HomeMy WebLinkAbout7D, Snelling Avenue ImprovementsI El� HILLS Re uest for Council Action q Prepared By: Matt Woodruff, Civil Engineer Council Meeting Date: September 13, 2010 � Snelling Avenue Improvements (TH 51 to �ounty Road E): Authorize consultant contract for engineering services Budgeted Amount: Actual Amount: Funding Source: $80,000 $12,593 PIR, Enterprise Funds Recommendation: Authorize staff to contract with Kimley-Horn and Associates, Inc. to provide engineering services for the Snelling Avenue Improvement project in an amount not to exceed $12,593. Supporting Documents: • Memorandum dated September 13, 2014 from Matt Woodruff, Civil Engineer • Request for Quote (RFQ) scope • Proposal submitted by Kimley-Horn and Associates, Inc. EN HILLS MEMORANDUM DATE: September 13, 2010 TU: Honorable Mayor and City Council Members Patrick Klaers, City Administrator FROM: Matt Woodruff, Civil Engineer SUBJECT: Snelling Avenue Improvements (TH 51 to County Road E) • Authorize consultant contract for engineering services Back�round/Discussion The City's Public Works and Engineering staff have initiated preliminary investigations for various roadway improvement alternatives for Snelling Avenue, from Trunk Highway 51 to County Road E. To assist City staff with this proj ect, a scope of work was prepared for completing the data collection (topographic survey), mapping the existing condition features, analyzing the existing bridge, and providing a bridge improvement recommendation. City staff reviewed proposals submitted by firms in its municipal engineering pool as well as selected surveying companies and we axe recorrimending Kimley-Horn and Associates, Inc. for this work. Proposals were submitted by the following firms. This contract will be a not to exceed cost based on actual hours spent on the proj ect. The proposal amounts are listed below: Consultant Surveying Services Bridge Services Kimley-Horn $8,670 $3,923 Bolton & Menk $10,890 $8,368 Elfering & Associates $9,900 - Anderson-Passe $14,320 - Hult & Hebeisen $29,000 - Kemper & Associates $29,500 - WSB & Associates - - City staff separated the scope of work into surveying services and bridge services and allowed the various consultants to submit proposals for the work that they wish to perform. City staff evaluated each proposal independently and recommends Kimley-Horn for both the surveying and bridge services work. City Council Meeting \�Nletro-inet\ardenhills�PR&PW�.Engineering\Council_Actions�2010\9-13- l OMemo_SnellingAve_ConsultantRFQ.doc Page 1 of 2 Kimley-Horn is experienced in municipal street reconstruction proj ects, Minnesota State Aid design standards, bridge evaluation and design, storm water management, and underground utility design. Kimley-Horn has also recently been working with the City on the Elmer L. Anderson Memorial Trail Connections Proj ect and the County Road E Bridge Improvements. City staff has had a positive experience with this firm and feels the proposal that has been submitted best meets the intent of the proj ect and the City's needs. Financial Implications Engineering services will be paid for from the PIR Fund and Enterprise funds; these fees will be incorporated into the total proj ect cost that will be assessed back to property owners and potentially funded by State Aid dollars. The breakdown of proj ect fees is attached in the proposal submitted by Kimley-Horn & Associates, Inc. A total of $80,000 was included in the 2010 CIP for the completion of the scoping document analyzing alternatives and the subsequent feasibility study. Approximately 60% of the budget is anticipated to be spent on the scoping document including geotechnical investigation, Kimley-Horn services, and the City of Roseville engineering staff. The remaining budget will be reserved for preparation of the feasibility study once an alternative is chosen. Council Action Requested Motion to authorize staff to contract with Kimley-Horn & Associates, Inc. to provide engineering services for the Snelling Avenue Improvement proj ect in an amount not to exceed $12,593. City Council Meeting \�Metro-inet\ardenhills�PR&PVV�Engineering\Council_Actions�2010\9-13-1 OMemo_SnellingAve_ConsultantRFQ.doc Page 2 of 2 �.�.��� r�•� Request for Quote: Old Snelling Avenue Improvements The City of Arden Hills is seeking quotes for engineering services to assist the City in preparing a preliminary proj ect report for the improvements to Old Snelling Avenue, from County Road E to TH S 1. Please refer to the attached location map. In order to prepare the proj ect report, the City would like the consultant(s) to conduct a topographic survey, create a base map, prepare a design recommendation and cost estimate for a culvert/bridge structure, and provide general engineering services on an as-needed basis to assist the City with the report preparation. Construction for this improvement project could start as early as 2012. This RFQ is divided into the following separate Schedules for professional services: I. Schedule 1— Topographic Survey & Base Mapping Services II. Schedule 2— Engineering Services You may submit an RFQ to the City for one or both of the Schedules listed above. The City will consider awarding the described work in Schedule 1 and Schedule 2 separately, to the most qualified consultant or consultants. GENERAL PROJECT SCOPE The Arden Hills City Council has identified the referenced segment of Old Snelling Avenue as a State Aid roadway that is in need of improvement. The City Council has authorized Staff to investigate various reconstruction/resurfacing alternatives for the roadway and provide a report to the City Council that describes the alternatives, associated costs, and financing. This segment of Old Snelling Avenue is approximately 4,300 feet long and lies within a 200-foot right-of-way. The projected 2011 Pavement Condition Index (PCI) for the roadway is 7. REQUIRED SERVICES DESCRIPTION I. Schedule 1— Topo,�aphic Survev d� Base Mappin� Services: The City will hire a separate consultant for the soil analysis for the proj ect area. The final report will be distributed, once it is completed. The Consultant should complete a topographic survey for the Qld Snelling Avenue segment listed above. 