which time they will be publicly opened in the Arden Hills City Hall by the City Engineer, will then be tabulated, and will subsequently be considered by the Council. No bids will be considered unless sealed and filed with the Administrator and accompanied by a cash deposit, certified check or bid bond payable to the City of Arden Hills for ten percent (10%) of the amount of such bid. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 8th DAY OF MARCH, 2010. Stanley D. Harpstead, Mayor ATTEST: Susan K. Iverson, Acting City Administrator