Loading...
HomeMy WebLinkAbout2C, Recycling Services Contract EN ILLS MEMORANDUM DATE: September 20,2010 Item 2.0 TO: Mayor& City Council FROM: Meagan Beekman, City Planner& Recycling Coordinator SUBJECT: Residential Curbside Recycling—Eureka Contract Extension Requested Action Discuss the Eureka Recycling contract and provide Staff with feedback on whether to proceed with extending the existing contract or begin the process of soliciting proposals for a new residential curbside recycling service provider. Background, The City has contracted with Eureka Recycling for curbside residential recycling services since March L 2008. The contract provides curbside residential recycling services to most residences in the City (Hunter Park condos, Parkshore Apartments, Cottage Villas, and Arden Manor contract for their own recycling services). The current contract is set to expire on March 1, 2011. The contract allows for two one-year renewal options provided that both the City and Eureka agree to the renewal. The current contract and first amendment are included as Attachment A. The City currently uses two-stream recycling with Eureka Recycling (sometimes referred to as dual stream or two-sort recycling). Two-stream recycling requires residents to separate mixed paper (newspaper,a cardboard, office paper, mail, phone books, milk and juice cartons, pop and beer boxes, etc) from mixed rigids (cans, glass, and plastic). Eureka Recycling also allows residents to recycle clothes and linens. In addition to these items, Eureka is working on expanding the items that they collect and is hoping to add pizza boxes beginning next year. Post consumer recycling markets plummeted in October 2008, and hit their lowest point in January2009. The drop in prices significantly impacted the recycling market and has caused the p p g cost of recycling services to rise dramatically. Due to the drop in the market, the City did not Y g receive revenue share for several months. In June 2009, the City and Eureka Recycling amended the original contract due to a disagreement regarding the City's responsibility for processing fees that were not covered by revenue share. The outcome of the amendment restructured the way the City was charged processing fees, expanded the number of items that the City collected g 11 Metro-inetl ardenhillsUdmin l Council Ugendas&Packet Information 1201 M-20-10 Worksession l Packet Information M-20-10-Work Session- Memo-Eureka Recycling Contract Extension.doc Page 1 of 3 revenue share on, and added a provision that clarified what would happen if there was a sudden lack of market demand for a particular recyclable. The contract amendment did not extend Eureka's current contract or impact the renewal options available to the City. The City has received revenue share from Eureka Recycling every month since the contract was amended. Recycling markets have been steadily rising since their low point in January 2009. Revenue Share Currently the City pays Eureka $3.06 per household to collect recycling materials. Eureka, in turn, processes the materials and provides back to the City 50 percent of their after cost revenue -= for most materials. The revenue share is used to buy down the cost of the recycling service and directly lowers the cost per resident in the City. The cost of the recycling program is charged back to the residents through their property tax statements. This means that the more the residents of Arden Hills recycle the more revenue is shared with the City, which directly lowers the cost of the service for the residents. - In March 2008 the City began its contract with Eureka. In nine months the City received $16,832.72 in revenue share, which brought the cost of the Eureka Recycling service down to $2.00 per household. In 2009, because of the situation with the recycling markets, the City did not receive revenue share for the first six months. By year-end the City had received $3,215.35 in revenue share, which brought the cost of the recycling service down to $2.96 per household. Eureka did not increase the cost of service from 2009 to 2010, and so the base cost per household remained at $3.06. As of July of this year, the City has received $11,042.46 in revenue share from Eureka. This amount has brought down the cost per household to $2.41. This number is anticipated to decrease by the end of the year as revenue share continues to increase per tonnage month after month. Eureka Recycling The City's contract with Eureka Recycling has also been environmentally beneficial to the City. Eureka Recycling takes more types of material than any other service provider in the metro area, and continues to work to expand the types of items that they collect. Eureka Recycling has provided unique educational efforts including: • Participating in the City's Celebrate Arden Hills with a community booth • An annual Guide to Recycling mailed to residents • Educational tagging to inform residents why a particular item was not picked up • An information hotline serviced by environmental educators to answer resident's questions and assist in finding expanded opportunities to recycle • Annual reports detailing the City's recycling efforts • Trucks run on a 20% biodiesel blend that cuts emissions of particulate matter, hydrocarbons and carbon monoxide. Eureka Recycling also continues to advance their mission of zero waste. They are currently Y g working Y with the City of St. Paul on a five neighborhood study dealing with the feasibility of 1 tMetro-inetlardenhillsUdminlCouncilUgendas&Packet Information 1201M-20-10 WorksessionlPacket Information M-20-1 0-Work Session- Memo-Eureka Recycling Contract Extension.doc Page 2 of 3 curbside collection of compostable materials. The purpose of the study is to discover ways through which Eureka may be able to collect organic materials for compost in the future. Contract Renewal Staff has met with Eureka Recycling and discussed options pertaining to the renewal of the existing contract. Eureka Recycling has submitted a letter (Attachment B) summarizing recycling statistics specific to Arden Hills. Their experience has been very positive in the City and they have found that recycling rates, as well as quality of materials collected, are extremely high compared with other communities they serve. Eureka is interested in continuing their contract with the City. The City has the option of renewing the contract for either one or both one-year options at this time. Additionally, Eureka Recycling has stated that they would be open to amending the contract to extend it for an additional three years beginning in March of 2011. The City also has the option of allowing the Eureka Recycling contract to expire. If the Council chooses this - option, Staff would begin the process of soliciting proposals to continue the service beyond March 1, 2011. Recommendation In preparation for this discussion Staff contacted the recycling coordinator for the City of Roseville to discuss the cost of recycling service providers. Roseville currently contracts with Eureka Recycling and is in the process of extending their contract as well. As part of that process Roseville surveyed the price of other recycling service providers. In talking with Roseville Staff they had found that the Eureka Recycling contract was very favorable and that the cost of recycling services had increased dramatically since their last RFP three years ago. They attribute the increase in cost to the destabilization of the market in 2008. Additionally, they noted that most new recycling service contracts now include fuel surcharges, which are not included in the City's existing contract. While the Arden Hills and Roseville contracts with Eureka are structured slightly differently, Staff believes that our current contract is very favorable compared with the cost of service from other providers. The information collected by the City of Roseville had not yet been compiled as of the printing of this memo; however, Staff will provide that information when it is available. At this time Staff is recommending the City Council approve both one-year extensions to the current Eureka Recycling contract. Additionally, Staff would be supportive of amending the contract to extend it for three years beginning in March 2011, if the Council chooses to do so. Attachments A. Eureka Recycling Contract and Amendment No. 1 B. Letter from Eureka Recycling dated July 30, 2010 IlMetro-inetlardenhillsUdminlCouncil)Agendas&Packet Information1201 M-20-10 WorksessionlPacket Information W9-20-1 0-Work Session- Memo-Eureka Recycling Contract Extension.doc Page 3 of 3 As of 01 i07108 CONTRACT AGREEMENT BETWEEN CITY OF ARDEN HILLS AND EUREKA RECYCLING FOR RECYCLING SERVICES Table of Contents 1. Definitions --------------------------------------••----•-----•---••-•----._...._........._.....----•-•------............__._...3 2. Term of contract--•................................-------------------------....._...-----...-•-•---------------•----------6 3. Annual Work Plan------------------------ ---------------------------------------------------------------------------------6 _. 4. Annual performance review meeting to discuss recommendations for continuous improvement-..........................................................................................................-..._6 5. "Dual Stream, Pius"collection/ processing system .....................................................6 6. Payment Terms------------------------------------------------------------------------------------------------------------7 7_ RFP and Contractor's Proposal------------------------------------------------------------------------------------$ GENERAL REQUIREMENTS FOR ALL COLLECTIONS ..................................................8 8. Missed collections............................................................