Loading...
HomeMy WebLinkAbout7C, Resolution 2010-050 Awarding Bid for Lexington Avenue Sidewalk Projecti 1 � 3 � 3 � i3 i 1 �.� EN HILLS � ; , � i • • � Re uest for Counc�l Act�on ; q , , i , i � i , , i .�...._�....W.�....._�.._W...._...._..._W_.._......�_...w....��_.__.__.W_...�.....�..._......._.....__..�._,..�....,.�...WW_�.�...._.�......__._.w._..._..W_....Ww...._.._.�,...�...�....._.�.........__..�...w...,......�._...._._.�.. _..,...,.....�...._..,.W...�,......�_W._...,._...._.w.....__..�...,..__.......Y....._....�...V...,..Y,...........W_....._.._..W.�....W...�....�..�..._...._.._.w....w............_.._......._._�....._......W.�..�.._.....,_..._.._....,.____..�..�........w_ . . . � . . Prepared By: Matt Woodruff, Civil Engineer ; Council Meeting Date: September 13, 2010 � , Resolution 2010-050: Awarding bid for the Lexington Avenue Sidewalk Project Budgeted Amount: Actual Amount: Funding Source: $50,000 — Trail A(existing trail) $54,040 — Trail A $84,121— PIR Fund $63,000— Trail B(new trail) $57,121— Trail B $27,000 - Assessments (Construction, Engineering and Legal) Recommendation: Adopt Resolution 2010-050: Awarding bid for the Lexington Avenue Sidewalk Project Supporting Documents: • Memorandum dated September 13, 2010 from Matt Woodruff, Civil Engineer • MFRA recommendation letter and B id Tabulation • Resolution 2010-050 El� HILLS MEMORANDUM DATE: September 13, 2010 TO: Honorable Mayor and City Council Members Patrick Klaers, City Administrator FROM: Matt Woodruff, Civil Engineer SUBJECT: Lexington Avenue Sidewalk Projects - Award Bid Back�round On July 26, 2010, the City Council authorized a consultant contract with MFR.A, Inc. to complete engineering and construction services for the sidewalk and trail improvements along Lexington Avenue. The proj ect is composed of the following two separate sidewalk/trail segments: • Trail A: Existing bituminous trail rehabilitation from County Road F to Cummings Park Drive • Trail B: New concrete sidewalk from the CP Rail to Grey Fox Road The plans and specifications were completed and the City solicited bids during August and early September. Five bids were received and opened on September 9, 2010. Based on the bids received, staff recommends awarding the proj ect. Discussion Based on past practice, the City Council has awarded the contract to the lowest responsible bidder. In the case of the Lexington Avenue Sidewalk Project, the lowest bidder is North Valley, Inc. of Elk River, Minnesota. Financial Implications Construction: The City received five bids for the proj ect. As mentioned, the construction proj ect is composed of two sidewalk segments and contractors separated their submitted bids into Trai1 A and Trail B subtotals. The lowest total bid submitted by North Valley, $90,011.62, is 13% lower than the engineer's construction estimate of $103,219.85. The following is a list of the bids received: City Council Meeting \�Metro-inet\ardenhills�PR&PW�Engineering\Council_Actions�2010\9-13- l OMemo_LexingtonTrail_AwardBid.doc Page 1 of 2 BIDDER TRAIL A TR.AIL B TOTAL BID North Valley, Inc. $ 48,031.06 $ 41,980.56 $ 90,011.62 Barber Construction $ 66,896.81 $ 42,723.19 $ 109,620.00 Concrete Idea $ 75,547.95 $ 42,677.50 $ 118,225.45 Minger Construction $ 64,447.70 $ 5 5,195 . 