Re uest for Council Action
q
......._.._.........._........_.........�............_W.._ ..................................��.._.........................._...........�.........................__............................_........................�....w.........._._......._...W._w.........._........_....�_...... ........................��..............W...............__............._........._..._......._......_......�...................._...........................�..........._.._..._.....................___......_..�.....�....�.....�....................._............................................�....._..._...
Prepared By: James Lehnhoff,
Community Development Director Council Meetin Date: Jul 26 2010
Michelle Olson, Parks & Recreation g y'
Mana er
Lexington Avenue Sidewalk Projects
Budgeted Amount: Actual Amount: Funding Source:
Project A: $63,400 TBD PIR Fund
Project B: $54,000
Recommendation:
Motion to authorize Staff to contract with MFRA, Inc. to prepare iinal plans and specifications
as well as provide construction services to construct a new sidewalk between Grey Fox Road and
CP Railroad crossing along Lexington Avenue and to reconstruct the existing trail between
Cummings Park Drive and County Road F along Lexington Avenue for an amount not to exceed
$16,970.
Supporting Documents:
• Memorandum dated July 2d, 2010, from James Lehnhoff and Michelle Olson
• Map of the Proposed Lexington Avenue Trail (Railroad tracks to Grey Fox Road)
• Map of the Proposed Lexington Avenue Trail Reconstruction (County Road F to Cummings
Park Drive)
EN HILLS
MEMORANDUM
DATE: July 26, 2010
TO: Mayor & City Council
Patrick Klaers, City Administrator
FROM: Kristine Giga, Civil Engineer
Michelle Olson, Parks and Recreation Manager/Acting Public Works Director
SUBJECT: Lexington Avenue Sidewalk Projects:
Project A— New Lexington Avenue Sidewalk
Project B— Reconstruct Existing Lexington Avenue Trail
Action Req uest
Motion to authorize Staff to contract with MFRA, Inc. to prepare final plans and specifications
as well as provide construction services to construct a new sidewalk between Grey Fox Road and
CP Railroad crossing along Lexington Avenue and to reconstruct the existing trail between
Cummings Park Drive and County Road F along Lexington Avenue for an amount not to exceed
$16,970.
Back�round
The 2010-2014 Arden Hills Capital Improvement Plan (CIP) proposed a new sidewalk and a trail
reconstruction along Lexington Avenue in 2010 (see attached map). Both projects work to
implement the City's 2030 Comprehensive Plan. A request for quotes was issued for projects to
complete plans, specifications, and provide construction monitoring for both projects. The costs
for the two projects would be tracked separately, and one project can proceed without the other if
needed.
Project A: New Sidewalk Const�uction
The CIP proposed to construct an approximately 9G0 foot long, eight foot wide concrete
sidewalk along the west side of Lexington Avenue from the Canadian Pacific Railroad
crossing to the traffic signal at Grey Fox Road. The proposed trail would be adjacent to
City of A�den Hills
City Council Meeting fo� July 26, 201 D
I tAhdocs11ah1AHdatalPlanninglCommunity DevelopmentlLexington Avenue Sidewalk1072610 - Regular Meeting - CC Memo - Lexington Avenue
Sidewalk.doc
Page 1 of 3
two properties: the Shannon Square Shoppes and the Shannon Square Cub Foods. As
previously discussed, Inland Properties, the owner of both properties, has agreed to fund
up to half the cost of the project via a special assessment pending the results of the final
project cost estimate. The City Council approved the special assessment waiver at their
June 14, 2010, meeting, and Inland subsequently approved the special assessment waiver.
The 2009 cost estimate was approximately $63,000, not including engineering. Inland
Properties retains the option to review the estimated construction cost and final bid to
determine if they will accept the project. If Inland withdraws from the project, they are
not obligated to reimburse the City for expenses.
P�oject B: T�ail Reconst�uction
The 2010 CIP proposed to reconstruct the existing eight foot wide, 1870 foot long
bituminous trail that is located between Cummings Park Drive and County Road F along
Lexington Avenue. The trail is in poor condition with significant cracking. The 2009
estimated cost was $50,000, not including engineering.
Discussion
Proposals were submitted from four firms in the municipal engineering pool: Bolton & Menk,
Inc., Kimley-Horn and Associates, Inc., MFRA, In., and WSB and Associates, Inc. This contract
will be a not to exceed cost based on actual hours spent on the project, with an optional
additional cost to present the study results at a city meeting. The proposal amounts are listed
below:
Consultant Base Fee Meetin Fee
MFRA $ 16,970 $600
WSB Associates $ 18,100 $112/hour
Kimle Horn $ 27,329 $500
Boiton & Menk $ 29,996 $127/hour
Plans and specifications are being requested for both projects because it may result in cost
savings during construction. The costs for projects A and B will be tracked separately, and only
those costs associated with project A will be applied to the special assessment. Each project can
proceed independently if one of the projects is not selected for construction.
Proiect Timeline
If both the City and Inland Properties approve the final cost of project A, the following steps will
occur:
City of A�den Hills
City Council Meeting for July 26, 2010
11AhdocsllahtAHdatalPlanninglCommunity DevelopmentlLexington Avenue Sidewalk1072610 - Regular Meeting - CC Memo - Lexington Avenue
Sidewalk.doc
Page 2 of 3
1. July 26 -- The City awards contract for plans, specifications, and construction
engineering.
2. Mid-August — Plans and specifications will be completed and the project will be
advertised for bids. Inland Properties will have an opportunity to review the design
and estimated construction costs. Unce the bids are received, the City will provide
Inland Properties with the bid results to determine if the costs are acceptable and they
are still willing to participate in the project.
3. September 13 -- Bid results will be presented to the City Council for potential contract
award.
4. Upon completion of the project, Inland will reimburse the City for one half the
project cost. If Inland chooses to have the cost specially assessed, the special
assessment would be repaid over three years.
If project B is selected for construction, the review and construction timeline would coincide
with project A.
Financial Im plications
The costs to complete the plans, specifications, and construction monitoring will be paid for out
of the Permanent Improvement Revolving Fund (PIR). If Project A, the new Lexington Avenue
Trail, moves forward, the City may be reimbursed for up to half the cost related to Project A
through the special assessment that the property owner has agreed to.
Recommendation
Staff recommends contracting with MFR.A, Inc. to prepare final plans and specifications as well
as provide construction services to construct a new sidewalk between Grey Fox Road and CP
Railroad crossing along Lexington Avenue and to reconstruct the existing trail between
Cummings Park Drive and County Road F along Lexington Avenue for an amount not to exceed
$16,970.