•--•-------._...._...._..._.....__..__._....8 9. Severe weather----------------------------------------------------------------...._......-------•---------------------..8 10. Collect-ton hours and days............................................................................................8 19. Customer Complaints---------------------------------------------------------------------------------------------------9 12_ City retains right to specify resident preparation instructions .......................................9 13. City shad approve Contractor's public education literature...........................................9 14_ Ownership of Work Product--------.----------------------------•--._........_......._._......----------.----.......9 15_ Weighing of loads..................................-------._........----..._._...-------....------------.....-----------10 16. Monthly and annual reports.......-................................................................................10 17_ Ownership of recyctables-.................................•-------------------......-•-----....._..--------------._10 18_ Scavenging prohibited................................................................................................10 19_ Cleanup of spillage or blowing litter----------------------------------------------------------------------------11 20. Recyclable materials required to be transported to markets; Disposal prohibited_..__.11 21. Designated primary glass market-..............................................................................11 22. Processing facilities must be specified-----------------------------------------------------------------------91 23_ Estimating materials composition as collected...........................................................11 24. Estimating process residuals--------------------------------------------------------------------------------------12 25_ Lack of adequate market demand------------------------------------------------------------------------------12 1 As of 01/07/08 20- Vehicle requirements--------------------------------------------------------------------------------------------------12 27- Personnel Requirements----------------------------------------------------- -----13 28. Licenses and Permits......................................................__--._-_-- 29. Performance monitoring------------------------------.-..-.-.-._._--.._-..__----.__.------._._.._....._....._.......13 30- Liquidated damages...................................................................................................13 31_ Damage to Property--------------------------------------------------------------------------------..__..._.._........14 32- Recycling Collection.............................._........_._..........----.._........_.........__..--...-............. 14 CURBSIDE COLLECTION REQUIREMENTS..................................................................15 33_ weekly Collection.......................................................................................................15 34. Point of c0llection..__...------------------------------------------------------------------------------------------------15 - 35. curbside collection schedule deadline.......................................................................15 36. Procedure for handling non-targeted materials--------..................................................15 37. New Materials to be Added in 2008-------------------------------_.-_._---------------------------------------16 MULTI FAMILY COLLECTION REQUIREMENTS............................................................1 38. contract Amendment for Multi-Family Collect-ton-------------------------------------------------------16 INSURANCE AND OTHER LEGAL REQUIREMENTS ....................................................16 39. Insurance ...-.....-------------------------------------------------------------.._---------------------------------------.._15 40- Transfer of interest---------............................................................................................'17 41_ Non-Assignability and Bankruptcy-------------------------------------------------------------------------------17 42. Dispute resolution and arbitration procedures.............................................._.............18 43. General compliance ---------------------------------------------------------------------------------------------------18 44. Independent contractor ._....___......._--.----.----___---...._................_.--..--..._._._......_....._......_..18 45- Hold harmless -------------------------------------------------...........................................................18 46. Accounting standards-----------......................................................................................18 47. Retention of records---------------------------------------------------------------------------------------------------19 48. Data practices....................................................._......................................................19 49. Inspection of records---------------------------------------------------------------------------.------. _...19 50. Applicable taw............................................................................................................19 51. contract termination---------------------------------------------------------------------------------------------------19 52- Employee working conditions and contractor's safety procedures............................19 53. contract amendments------------------------------------------------------------------------------------------------20 2 As of o 11o7/fl8 This Agreement is made this 14"'dayof January 2008, between the City of Arden rY tY Hies, 1245 west Highway 96, Arden Hills, Minnesota 55112 (the"City")and The Neighborhood Recycling corporation, Inc. (DIB/A "Eureka Recycling"), a Minnesota non-profit corporation, with its current local place of business at 2828 Kennedy Street NE, Minneapolis, Minnesota 55413 (the "Contractor"). wITNESSETH: WHEREAS, the city supports a comprehensive residential recycling program and desires that high-quality recycling services be available to all its residents; and WHEREAS, the city supports curbside recycling as part of an overall landfill abatement program; and WHEREAS, Ramsey County has funding available for such residential recycling Y 9 services; and WHEREAS, the contractor has submitted a proposal for comprehensive recycling Y 9 services to the City; NOWT THEREFORE, the City and Contractor mutually agree as follows, in consideration of the mutual promises and covenants contained herein: 1. Definitions 1.1 "Aluminum cans" Disposable containers fabricated primarily of aluminum, commonly used for soda, beer, juice,, water or other beverages_ 1.2 "'City's annual recycling public education flyer" The city publishes an annual public education flyer that contains the followingrec clin Y 9 information for city residents: • Annual calendar and map of curbside recycling districts for"single family dwellings" • List of materials to be included for recycling • List of materials excluded that cannot be recycled in the City's program • General information about curbside recycling and multi-family recycling instructions • How to prepare materials. 1.3 "'City's designated contact person" The city has designated the Recycling coordinator as the City's current contact for management and administration of this Agreement- 3 As of 01107/08 1.4 "'City-designated recyclables"or"Recyclable materials"or "Recyclables" The following recyclable materials: aluminum cans; steel cans; milk cartons, aseptic packaging, gable top packages,juice boxes, glass jars and bottles, paper recyclables; plastic bottles; textiles; and corrugated cardboard as defined and further described in the "City's annual recycling public education flyer"!. This list of recyclable materials can be amended through negotiation between the City and its Contractor at any time within the duration of the contract term_ Such negotiations must be reduced to a written amendment to this Agreement and duly executed before it shall go into effect. 1.5 "Collection„ The aggregation and transportation of recyclable materials from the place at which it is generated and includes all activities up to the time when it is delivered to a recycling facility. 1.6 "'Contractor" The City's recycling service Contractor under the new contract beginning operation on March, 1, 2008. 1.7 "Corrugated cardboard" Cardboard material With double wall construction and corrugated separation between walls but not plastic, wax or other coated cardboard_ 1.8 "Curbside recycling bins" Uniform curbside recycling bins (e-g., green, plastic recycling "tubs") supplied by the City in which recyclables can be stored and later placed for curbside collection, as specified by the City_ The recycling containers remain the property of the property owner_ 1.9 "Curbside recycling service" The recycling collection service, together with related public education and other customer services, specified within the September 24, 2007, RFP utilizing curbside recycling bins. Multi-family dwellings may receive curbside recycling service as selected by the City and the Contractor. 