8 S $ 119,643 . S 5 DMJ Asphalt $ 86,782.31 $ 43,033.70 $ 129,816.01 Construction En�ineerin� The City has contracted with MFR.A, Inc. for engineering services through the design and construction phases for a total amount of $16,970. It is estimated that Roseville engineering services will be $2,600. Fundin� S ources : This proj ect is budgeted to use PIR Funds and special assessments. For the special assessments, the City has entered into an agreement with Inland Shannon Square Cub, LLC and Inland Shannon Square Shoppes, LLC in which they will each pay for one- quarter (1 /4) of Trail B construction and engineering services. The amount each entity will be assessed is $13,500; for a total assessment of $27,000. This amount includes construction costs, engineering fees, and legal fees. Staff has contacted Inland Properties to provide them the bid results and the proposed assessment amount, as outlined in the terms of the agreement. At the time the council packet was distributed, staff had not received a response whether the amount is acceptable to Inland Properties. The proposed assessment amount is lower than was estimated during earlier discussions with Inland Properties. Timeline: Construction is estimated to last approximately two to three weeks and the specifications state 4ctober �9, 2010 as the mandatory completion date. It is anticipated that construction will begin in early October. Council Action Requested Approval of Resolution 2010-050: Awarding the Lexington Avenue Sidewalk Project to North Valley, Inc. of Elk River, Minnesota, in the amount of $90,011.62, contingent upon Inland Properties' consent to the amount to be assessed. City Council Meeting \�Metro-inet�ardenhills�PR&PVV�Engineering\Council�Actions�.2010\9-13-10Memo_LexingtonTrail_AwardBid.doc Page 2 of 2 �; �,� •u £�k . ::3i� s=.:� ;�J��3.: z � �� . ,T 1.lEE�i#���3t�l4i�i3!������si�� 1`"!i��`���!� •>;';,>i'3�.�f`�# DATE; September 9, 2010 T�: City of Arden Hills FR4M; Matt Morreim, P.E, SUBJECT: Lexington Avenue Pedestrian improvements Bid Resuits The bid overview for the Lexington Avenue Pedestrian Improvements is as follows: 1. North Ualley Inc ...........................................................................„,.,,,,,,.,.,$94,011,62 2, Barber Construction Inc ..........................................................�109,620.00 3, Concrete Idea, Inc .............................................................................�118,225.45 4. Minger Construction ......................................................................$119,643,55 5. DMJ Asphalt ................................................................................................�129,816.01 A detailed bid tab is attached, 14800 28� Ave, N., Ste 140 Piymo uth, M i n n esota 55447 (763� 476. 