HomeMy WebLinkAbout7A, Cummings Park Irrigation Project Award-
�;.� EN HILLS
Re uest for Council Action
q
Prepared By: Michelle Olson,
Parks & Recreation Manager Council Meeting Date: March 29, 2010
Cummings Park Irrigati�n Proj ect Award
Budgeted Amount: Actual Amount: Funding Source:
$17,000 $16,333.75 Park Fund
Recommendation:
1. Motion to award the Cummings Park Irrigation Installment to Village Plumbing,
Inc. in the amount of $1,616.00 for the plumbing installation; Anderson Irrigation,
Inc. in the amount of $13,867.75 for th� irrigation installation; plus an additional
amount of $850.00 for a City-purchased water meter. Total project cost not to
exceed $16,333.75
.._ ................................................................:...............................................................................................................................................................�---------..._...._..........................._._.___..___.--_---......................................._...._..-------.------.---..._................._.._.._--�--- ---�
. .....................................................................................................
Supporting Documents:
1. See attached memo from Michelle Olson, Parks and Recreation Manager.
2. C.I.P Detail
_
__ _ _
_ _
_ _
_ _ _ _ _
_ _ _ _...
_ _
_ __ _ _
__... .. . _. .
_ . . _ _.
_ _ _
�� EN I-iILLS
MEMORANDUM
DATE: March 29, 2010
TO: Honorable Mayor and City Council Members
Sue Iverson, Acting City Administrator
FI�OIVI� 1Vlichelle Olson,l'arks and 1Zecreation Manager
SUBJECT: Cummings Park Irrigation Proj ect Award
Background
At the November 16, 2009 City Council Work Session, the Council considered a
recommendation from the Parks, Trails and Recreation Committee (PTRC) to reconsider
including the addition of irrigation at Cummings Park in 2010. The Council consensus
was to include ir.�gation in the 2010 CIP (Attached for review).
Since that time, staff has been working with Minnesota Irrigation Distribution Center to
assemble plans and specifications for the irrigation system. The initial estimate in the 2010
Capital Improvement Plan was based on watering the two sports fields exclusively. The
PTRC and Council both stated they would like to see areas around the pavilion and general
park areas included. As a result of these discussions, the proj ect scope was increased to
include the areas surrounding the pavilion and general park areas. The irrigation
installation and the plumbing for this proj ect have been separated in order to receive the
best possible cost estimate.
Four quotes have been acquired for the irrigation installation at Cummings Park and the
following are the results:
Com an TOTAL
Anderson Irrigation Inc. $13,867.75
Automatic Irrigation, Inc. $14,650.00
Albrecht Irrigation $14,894.00
Diers Irrigation $18,975.00
Four plumbing contractors were asked to provide quotes for the plumbing hook up for the
irrigat�on p�oj ect. Tvvo quotes were received by the stated deadline and the following are
the results :
I 11Vletro-inet. us I ccr°denhills IPR�PWIParks 11Vlemos I Council Memos 1032910 Cummings Park Irrigation. doc
2
Com an TOTAL
Village Plumbing, Inc. $1,616.00
Signature Mechanical, Inc. $2,100.00
Roseville Plumbing & Heating Inc. $3,448.00
Bonfe Did not submit
The combined total of the two lowest bids is $15,483.75. A new water meter will also be
needed to complete this project. The cost of the new meter will add an additional $850.00
to the project. Therefore, the overall project cost is estimated to be $16,333.75. Staff
checked references on the top bidders for both the irrigation installation and the plumbing.
Anderson Irrigation has extensive experience installing irrigation systems on sports � elds.
Cities or agencies that Anderson Irrigation has worked with: Anoka Hennepin School
District, City of Blaine, City of Little Canada, City of Otsego, City of Ramsey and the City
of Roseville. Village Plumbing, Inc. has worked with several surrounding municipalities
such as the City of Shoreview, City of Little Canada and the City of Roseville.
The Cummings Park fields serve as one of the two main sport fields in the City. The fields
are utilized three seasons of the year by City programs and association programs. The
fields were in poor shape last spring/summer and without irrigation, staff found it difficult
to fix bare areas and holes. In 2001 when the pavilion was built, the City included
installation of a pipe for the possibility of a future irrigation system. This field is heavily
used and the result is a poor playing field. The irrigation system will help keep the fields in
playable condition. Healthy grass is an essential element of any outdoor sport field. Thick,
green, lush turf provides a safer surface for athletes, reducing the amount of injuries
experienced on the playing field. It is also aesthetically pleasing. Water is a necessary
component to keep turf in healthy condition. It is recommended that turf receive 1" of
water per week. Irrigation systems are typically installed to supplement rain water to
provide the needed 1" of water per week. As sport fields develop bare spots in high traffic
areas such as goal mouths, an irrigation system can assist in keeping newly seeded areas
moist to help promote seed germination and long term establishment. Dormant and dry turf
grass is more susceptible to long term damage due to the aggressive heavy traffic on sport
fields.