1.10 "'Glass jars and bottles" Mass jars, bottles, and containers (lids/caps and pumps removed)that are primarily used for packing and bottling of food and beverages. 1.11 "Market demand" The economic and technical capacity of markets to use recyclable material to make new products. 1.12 "Markets" Any person or company that buys (or charges) for recycling of specified materials and may include, but are not limited to: end-markets, intermediate processors, brokers and other recycling material reclairners. 4 As of 01107/08 1..13 "Multi-family recycling service" Recycling collection service, together with related public education and other customer services, provided to multi-family residents that utilize multi-family recycling containers(i-e.1, carts)and use multi-family recycling stations. In general, multi-family recycling service shall be provided to MFUs with eleven 11 units or more per building. In general, MF dwellings with two (2)to ten (10) units per building shad be provided with curbside collection service utilizing curbside bins. 1.14 ""Non targeted materials" Non-recyclable materials that are not included in the city's recycling program. Examples of typical non-targeted items include(but are not limited to): pumps on plastic bottles, ceramic material in glass streams, pizza cartons in corrugated cardboard streams, etc. 1.15 'Paper" - Paper includes the following: newspapers(including inserts); household office and paper mail; boxboard; old corrugated cardboard; phone books; Kraft bags; pop/beer boxes and magazines/catalogs. No boxboard containers used for food product storage in refrigerators or freezers are included. 1.16 "Plastic bottles" Plastic bottles shaped with a neck. Plastic lids, caps, rings and pumps are not included. Recyclable plastic bottles shall be identified on the bottom with the SPl plastic codes##1 (PETE) and ##2 (HDPE) including bottles containing_ liquor; milk; juice; soft drinks; water; certain foods; soap and cosmetics_ 1.17 "Process residuals" The normal amount of material that can not be economically recycled due to material characteristics such as size, shape, color, cross-material contamination, etc. and must be disposed as mixed municipal solid waste. Process residuals include subcategories of process residuals including but not limited to bulky items, contaminants, sorted tailings, floor sweepings and rejects from specific processing equipment(e.g. materials cleaned from screens, etc). "Process residuals" does not include clean, separated products that are normally processed and prepared for shipment to markets as commodities but are of relatively lour-value because of depressed market demand conditions. 1.18 "Processing" The sorting, volume reduction, baling, containment or other preparation of recyclable materials delivered to the processing center for transportation or marketing purposes. 1.19 "Processing center" A recycling facility in which recyclable materials are processed_ The facility will conform to all applicable rules, regulations and laws of state, local or other jurisdictions_ 1.20 "Steel cams" Disposable containers fabricated primarily of steel or tin used for food and beverages. 5 As of 01/07/08 1.21 "Textiles" Textiles include unwanted but reusable Linens: towels, sheets, blankets, curtains, tablecloths _ and clothes: including belts, coats, hats, gloves, shoes and boots that are clean and free of mold, mildew and excessive stains. Textiles mast be dry_ 1.22 "Work Plan from Contractor" The annual work plan proposal for recycling system improvements submitted from the Contractor and approved by the City. 2, Term of contract The term of the new recycling contract will be a period of three(3) years from March 1, 2008 through March 1, 2011 with two (2)one-year options to renew upon mutual agreement of the _ two parties prior to expiration of the contract . 3. Annual Work Plan The Contractor shall submit an annual work plan proposal no later than February 1 st for the upcoming calendar year to outline Ivey priorities for system improvements. Public education tools shall be itemized and approximate timelines described_ other service improvements may also be included in the work plan_ The City shall review and approve the work plan by no later than March 1 st each year_ The annual work plan shall be incorporated by reference as an amendment to this contract_ 4. Annual performance review meeting to discuss recommendations for continuous improvement Upon receipt of the Contractors annual report, the City shall schedule an annual meeting with the Contractor and a City's committee_ The objectives of this annual meeting will include (but not limited to): i Review Contractor*s annual report, including trends in recovery rate and participation. • Efforts the Contractor has made to expand recyclable markets. • Review Contractor's performance based on feedback from residents to the Environment Committee members and/or City staff. • Review Contractor's recommendations for improvement in the City's recycling program, including enhanced public education and other opportunities as contained within the annual work plan for the upcoming year. • Review City staff recommendations for Contractor's service improvements. • Discuss other opportunities for improvement with the remaining years under the current contract_ 5. "Dual Stream, Plus" collection / processing system Dual stream recyclables collection and processing services shall be the basic sentice system design for this contract_ Under this dual stream design, residents shall continue to be instructed to separate recyclables into two primary groups of materials: (1)all food and beverage containers, including: glass, metal, aseptic, gable-top and plastic bottles; and (2)all 6 As of 01107/08 paper fiber products, including: newspapers, boxboard, magazines, pop/beer boxes, mixed mail, catalogs, phone books, Kraft bags and corrugated cardboard_ In addition, residents may place clean, reusable textiles out separately in plastic bags as outlined in Section 34 of this Agreement. under this "dual stream plus" system design, processing sham also be by the categories as collected: paper separated from containers separated from textiles_ The Contractor shall not make any changes to the dual stream collection or processing 0 systems without written approval of the City_ 6. Payment Terns The Contractor will invoice the City of Arden Hills on a monthly basis and the City will pay a the contractor no later than net 30 days of receipt of the invoice. The billing system will include the following elements: __ 6.1 Compensation to Contractor: City agrees to pay Contractor $2.05 per residential dwelling unit per month in 2008 for weekly curbside collection, processing and marketing of recyclables_ For 2008 the City certifies that there are 2,560 curbside units that will receive service. The City will notify the Contractor by Feb. 1 of each year what the certified number of curbside units will be for the subsequent year. The City agrees that prices for service will increase each year the Consumer Price Index for the tapper Midwest as determined by the Federal Reserve Bank of Minneapolis. The City will notify the Contractor by the last week of December what the compensation rate will be for the subsequent calendar year_ 6.2 Materials Sales Revenue Share A composite credit for the following material sales revenue share: 6.2.1 All Paper Grades Paper prices shall be based on the Official Board Markets (OBM)"`Yellow Sheet, Chicago 0 region for Old Newspapers (ONP)# 8, high side of range. The Contractor shall pay the City 50%of this OBM index for all grades of paper collected after a .processing fee of$75 per ton. 6.2.2 Aluminum Aluminum prices shall be based on the American Metal Market (AMM), Aluminum 1st issue of the month), high side nonferrous scrap prices: scrap metals, domestic aluminum producers, buying prices for processed used aluminum cans in carload lots, f_o.b_ shipping point, used beverage can scrap_ The Contractor shall pay the City 50% of this AMM aluminum index after a processing fee of$150 per ton_ The Contractor shall provide copies of the referenced OBM market index and AMM market index with each monthly statement_ The Contractor shall provide a detailed explanation of how the material splits are calculated to derive the paper and aluminum tonnage estimates. 