6010 ma i n (763) 476, 8532 fax www.mfra.com The low bidder, North Valley, made a clerical error on the mobilization item that if strictly enforced would reduce their bid price by $2,249.50. The intent of the bid was clear and it was apparent that a clerical mistake was made, Their clerical error does not change the bidde�s low bid status. MFRA recommends that the City Council awards the contract to North Ualley in the amount of $90,011.62, North Ualley is a well qualified contractor and we have worked with them on many successful projects. If you have any questions or need any additional clarification, please contact me, (n L J � J � = e z '� wE � � � Q � � � �' � � �� _� UE �•-• O n N p �t 0�0 � O O O O 0�0 r C� o oo �C t� 00 cV l� C G7 O CO O� •� E-+ � O O N�G oo O� 00 � N O Q o0 � � �A l� M � ct �t N � � � M " ~ •-+ •-• l� �D M N � a� x o � � ' vai sy b4 fA �i ER b9 bs ds ds c,R s�3 sg b G ¢ p vl v1 � r O v1 O O O O O y �� W O N N I� I� M N O O O O N � Q V c� vi v; M d' �� O N� p O o0 . �� S o � a � ; � g� S g� � g�� ��n, g v�i a E"' �n O� O� M� d M�D �D O o0 a z (_., I^ N .-+ N O o0 O�-+ M N� d� � Q p� N 00 .-+ M N N�--+ v1 � o F � � ► F�3 6g c�4 6R tf3 t� (f3 �f3 rf1 6�i bR �i � W p p p � � W O� o�o � O d�,� � M d�', O O� � ��„�'' V Q oo O NO �O �� N M N O M " "� V) � �-+ ) � a '" N � . � oS�S�gc�,SSNog A a �Q O v'� v; p oo C O�t O � cV , Q' (� Q � � � N � � M � � pp ..-� .-. W� � N •--� c+: •--+ c�j •--+ .-� .-. M� �-- .-� � b4 b4 69 6�4 Gfi 6i4 64 Gfi bi4 G%3 bFi b�4 � V � S S O O�i �$ N N� a O O a N N U � � O O O O O C O O S O O M � g C C g oo � O C� C�j Q Q� � d' v`� C� 00 � 00 v� �n N C� �--� �' oo '�t S S N �--� O N(V N N o0 � O U p4 6R 6R H9 rA 6R c�4 69 r�4 64 �4 rr4 � �W a� o o�� c� S S o c�' � � U O�� N�~ M N� O Q� � �� � �t"O' (V P� O� O O h S Q N O O O� � O N O O oo O O v� � O C O� �r O�' v'� v'� O N v� oo t� �n O o0 W � �l t� •-+ � 00 l� �O � O v� M � O N '"" �p "'' ''� N "" p � � � > s�cs�dsr�c���c�sRcfl�sg � Ex., .� c� a o r� �n o�n ►n a o0 o a o�ooNNo�NoS�r � � � U O �n O � 'd' ^' `� � N O � � � z�a N �� a O O� O o�o dQ' O O O O G7 N O v'� cV d oo �D O C� O C� � M � � � �C O� � � O � O Q � H H� M ^ N ���� N � H � ������n������r y, W S S� S��o, c��, c�, a� S S N w a p ch c�i �o c� .-, �c � o�f tn '" � � � � � W E� � � �►.w.ar�i�Uvi���.w.lri�,..1 W vi v� M v� O M�� O�� p o��o O'.,, "" M�. r., ,.., O'-" cn M r-+ .-+ d E� L10 G7 � � � 6�} � �l; O S � � � �i � O� O 0�0 l� Q M � � oM0 � C� 00 �O � 69 f!4 69 6R � O Q c. � � N� 0 � � � � � �D � � � � � � O � � N � � � O � v� v'� l� N G� � Gfi 6R ffi Ff? 6R} O �C �, � N �' � O Q � � v � M O O � .�-. �F d� [ � 00 � d' � � � � � � � o $ g M O OG ... r-. Q � O � i i i • �--� M d; O 00 � � � � � � 0 � O O p O O � M (V �G d 00 � � � � N C M N l� � � � � � � � �O �O O O CO cV r�'n ti U E-+ O--� .-+ � oNo � � � �D --� O� a� S� O O O O O O dp', � O O� d�' � v�i � N�� O v�'� O� M � � M M O N O�O v1 ��n O� N O o0 ..r t/j <rj .�r .-. .-� .-i �G M Q� N d' N ������������� � � O� O O O O O O O O v'� O Q O N o0 �/> �n M O' O Q O l� O N CO �n � N N M O N� oG Q M C oG O S o c� � � S�� S S� c� S S o�o � vi M d' 00 O M C� N�G cV cV O� �/'i M V� �O --+ �' �D --+ O N d' �O v� N N C� d' C^ l� M►n N�O C � �t h N O� N� �--� �D N t� N... .--. ri N M � O� .� ������������� � � O C� �M v�i O���� G7 ��', O� O O� M N� M M� N M O'[h � � � � O O O O O N O O O N O O O � d�',' 0 C oo O O 4�n C� v� C� Ci o�o � N� d�' � N r N O M�-+ M �-+ � O� l� OC ^�O �O N N •-+ �O � '-+ l� N o0 N `�' �--� � b'4 69 69 f/i E�4 69 d9 b�4 6�9 6l4 �i 6R 6�4 6fi 6R p O O O�� O� G7 � Q O O O� V1 �?i �p C� M N N d' Op M� O N N O O d O O N G7 O O O O O� � O O O N O O�� Q�� 0�0 �� � � N �' O� N N N �f � p .