A soil sample has been collected from Cummings Park and sent to the University of
Minnesota for testing. The results of this soil sample will help determine the required
nutrient needs of the soil. This will demonstrate how much fertilizer, and what type of
fertilizer these fields need. The soil on these fields is primarily a heavy clay content. This
type of soil vvorks v�ell with irrigation systems with the most effective method being to
apply water slower over longer durations. Fertilization, aeration and irrigation work
together to provide q�.ality turf. We will be reviewing our current maintenance practices
for this field, in order to maximize the benefits of irrigation.
Cost Benefit Analysis
The spring and summer of 2009, city staff put together a make shift sprinkler system on
occasions at Cummings Park when we had time. This probably occurred once or twice a
�nonth. Staff saw a drastic improvement in bare and damaged areas on the field after this
I IMet�o-anet. us l ardenhills IPR�PWIParks 11Vlemos I Council Memos 1032910 Cummings Park Irrigation. doc
3
practice began. However, due to the amount of time it took staff to set up and take down
this system it was not used regularly. Without an automatic irrigation system, to apply the
needed amount of water (1 inch recommended per week) at Cummings Park with our
Public Works Staff regularly setting up and taking down this sprinkler system, it is
estimated that it would take the following amount of labor (weather permitting):
• 6 hours per week x 24 weeks = 144 hours per year (May-Oct)
• 144 hours per year x$20.00 =$2,880 per year
The set up and take down for this operation could be completed by seasonal staff.
However, the time frame that watering would occur (Mid May through October) is longer
than the City typically has seasonal staff employed. Therefore, an average hourly wage of
$20.00 per hour was used in this analysis.
The cost of the proposed automatic irrigation system is $16,333.75. Therefore, it would
take approxim.ately 6 years %r the City to recover this cost. This does not take into effect
the other tasks that this type of operation would take our staff away from. In addition, this
type of watering takes place during the main portion of the day which is not the ideal time
of day to water. Ideally, overnight or early morning watering is best. If the fields are
watered during the main portion of the business hours to allow for our staff to do the
watering, the fields would be unusable a maj ority of the day.
Budget
The Special 1Zevenue Park Fund includes $17,000 for this proj ect.
Recommendation
Staff recommends a motion to award the Cummings Park Irrigation Installment to Village
Plumbing, Inc. in the amount of $1,616.00 for the plumbing installation, Anderson
Irrigation, Inc. in the amount of $13,867.75 for the irrigation installation plus an additional
amount of $850.00 for a City purchased water meter for a total project cost not to exceed
$16,333.75.
Requested Council Motion
Motion to award the Cummings Park Irrigation Installment to Village Plumbing, Inc. in the
amount of $1,616.00 for the plumbing installation, Anderson Irrigation, Inc. in the amount
of $13,867.75 for the irrigation installation plus an additional amount of $850.00 for a City
purchased water meter for a total project cost not to exceed $16,333.75.
I IMet�o-inet. us l ardenhills IPR&PWIParks IMemos I Council Memos 1032910 Cummings Park Irrigation. doc
F�nd�ng Sources 2U10 2011 �012 2013 2014 Totai
Speciat Revenue Park Func! 17,Q4Q �7,��
TOtSI 17,000 �7,000
�a�ital Improvement Plan 201 o r�Yu 2414
City af �►rden �]Ei:t1s,1Vli�nesota
�peratioa� Ianpa,ct//Other _ _
�rr�prov�r�en� �f t��s f e�d wili deerease the amount o#� labor devoted for rnaintenance and fie�d repair casts_ This feld wiil be better ua�i and
ab�e to be used rr}ore often wit� less impact on the grass. Estimated savrngs is $ I,504 er ear_ � �
P Y
Ope�-ating Budget Impact Z0� 0 2011 2012 2013 2014 'I'otal
�lnnuat Maintenance Gharge -i,500 -�,500 -�,500 -1,500 -1,500 -7,540
TOtBI -i,500 •'i,500 •�,50Q -1,500 -1,50p -7,500
Prod�eed Usang the �'lan-It C'crJ.�itAl plcznning Sofhvare T�I�ednes , 11�avember 04 20
3 0 � , 09
�:xpend�tures 2010 2011 2012 20�3 2014 Totat
�onstruction/Mainter�ance 17,UQ0 17,000
�o�� 9 7,000 17,000