7 As of 01f07/08 The city or the contractor may propose other revenue sharing commodities and corresponding proposed pricing formulae, at any time during the duration of the contract. The parties shall enter into negotiations in good faith and any new revenue sharing agreement shall be reduced to writing in the form of an amendment to the contract_ 6,3 Other Any other mutually agreed upon charges or credits_ 7s RFP and contractor's Proposal The contents of the City's RFP (as of Sept_ 24, 2007) and the contractor's proposal are part of the contractual obligations and are incorporated by reference into this contract_ if any provision of the contract is in conflict with the referenced RFP or proposal, the contract shall -take precedent_ GENERAL REQUIREMENTS FOR ALL COLLECTIONS The following general requirements are pertinent to all recycling collections (Le., both curbside recycling collection and multi-family recycling collection services). However, the city acknowledges that collection service frequencies and other factors will vary between residential and multi family collection programs_ 8. Missed collections The contractor shall have a duty to pick up missed recycling collections. The contractor agrees to pick up all missed collections on the same day the contractor receives notice of a missed collection, provided notice is received by the contractor before 11:00 a.m. on a business day_ With respect to all notices of a missed collection received after 11:40 a.m_ on a business day, the Contractor agrees to pick up that missed collection before 6:00 p-m. on the following business day. 9. Severe weather The Contractor may postpone recycling collections due to severe weather at the sole discretion of the contractor_ "Severe weather" shall include, but shall not be limited to those cases in which the temperature at 6:00 a-m_ is minus twenty(-20) degrees Fahrenheit or colder_ if collections are so postponed, the contractor shall notify the city. Upon postponement, collection will be made on a day agreed upon between the contractor and the city. 10. collection hours and days The city requires all such collections to begin no sooner than 7 a.m. and shall be complete by 6 p-m. Collection of recyclable materials from households north of 1-694 will take place every Wednesday and households south of 1-694 will take place every Tuesday. During pre- selected holiday weeks, collection days will take place one day later. The contractor may request one time city authorization of exceptions to these time and day restrictions(e.g., pursuant to the "Severe Weather" section 9 above). The contractor must request such exception prior to the requested collection event and specify the date, time and reason for the exception- 8 As of 01/07/08 11. Customer Complaints The Contractor shall establish and maintain, in a location approved by the City, an office with continuous supervision for accepting complaints and customer cabs. The office shall be in service with continuous supervision daring the hours of 8 a.m. until 5:00 p.m_ on all days of collection as specified in this Agreement. The address and telephone numbers of such office, and ten (10)days prior notice of changes therein, shall be given to the City in writing. g The address of this office as of the execution of the contract is 2828 Kennedy street NE, Minneapolis, Minnesota 55413. r_ Complaints on service will be taken and collected by the city and the contractor_ The City will notify the contractor of all complaints it receives. The Contractor is responsible for corrective actions_ The contractor shall answer all complaints courteously and promptly. Each month the Contractor shall provide the City with the following reports: s A list of all customer complaints, including a description of how each complaint was resolved a A list of all addresses where education tags were left for residents and why the tags were left_ m A list of all missed pick ups reported to the contractor_ The monthly reports shall be sent by mail, fax or e-mail to the City's Recycling Coordinator. 12. City retains right to specify resident preparation instructions The contractor shall agree that it is the City'§ sole right to clearly specify the resident sorting and setout requirements. The city shall publish and distribute, on an annual basis, the detailed recyclables preparation instructions for its residents as part of its annual public education flyer_ However, the City agrees to confer with the Contractor before the annual flyer distribution. 13. City shall approve Contractor's public education literature The contractor shall conduct its own promoti0ns and public education to increase participation and improve compliance with city-specified resident preparation instructions as per the public education elements of the annual work plan At a minimum, this shall include: production and distribution of an annual flyer to each home? and distribution of"resident education fags"to be left by curbside collection crews if any non-targeted material is rejected and left at the curb_ The contractor shall submit a draft of any public education literature for approval by the city, at least one (1) month before printing and release of any such literature. 14. Ownership of work Product Ownership of all drawings, designs, proprietary materials, and other work products re ared, p p produced or developed in performance of this contract, including those in electronic farms, shall be retained by the contractor_ contractor agrees that all right, title, and interest in all copyrightable material which Contractor shall conceive or originate, either individually or jointly with others, and which arises out of the performance of this contract, shall be usable by, and on behalf of the city by The Contractor, for the duration of the contract period and any subsequent extensions. 9 As of 01107108 Ownership of all reports, and physical copies of work products prepared or produced in performance of this Contract, excluding those in electronic form, shall be retained by The City upon completion or termination of the project and final payment to the Contractor_ #.5. Weighing of loads Contractor will keep accurate records consisting of an approved weight slip with the datel time, collection route, driver's name, vehicle number, tare weight, gross weight and net weight for each loaded vehicle. Collection vehicles will be weighed after completion of a route or at the end of the day,whichever occurs first- A copy of each weight ticket shall be kept on file and made available for inspection upon request by the City_ 16. Monthly and annual reports The Contractor will submit to the City monthly reports and annual reports. At a minimum, the Contractor shalt include the following information: a Cross amounts of materials collected, by recyclable material (in tons)_ • Net amounts of materials marketed, by recyclable material (in tons). 0 Amounts of IL process residuals"disposed (in tons)_ Recycling service lee (based upon contracted price per household)_ • Revenge share credits back to the City (if any)_ Monthly reports shall be due to the City by the 15'h day of each .month_ Annual reports shall be due by January 31_ The Contractor will be encouraged to include in its annual report recommendations for continuous improvement in the City's recycling program (e-g-, public education, multi-family recycling, etc_)_ 17. ownership of recyclables Ownership of the recyclables shall remain with the person placing them for collection until Contractor's personnel physically touches them for collection, at which time the ownership of the recyclables shall transfer to Contractor. 18s scavenging prohibited All recyclable materials placed for collection shall be owned by and are the responsibility of the occupants of residential properties until the Contractor handles them_ Upon collection of the designated recyclable materials by the Contractor, the recyclable materials become the property and responsibility of the Contractor_ It is unlawful for any person other than the City's recycling Contractor or owner's independent hauler to collect, remove, or dispose of designated recyclables after the materials have been placed or deposited for collection in the recycling containers_ The owner, owner's employees, owner's independent hauler's employees, or City's recycling Contracto(s employees may not collect or"scavenge"through recycling in any manner that interferes with the contracted recycling services_ 10 As of 01/07/08 19. cleanup of spillage or blowing litter The Contractor shall clean up any material spilled or blown during the course of collection and/or hauling operations. All collection vehicles shall be equipped with at least one broom and one shovel for use in cleaning up material spillage_ Designated recyclables shall be transported in a covered vehicle so that the recyclables do not drop or blow onto any public street or private property during transport_ 20. Recyclable materials required to be transported to markets; Disposal P � prohibited = Upon collection by the City's recycling Contractor, the City's Contractor shall deliver the designated recyclables to a recyclable material processing center, an end market for sale or reuse, or to an intermediate collection center for later delivery to a processing center or end _ market_ It is unlawful for any person to transport for disposal or to dispose of designated recyclables in a mixed municipal solid waste disposal facility_ The Contractor shall not - landfill, incinerate, compost or make fuel pellets out of the recyclable materials. 21. Designated primary glass market The City and Contractor hereby agree that Anchor Glass Corp_ llllhl(Shakopee, shall be the � primary market of choice for glass bottles and jars collected from the City's recycling program. The Contractor shall develop a proposed glass marketing contingency plan in writing for review, comment and approval by the City. This contingency plan shall be based on recycling glass into markets with the highest and best use of this commodity. The Contractor shalt provide an annual assessment of the Anchor glass market as part of its annual report to the City- The Contractor shall provide as much notice as possible if the Anchor glass plant closes, stops accepting recyclable glass cutlet, or otherwise becomes economically unfeasible as the primary glass market outlet_ if Anchor is no longer a viable primary market for glass, and if the Contractor must adjust its glass processing and/or marketing operations, the Contractor may submit a proposed per ton fee amendment to the City. This per ton fee amendment proposal must include a detailed cost justification for any fee increase_ once the fee amendment proposal is submitted, the City shall have 30 days to negotiate a final fee amendment with the Contractor for approval by the City Council. 