-� � � � � � � � � � � � � � � � ooac�o�Sa��'c�c�� � O O N O CV N�^My, 0 M p U'; O ~ ~ O N �n d' � O S� Q�� Q N CJ O O C�� � � Q� vi N C o0 c7 � 00 O o0 Q CT O � Q� 00 ��-+ V� N V1 �!' r-' �1 � G7 lT 00 �-+ Q� M N I� N t^ 00 G� C� O O M�D Q^ O '+� M M N �-+ V � �-+ N d' � c���s�c��r��c�r�ds�c� c� c� �. c o 0 0 0�n v� v� o�n o 00 Q� �n O�n O�t [� N 01 O o0 O� ����G N M� N M O M O l� ,r o � � 00000��b�0000a � o"�'o . . . . . . . . . . . . . . . d O � O O'V' O oo O 0 � O o0 O O� v� �'-+ v� �O N �t �� O��M N � N l� N � M '-+ � --w M ~ N ~ ~�O M d' O � � � � � � � � � � � � � � � � Q G7 O O Q� O Q O G7 N O N O� M V'� �G �G M O M 00 O N O d' .-� � � N � ��.w..l ri� U U ru"i� � vi v�i ..�a a W v�i � O N N�� N M 0�0 � oQ0 N� � N O� � � N t� � � .� a.. � �.+ CC bA � wp.q OA Q �+ � � � O � O � � .-. � � •�, '� •� + .� a ; � � � .� � � ¢ v�i � V � � � � ° � �' � � � � � ° � � � a on a U .� ,� � p; .� Z � a��i .� � � � � � a i •� � � � a��i a��i > > � �S °' r: � ����3oa���� .X '��� p���3�0�� � aa `. >� o o� W �3 •� y C� �,� w 8 W pq o 0 o W W �? A�� ,� � A Q •a U C� a� i; o V'� °� � C�i a; •a U U �� V•v p'' o a� � �,, GQ � N � 'U U � � «+ ..+ V A N p � N � � p 'O U � ..�+ +�-� V V A V�� '� o o`� a� � � u" '�s o � ^ o o�`� o � � �" w � � � N O o��.° V; � � o�� $� `� a�i � o� i o Q � a�i a�i o� V o� o i: � S� � O �o� �xxrr��rNoavHHv��n a wv¢ � �axUv��ruFUHv�rnv� �n H o �., � ��a ¢ z z �'' c� � O O o a•-� c� � r� ��r �n �o � � � oo v� a�- c� cn �r �n � � o0 0� �-+ N M �h ��U t� 00 G� �-+ �•- O� O•^+ �•-+ C/1 F�--� �� N N N N N N N N N N J.�1. \ J. IiLL� CITY OF ARDEN HILLS COUNTY OF RAMSEY ST'ATE OF MINNES4TA RESOLUTION NO. 2010-050 A RES4LUTION AWARDING THE LEXINGT4N AVENUE SIDEWALK PROJECT WHEF�.EAS, pursuant to advertisement for bids for the improvement of the Lexington Avenue Sidewalk Project, bids were received on Thursday, September 9, 2010, at 10:00 a.m., opened, and tabulated according to the law, and the following bids were received complying with the advertisement: BIDDER AMOUNT North Valley, Inc. $ 90,011.62 Barber Construction $ 109,620.00 Concrete Idea $ 118,225.45 Minger Construction $ 119,643.5 5 DMJ Asphalt $ 129, 816.01 AND WHEREAS, it appears that North Valley, Inc., of Elk River, Minnesota is the lowest responsible bidder at the tabulated price of $90,011.62; N4W THEREFORE, BE IT RESOLVED BY THE CITY CUUNCIL OF ARDEN HILLS, MINNESOTA: l. The Mayor and City Administrator are hereby authorized and directed to enter into a contract with North Valley, Inc. of Elk River, Minnesota, for $90,011.62 in the name of the City of Arden Hills for the above improvements according to the plans and specifications thereof heretofore approved by the City Council and on iile in the office of the City Administrator. 2. The City Administrator is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until contracts have been signed. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 13tn DAY OF SEPTEMBER, 2010. Stanley D. Harpstead, Mayor ATTEST: Patrick Klaers, City Administrator