22. Processing facilities must be specified The Contractor shall assure the City that adequate recyclable material processing capacity p g p Y will be provided for City material collected_ The Contractor shad provide written notice to the City at least 60 days in advance of any substantial change in these or subsequent plans for receiving and processing recyclables collected from the City- 23. Estimating materials composition as collected The Contractor shall conduct at least one materials composition analysis of the City's Y Y recyclables each year to estimate the relative amount by weight of each recyclable commodity by grade. The results of this analysis shall include: (1)percent by weight of each recyclable commodity by grade as collected from the City; (2) relative change compared to the previous year's composition; and (3) a description of the methodology used to calculate 1� ------------ As of 01/07/08 the composition, including number of samples, dates weighed, and City route(s) used for sampling. The Contractor shall provide the City with a copy of each such analysis. 24,, Estimating process residuals The Contractor shall provide the City a written description of the means to estimate process residuals derived from the City's recyclables_ This written description shall be reviewed and approved in writing by the City_ This written description shall be updated by the Contractor immediately after any significant changes to the processing facilities used by the Contractor. The Contractor shall record the weight and generator for all materials entering the processing facility on a daily, monthly and annual basis. These records shall be made available to the City upon request_ The Contractor shall report total weight of material disposed as shipped out to a mixed municipal solid waste facility compared to the total material shipped out each month form its - processing facility_ 25., Lack of adequate market demand In the event that the market for a particular recyclable ceases to exist, or becomes economically depressed that it becomes economically unfeasible to continue collection, processing and marketing of that particular recyclable, the City and the Contractor will both agree in writing that it is no longer appropriate to collect such item before collection ceases_ The Contractor shall give the City as much notice as possible about the indications of such market condition changes_ The Contractor may then initiate the formal process by sending a letter to the City notifying the City that the recyclable item should be discontinued from collection_ Upon receipt of the Contractor's notice, the City shall have 30 days to review and negotiate a contract amendment relating to disposal of such a recyclable commodity that does not have adequate market demand. After this 30 day period, the City shall pay the costs of all disposal of any item collected that is deemed not recyclable by Contractor and the City due to lack of adequate market demand until the City has approved that collection be discontinued for those materials. After the City agrees to discontinue collection of those materials, the Contractor is responsible for the costs of all disposal of any item collected that is deemed not recyclable by Contractor and the City due to lack of adequate market demand. The City and Contractor shall specify a date in this written contract amendment to cease collection of the recyclable item in question_ The Contractor shall at all times be under a duty to minimize recyclables ending up in landfill or disposal at other facilities receiving mixed municipal solid waste. If disposal of any recyclable commodity becomes necessary, upon receiving written permission from the City, the Contractor shall dispose of the recyclable materials at a facility specified in writing by the City or an alternative agreed upon by the City and the Contractor_ 26. Vehicle requirements Each collection vehicle shall be equipped with the following: • The Contractor's vehicles shall be marked with the name and telephone number of the Contractor prominently displayed on both sides of the truck_ The fettering must be at least 3 inches in height_ 12 As of 01/07/08 2-way radio. e First aid kit_ Approved fire extinguisher_ Warning flashers. • warning alarms to indicate movement in reverse_ Sign on rear of vehicle which states "This vehicle makes frequent s sto "_ p • Broom and shovel for cleaning up spills_ All of the required equipment must be in proper working order. All vehicles must be maintained in proper working order and be as clean and free of odors as possible. 27. Personnel Requirements Contractor shall retain sufficient personnel and equipment to fulfill the requirements and - specifications of this Agreement. Contractor's personnel shall: Conduct themselves at all times in a courteous manner with the general public. • flake a concerted effort to have at all times a presentable appearance and attitude. Perform their work in a neat and quiet manner and clean up all recyclables spilled in collection and hauling operations • Avoid damage to property_ • Not perform their duties or operate vehicles while consuming alcohol or illegally g Y using controlled substances or while under the influence of alcohol and/or such substances. 28. Licenses and Permits The contractor shall ensure that all driver and truck licenses and permits shall be current and in full compliance with local, state and federal laws and regulations. Any processingfacility tY used to handle material from the city of Arden Hills must have current permits and licenses as required by the appropriate city, county, state and federal laws and ordinances_ contractor shall make available for inspection all such licenses and permits upon request b the City. q Y 29. Performance monitoring The city will monitor the performance of the contractor against goals and performance standards required within this the and in the contract. Substandard performance as determined by the city will constitute non-compliance. If action to correct such substandard performance is not taken by the Contractor within 00 days after being notified by the city, the City will initiate the contract termination procedures. 30. Liquidated damages The contractor shall agree, in addition to any other remedies available to the City, that the City may withhold payment from the contractor in the amounts specified below as liquidated damages for failure of the Contractor to fulfill its obligations: 1_ Failure to respond to legitimate service complaints within 24 hours in a reasonable and professional manner - $50 per incident. 13 As of 01/07/08 2. Failure to collect properly notified missed collections - $250 per incident_ 3. Failure to provide monthly and annual reports - $100 per incident. 4. Failure to complete the collections within the specified tirnefrarnes without proper notice to the city- $100 per incident. 5. Failure to dean up from spills during collection operations - $250 per incident plus any costs incurred by the City. 0. Failure to report on changes in location of recyclables processing operations - $250 per incident. 7. Failure to provide written description of the means to estimate relative amount of process residuals derived from the City's recyclables - $100 per incident. 8. Exceeding any maximum process residuals rate that may be negotiated as part of a final contract agreement - $1,000 per exceedence. - 9. Failure to receive City written approval of changes to the "dual stream" collection and processing systems prior to implementing any such change - $5,000. 10.Failure to conduct annual composition analysis - $100 per incident. These amounts will be for liquidated damages for losses suffered by the City and not penalties_ 31, Damage to Property The Contractor shall take all necessary precautions to protect public and private property. Except for reasonable gear and tear, the Contractor shall repair or replace any private or public property, including, but not limited to sod, mailboxes, or recycling bins, which are damaged by the Contractor. Such property damage shall be addressed for repair or replacement, at no charge to the property owner, within forty-eight (48) hours with property of the same or equivalent value at the time of the damage. If the Contractor fails to address the repair or replacement damaged property within forty- eight(48) hours, the City may, but shall not be obligated to, repair or replace such damaged property, and the Contractor shall fully reimburse the City for any of its reasonably incurred expenses. The Contractor shall reimburse the City for any such expenses within ten (10) days of receipt of the City"s invoice. 32. Recycling Collection The Contractor shall conform to the following provisions when collecting recyclables in the City: 1. The Contractor shall structure routes so that lighter-loaded trucks travel on the streets with poorer construction. The City shall provide road condition information to the Contractor_ 14 As of 01107108 2. The Contractor shag begin their routes with as small a volume of recyclables in their trucks as practicable. 3. The Contractor shall assist the City by alerting the city Staff of unlicensed recycling haulers who may be coming into Arden Hills. CURBSIDE COLLECTION REQUIREMENTS The following collection requirements are for curbside recycling services only and do not pertain to multi-family recycling services_ 33. Weekly Collection _ The contractor shall collect curbside recycling materials weekly. 34. Point of collection All curbside collection service will occur at the curbside (i.e_, no alley collections of residential recyclables are allowed for residents with curbside collection service). Walk Up.Service A service for seniors, disabled and/or special needs residents who request for special service where the driver will walk up to the resident's garage door, stoop or other designated spot to collect recyclable material for loading onto the truck. The driver then returns the bins/carts to the same location. The city will compile a list of such service requests and present to the contractor 30 days prior to the first collection for those residents who will receive the service upon start of contract. The Contractor will take calls directly from residents who request this service and add them to the walk up service list as needed throughout the duration of the contract. 35. Curbside collection schedule deadline If the contractor determines that the collection of recyclables will not be completed by 6:00 p.m. on the scheduled collection day, the Contractor shall notify the city by 4:00 p.m. that same day and request an extension of the collection hours_ The Contractor shall inform the City of the areas not completed, the reason for non-completion and the expected time of completion. if the City's contract-designated contact person cannot be reached, the Contractor will request the City Manager. 36. Procedure for handling non-targeted materials If contractor determines that a resident has set out non-targeted materials, the driver shall use the following procedure: 1. Contractor shall leave the non-targeted materials in the resident's curbside recycling bin and leave an "education tag„ indicating acceptable materials and the proper method of preparation. 2. The driver shall record the address and the contractor shall report the address to the city within the monthly report_ 15 As of 01I07l08 37. New Materials to be Added in 2008 = The City and the Contractor have agreed to add three new materials to the curbside collection program: pop/beer boxes and.textiles. The pop/beer boxes shalt be added to the paper stream. These items should be flattened and placed by the resident unbundled with the other papers (newspaper, magazines, etc. Aseptic-and tabletop packaging (including milk cartons and juice boxes)will be added to the bottle and can stream_ Residents shalt place textiles separately in plastic garbage bags or other bags as determined by the City. Each bag or set of bags will have a identifying marker clearly identifying the materials for collection. Residents will be instructed to avoid the use of paper bags and boxes; however, materials set out in these containers are acceptable provided that the materials have not been exposed to rain or snow. If the textiles are wet the Contractor will - not collect those items. MULTI FAMILY COLLECTION REQUIREMENTS 38.Contract Amendment for Multi-Family Collection If the City were to amend the recycling contract in the future to include one or more of the MFDs and/or the manufactured home park, the City would provide of least a 90 day advanced notification to the Contractor and would schedule a meeting to discuss possible changes in price per household, revenue sharing arrangement, and/or collection schedule INSURANCE AND OTHER LEGAL REQUIREMENTS 39.Insurance Insurance secured by the Contractor shall be issued by insurance companies acceptable to the City and admitted in Minnesota. The insurance specified may be in a policy or policies of insurance, primary or excess. Such insurance shaft be in force on the date of execution of the contract and shall remain continuously in force for the duration of the contract. The Contractor shalt have the City of Arden Hills named as an additional insured on each insurance policy specked below, unless the Contractor submits in writing this is not feasible for a specific insurance policy. The Contractor shalt then provide certificates of insurance to the City by approximately December 15 of each year. The Contractor and its sub-contractors shall secure and maintain the following insurance. 39.1 Workers Compensation Insurance Workers Compensation insurance shall meet the statutory obligations with Coverage B- Emptoyers Liability limits of at feast$100,000 each accident, $500,000 disease - policy limit and $100,000 disease each employee_ 16 As of 01 f07/08 39,2 Commercial General Liability insurance Commercial General Liability insurance shalt be at the limits of at least $1,000,000 general aggregate, $1,000,000 personal and advertising injury, $1.000,000 each occurrence $50,000 fire damage and $1,000 medical expense for any one person_ The policy shall be on an "occurrence;` basis, shall include contractual liability coverage and the City shall be named an additional insured_ This insurance includes up to $10,000 expenses to extract pollutants from land or water at the "premises" if the discharge, dispersal, seepage, migration, release, escape or emission of the pollutants is caused by or results fora a covered cause of loss. 39.3 Commercial Automobile liability insurance Commercial Automobile Liability insurance covering all owned, non-owned and hired _ automobiles with limits of at least $1,000,000 per accident_ This insurance includes a cause of loss where there is a spill of feels and lubricants used in the vehicle for its op eration_ - 39.4 Director's & officers insurance or Errors & omissions Director's & Officers Insurance or Errors & Omissions insurance providing coverage for St wrongful act" any actual or alleged error, misstatement, misleading statement, act or omission, neglect or breach of duty_ The insurance policy provides $1,000,000 each occurrence and $1.000,000 aggregate limit of liability for each year. Acceptance of the insurance by the City shall not relieve, limit or decrease the liability of the Contractor. Any policy deductibles or retention shall be the responsibility of the Contractor. The Contractor shall control any special or unusual hazards and be responsible for any damages that result from those hazards_ The City does not represent that the insurance requirements are sufficient to protect'the Contractor's interest or provide adequate coverage_ Evidence of coverage is to be provided on a City-approved Insurance Certificate. A thirty- (30) date written notice is required if the policy is canceled, not renewed or materially changed. The Contractor shall require any of its subcontractors to comply with these provisions. 40. Transfer of Interest The Contractor shall not assign any interest in the contract, and shall not transfer any interest in the contract, either by assignment or novation, without the prior written approval of the City. The Contractor shall not subcontract any services ender this contract without prior written approval of the City. Failure to obtain such written approval by the City prior to any such assignment or subcontract shall be grounds for-immediate contract termination. The Contractor currently subcontracts to provide service to old corrugated containers(OCC)9 customers that require durnpster capacity. This subcontract is annual and the Contractor will notify the City in writing if there is a change in providers. 41. Non-Assignability and Bankruptcy The parties hereby agree that the Contractor shall have no right to assign or transfer its rights 0 0 and obligations under said agreement without written approval from the City. In the event, the Contractor, its successors or assigns files for Bankruptcy as provided by federal law, this agreement shall be immediately deemed null and void relieving all parties of their contract rights and obligations. 17 As of 01 f07f08 42. Dispute resolution and arbitration procedures The parties agree that any controversy or claim arising out of or relating to this agreement or the breach thereof, sham be settled, at the option of the Contractor by arbitration in accordance with the Rules of the American Association of Arbitration and judgment upon the award by the Arbitrator(s) may be entered in any court with jurisdiction thereof. 43. General compliance The Contractor agrees to comply with all applicable Federal, State and local laws and regulations governing funds provided under this contract_The Contractor pays its employees a prevailing wage based on the recycling industry in the state of Minnesota and Hennepin County. The Contractor does not use temporary labor arrangements to avoid paying a living wage. All of our employees, permanent and temporary, receive a paycheck that meets or exceeds living wage standards_ Additionally, the contractor - provides health insurance for all fulltime employees and a pro rata share for employees working more than 20 hours but less than 40 hours a week_ 44s Independent contractor Nothing contained in this agreement is intended to, or shall be construed in any manner, as creating or establishing the relationship of employerfemployee between the parties_ The Contractor shall at all times remain an independent Contractor with respect to the services to be performed under this Contract_ Any and all employees of Contractor or other persons engaged in the performance of any work or services required by Contractor under this Contract shall be considered employees or sub-contractors of the Contractor only and not of the City; and any and all claims that might arise, including Worker's Compensation claims ender the worker's Compensation Act of the State of Minnesota or any other state, on behalf of said employees or other persons while so engaged in any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of Contractor. 45. Hold harmless The Contractor agrees to defend, indemnify and hold harmless the City, its officers and employees, from any liabilities, claims, damages, costs,judgments, and expenses, including attorney's fees, resulting directly or indirectly from an act or omission of the Contractor, its employees, its agents, or employees of subcontractors, in the performance of the services provided by this contract, any resulting environmental liability that is a result of this contract or by reason of the failure of the Contractor to fully perform, in any respect, any of its obligations under this contract_ if a Contractor is a self-insured agency of the State of!Minnesota, the terms and conditions of !Minnesota Statute 3-732 et sect. shall apply with respect to liability bonding, insurance and liability limits. The provisions of!Minnesota Statutes Chapter 466 shall apply to other political subdivisions of the State of!Minnesota. 46. Accounting standards The Contractor agrees to maintain the necessary source documentation and enforce sufficient internal controls as dictated by generally accepted accounting practices to properly account for expenses incurred under this contract_ 18 As of 01/07108 47. Retention of records The Contractor shall retain all records pertinent to expenditures incurred under this contract for a period of three years after the resolution of all audit findings. Records for non- expendable property acquired with funds under this contract shall be retained for three years after final disposition of such property_ 48. Data practices The Contractor agrees to comply with the Minnesota Government Data Practices Act and all other applicable state and federal laws relating to data privacy or confidentiality_ The Contractor must immediately report to the City any requests from third parties for information relating to this Agreement. The City agrees to promptly respond to inquiries from the Contractor concerning data requests. The Contractor agrees to hold the City, its officers, and employees harmless from any claims resulting from the Contractor's unlawful disclosure or use of data protected under state and federal laws- All Proposals shall be treated as non-public information until the proposals are opened for review by the City- At that time the Proposals and their contents become public data under the provisions of the Minnesota Government Data Practices Act, Minn. Stat. C_ 13_ 43. Inspection of records All Contractor records with respect to any matters covered by this agreement shall be made available to the City or its designees at any time during normal business hours, as often as the City deems necessary, to audit, examine, and make excerpts or transcripts of all relevant data. 50, Applicable law The laws of the State of Minnesota shall govern all interpretations of this contract., and the appropriate venue and jurisdiction for any litigation which may arise hereunder will be in those courts located within the County of Ramsey, State of Minnesota, regardless of the place of business, residence or incorporation of the Contractor. 51. Contract termination The City may cancel the Contract if the Contractor fails to fulfill its obligations under the Contract in a proper and timely manner, or otherwise violates the terms of the Contract if the default has not been cured after 60 days written notice has been provided_ The City shall pay y Contractor all compensation earned prior to the date of termination minus any damages and costs incurred by the City as a result of the breach. if the contract is canceled or terminated, all finished or unfinished documents, data, studies, surveys, maps, models, photographs, reports or other materials prepared by the Contractor under this agreement shall, at the option of the City, become the property of the City, and the Contractor shall be entitled to receive just and equitable compensation for any satisfactory work completed on such documents or materials prior to the termination_ 52. Employee working conditions and Contractor's safety procedures The Contractor will ensure adequate working conditions and safety procedures are in place to comply with all applicable federal, state and local laws and regulations_ The City reserves the right to inspect on a random basis all trucks, equipment, facilities, working conditions, 19 As of 01107/08 training manuals, records of claims for worker's Compensation or safety violations and standard operating procedures documents_ 53. Contract amendments Any amendments to this Agreement shah be valid only when reduced to writing, and duly signed by the parties. IN WITNESS WHEREOF, the parties have subscribed their names as of the date first written_ The Neighborhood Recycling corporation, Inc.(D/B/A "Eureka Recycling"): city of Arden Hills: 8y By -Lim- Chief xecutive Officer C_jity Administrator B JB toci Y144 'w y Chief Ope -ng Officer MaYoF___/ APPROVED TO FORD By Cit Attorney 20 s FIRST CONTRACT AMENDMENT BETWEEN CITY of ARDEN HILLS AND EUREKA RECYC 'NG FOR RECYCLING SERVICES 1.0 PARTIES.This contract Amendment is dated the 23 'day Of June, 2009, and is _ entered into by and between the city of Arden Hills, 1245 west Highway 06 0 y -- Arden Hills! Minnesota 55112 (the"City', a Minnesota Statutory city, and the Neighborhood Recycling Corporation, Inc. (DIB/A"Eureka Recycling"), a T_ Minnesota non-profit corporation, with its current local place of business at 2828 Kennedy Street NE, Minneapolis, Minnesota 55413 ("'Contractor"). _ .0 RECITALS. A. The city and contractor are parties to the contract Agreement Between 0 City of Arden Hills and Eureka Recycling for Recycling Services dated January 7, 2008 ("contract"}. S. The Parties wish to amend Sections 6 and 25 of the contract hereinafter e einafter specified. 3-0 TERMS AND CONDITIONS. In consideration of the undertakings herein n expressed, the city and Contractor agree as follows: A. Section 6 and its subdivisions of the contract are hereby amended in its entirety to read as follows: 6. Payment Terms The contractor will invoice the city of Arden Hills on a monthly basis and the city will pay the contractor no later than net 36 days of receipt of the invoice. The billing system will include the following elements: 6.1 Monthly Price per Residential Dwelling Unit City agrees to pay per P Contractor$2.05 per residential dwellingunit month in 2008 for weekly c_ urbside collection and marketing of recyclables. For 2008T the city certifies that there are 2,560 curbside units that will receive service. The CitY wili note _ fY the Contractor by February 1 of each year what the certified number of curbside units will be for the subsequent year. The City agrees that the price per residential dwelling unit will _ - 9 increase each year by the Consumer Price Index for the Upper Midwest as determined by the Federal Reserve Batik of Minneapolis or by three (3)percent, whichever is less. The price g change shalt o t s into effect on March I of each year- The City will notify the Contractor by the last week of December what the compensation a � rate will be for the-subsequent contract gear_ b.2 Materials Sales Revenge Share and Processing Fees 6.2.1 recyclable material prices Each month the ContraGtot shall calculate the revenge share for all commodities. Those calculations shall be included as part of the Contractor's report to the City_ Contractor shad use-the following - indices in determining the prices of the recyclable materials: A. Paper grades including newsprint and inserts ma azines catalogs, and mixed mail.shall be: • The official Board Markets (OBIVI) Yellow Sheet, Chicago g region for old Newspapers (ONP) #8, high side of range_ B. old Corrugated Cardboard shall be: The official Board Markets (OBIVI) Yellow Sheet, oChicag region for oCC#1 1, high side of range- C. old Boxboard stall be: • The official Board Markets (OBM) Yellow Sheet, Chica Q 9 region for Mixed Paper#1, high side of range. D. Telephone books and Wet Strength Cardboard shall be: • Market price paid by Contractor's designated custorer. E. Aluminum shall be: Average market price during that month paid by Contractor's designated customer. F. Bach: clear glass, brown glass, glass:lass: and mixed g glass shall be. • The aggregate market price paid by Anchor Mass Corporation's Shakopee, (Minnesota plant, and/or the Market price paid or charged by end market, averaged based on.the facility percentage composition of each t _ Ype of Mass in the stream as reflected in the annual composition study, less shipping costs to transport materials to market- G.. Steel shall be: 2 s _ a • Average market price during that month aid b >3 Y Contractor's designated customer. H. Each plastic. PET, HDP --natural HDPE-colored shall be- . • Market price paid by Contractor's designated customer- - 6.2.2 Processing fees The processing fee for all paper grades shall be 60-QO per ton, which includes materials A, 8, C, and D in section 6.2.1. The processing fee for all Aluminum, Glass steel and Pl astic materials shall be $90-00 per ton, which includes materials E. F, G, and H in section 6.2.1. There shall be no processing fee for residual materials- 6.2.3 Revenue and processing fee formula Revenue will be calculated b multiplyingthe tons of individual y material collected by the agreed upon material price as described in section 6.2.1. Total Revenue will be calculated by adding all of the revenue generated for each of the materials collected and processed. contractor shalt guarantee a minimum price on all materials of$0.00 per ton_ If a particular material price is negatives a price of$0.00 per ton shall be used._ Processing fees as described in Section 6.2-2, shall apply to materials with prices of less than $0.00 per ton. Processing fees will be calculated b multiplyingthe to . . . � tons of individual material collected by the agreed upon processing fee for each material type as described in section 6.2.2. Total Processing Fees will be calculated by addict all of the processing fees 9 P g generated for each of the materials collected and processed. Revenue share received b the City will be calculated y � by subtracting the Total Processing Fees from the Total Revenues. If the remainder is positiv- e, that number represents the revenue that shalt be split between the City and the contractor 50f50. if the remainder is negative, that number represents the amount of _ p processing fees not covered by that morth's revenue and will be paid in full by the city. 6.2.4 Price reporting The contractor shall provide copies of the OBM Market index wi th th each monthly statement for materials A. 8, and C in section 6.2. 3 For commodities where revenue is based on Market pricin s the Con � Contractor shall provide copies of Load Verification Forms detailing the amount of material sold, the vendor,-and the rice aid_ The . P P _ Load Verification Forms shall-be included with the contractors report to the City. Market pricing is applied to rec gable materials Y D, E, F, c, and H in section 0.2_1. The Contractor shall provide a detailed a lanation p of how each material 'is calculated to determine material tonnage estimates- . section 25 of the Contract is hereby amended in its entirety to read as follows: .25. Changing Market Demand - 25.1 Lack of Adequate Market Demand If the contractor determines that there is no market for a part�c'- ular recyclable or that the market has become economically unfeasible, the contractor shall immediately give written notice to the City- said notice shall include information demonstrating the effort the Contractor has made to find market sources and the financial information justifying the conclusion that the market-is eco -nomically unfeasible. Economic unfeasibility is defined as a market in which market value received for a material are less than zero o _ Don receipt of said notice, the Contractor and the City shall have 30 days to attempt to find a feasible market. During this period, the Contractor shall continue to pick up the particular recyclable. If the Contractor or the Cityis not able to find a market et within 30 days, the City has the option to: a) Require the contractor to continue to collect theparticular. recyclable_ In such case, the city would pay the Contractor, as additional compensation, the tipping fee at the Newport R.DF plant or a mutually agreeable alternative site_ The Contractor is required to keepaccurate records of said fees es and provide the City receipts of payment. b) Notify the contractor to cease collection of the particular recyclable until a feasible market is located, either by the Contractor or by the City- The Contractor would then be responsible for the cost of printing and distributing educational materials explaining the market situation to residents. 4 • a 25.2 Burdensome Processing Fees to the City If, at its sole discretion, the City determines that processing fees � g have become burdensome for a particular.recyclable, the City shall immediately give written notice to the contractor. Upon receipt of said notice, the contractor and the city shall have 30 days to negotiate a contract amendment that results in: a) The removal of the processing fees for the particular recyclable. b) The removal of the particular recyclable from collection. The City would then be responsible for the cost of.printing and distributing educational materials explaining the market situation to residents. If a contract amendment is not negotiated within this 30 dayperiod, = the Contractor shall be responsible for all processing fees and tipping fees_ IN WITNESS WHEREOF, the parties have hereunto set their hands. The Neighborhood Recycling City of Arden Hitts Corporation, Inc. (D/BJ4 "Eureka Re ding): i B1 i 1v e Executive ffi er Ronat J. o se, C' dministratcr .B e j t C op �ang offi er `tame . Har to Mayor 5 ussIoUIs to redonerast toa}�tegh innovative resoceaagement and to read waste=free toorrov by denstrating tf�at gas#e is prvetabe, notevitab ey July 30, 2010 Meagan Beekman Arden Hills City Hall 1245 1%est Highway 96 Arden Hills, MN 55112 T Dear M eagan: Thank you for taking the time to meet with me last week. I appreciated our discussion about the partnership we have built over the last two and a half years. Eureka Recycling would be very much in favor of continuing the partnership we have started with the City of Arden Hills and its residents by extending our recycling collection services contract. In the first year of our contract, the participation rate of residents in the city's recycling ro p gram was 72%. In 2009, participation in the program rose to 82%, one of the highest rates in the Twin Cities! One of the reasons for this increase in participation is the amount of communication Eureka Recycling has with residents. Since March 2008, when our partnership began, Eureka Recycling has been reaching out to city residents to educate them about their recycling program and provide them with accurate and inspiring messages about how their participation benefits the environment and the city. V e have had over 340 conversations with Arden Hills residents through our zero- waste hotline. In addition to the annual guide to recycling that we mail each December to every household in the city, we have received requests from residents for an additional 45 pieces of educational information. Our recycling collection drivers have left over 5,500 educational tags right in residents' recycling bins to help educate them directly about how to sort their materials and about what is recyclable in Arden Hill's recycling program. For residents who do not use recycling bins, we mailed over 100 postcards to those who needed additional information about participating in the recycling program. This direct education is the most efficient and cost effective way to help residents fully understand their recycling program. Eureka Recycling was the first organization in the state to offer each city we serve a share of the revenue made from the sale of recyclable material set out by city residents. Even in the difficult economic.times experienced in the last few years, Arden Hills received revenue back from the sale of material. In the very difficult year of 2009, Arden Hills received$3,325 in revenue share. Since the beginning of our contract, the city has received over $30,000 in revenue share. 2828 Kennedy Street NE Minneapolis,MN 55413 (651)222-7678 Fax(612)623-3277 www.eurekarecycling.org Eureka Recycling is an affirmative action,equal opportunity employer.it is our policy to hire without discrimination based on race,creed,religion,sex,color,national origin, sexual or affectional orientation,ancestry,familial status,age,disability,marital status or status with regard to public assistance. Printed with soy-based ink by a Minnesota Great Printer on 100%postconsumer recycled paper that was processed without the use of chlorine. This revenue share helps to keep the cost of the program low for the city and helps to support other environmental and waste reduction programs in the city. One of the reasons that Arden Hills was able to continue to receive revenue share even in hard economic tunes, is that the quality of the material that residents set out in the city is among the best in the state. The residual rate (amount of non-recyclable material being collected at the curb) in Arden Hills in 2009 was 0.09%. That means that less than one tenth of one percent of what residents set out at the curb is not recyclable. In programs in other cities that do not partner with Eureka Recycling that number can be as high as 10-15%. This achievement is a result of the education and outreach that Eureka Recycling and the city have done to help residents understand their program and the benefits of their participation. One of the important things that Eureka Recycling does to help inspire and inform residents about the irnportance of participating in the city's recycling program is to provide them. with information on the environmental benefits of their recycling efforts. In the first two years of our partnership with the City of Arden Hills, residents set out over 1,500 tons of material. -%hen material is recycled instead of being wasted, it saves the tremendous amount of the energy that would have been required to make new, replacement products from virgin materials. This energy saving translates into positive environmental benefits. The recycling efforts of the residents of Arden Hills in the first two years of the contract prevented over 3,840 metric tons of carbon dioxide from being released into the atmosphere. This positive environmental impact is the equivalent of 1.3% of residents in Arden Hills agreeing to give up driving their cars for the same two year period. Eureka Recycling and the City of Arden Hills have worked together to create a recycling program that is among the best in the state. Participation in the program is very high. The quality of the materials being collected is very high and the city is receiving revenue share back to help keep the cost of the program affordable. V e look forward to continuing our partnership together as we work toward a waste-free tomorrow. Please feel free to contact Christopher Goodwin, Eureka Recycling's director of customer relations, if you have any additional questions or need additional information. Sincerely, Tim Brownell Susan Hubbard Debbie King CEO and President CSO CFO