1. C4NTROL POINTS Set up control points on the proj ect. Control points should be placed beyond expected construction limits so that they can be utilized during construction. Enough control points should be placed on the proj ect so that if certain control points are vandalized or otherwise lost, the control can easily be re-established. Control points should be set up using Ramsey County coordinates. City and County benchmarks should be utilized for vertical control. A copy of the benchmark information is available in the Public Works Department. 2. UTILITY L�CATI4N Call Gopher State to assemble utility information which shall be incorporated on the base mapping. The selected consultant shall also incorporate City utility as-built drawings into the base mapping. As-built drawings will be provided to the consultant. 3. CROSS-SECTION DATA Provide cross-section point data at 50 foot stations, all driveway locations and where the topography changes between 50 foot stations. At a minimum the cross section data should extend 10 feet beyond the right-of-way. As necessary due to the topography changes beyond the right of way, additional shots may be necessary. At driveway locations the cross sectional data should extend to the garage or driveway termini. Included in the cross sectional data should be existing street centerline, roadway edges (top and bottom bituminous curb shots), top and bottom of retaining walls and every change in grade of the cross section. Enough shots must be taken to provide an accurate and complete TIN. 4. TOPOGRAPHIC FEATLTRES Provide shot data for all topographic features including but not limited to trees, treeline, mailboxes, driveway edges, landscape edges, private and public utility locations, house corners adj acent to street reconstruction, roadway edges, street signs, property corners, light poles, flag poles, bridges, water surfaces, and retaining walls. Locate and provide shot data for all property corners adj acent to the street construction. Provide gutter shot data for the cul-de-sacs. 5. BASE MAPPING Utilizing CAD software that is compatible with the latest version of AutoCAD, create the base map for the proj ect. The base map should be created to show all topographic features from the field data. Create a TIN model for the proj ect area and create an AutoCAD layer for contours. The consultant may use their standard linetypes and symbols. Upon completion of the proj ect, electronic files shall be provided to the City, along with plot files or other supporting data. In addition, the consultant shall provide 50 scale plan and profile drawings to the City in electronic PDF format. II. Schedule 2— En�ineerin� Services: A. Culvert/Bridge Structure Analysis & Recommendation: At the south end of the proj ect near TH 51 there is an old culvert/bridge structure that spans approximately 20-feet over a wetlandlwaterway area. It is anticipated that proposed project may remove this structure and reconstruct a new structure that meets State Aid design requirements for the roadway. The new structure must have sufficient width to accommodate a State Aid roadway section as well as an 8-foot wide pedestrian pathway. The following services are desired: l. ANALYSIS OF EXISTING STRLJCTLTRE The consultant shall perform necessary inspections and/or evaluate Ramsey County annual inspection reports to determine and provide the City with an analysis of the structure's current condition. The City may explore a roadway improvement alternative by leaving the existing structure in-place depending on the consultant's analysis. In addition, the consultant shall provide the City with the potential beneiits and drawbacks for leaving the existing structure in-place. 2. STRUCTURE RECOMMENDATION The consultant shall provide a recommendation for the culvert/bridge replacement and perform the necessary preliminary design calculations, including a preliminary hydraulic analysis of the tributary surface water system, to create an Engineer's Estimate of probable cost for a new structure. The City will provide the consultant with soil borings obtained near the existing structure. Lastly, a list of all applicable permits needed for the structure replacement must be provided to the City. 3. ENGINEER' S ESTIMA.TES The consultant shall deliver separate lump sum cost estimates for removing the existing structure and installing, complete in-place, the new recommended structure. All incidental construction costs associated with these separate lump sum items must be considered. The consultant shall provide contingency and overhead recommendations for 2 the separate lump sum items. It should be understood that the contingency will recognize the preliminary nature of the estimates provided. B. Additional Engineering Services (as-needed): After the consultant has delivered all components described in above, the City of Arden Hills may require the consultant to provide additional engineering services on an as-needed basis to assist with the completion of the preliminary proj ect report. It is anticipated that the selected consultant could assist with State Aid roadway design, storm water management, storm sewer design, recommendations for meeting various agency permit requirements, and engineering cost estimates. The consultant shall provide the hourly rates for staff inembers who would potentially provide the additional services described. The consultant will not be reimbursed for additional services that are not previously authorized in writing by the City of Arden Hills. Proiect Schedule The following is the proposed schedule for the proj ect. RFQ submittals due: City Council to award contract to consultant: Kick-off ineeting with City Staff: Completion of Survey & Structural Analysis: Provide hourly services as-needed: City Staff presents report to City Council: September 3, 2010 (by 11:30 AM) September 13, 2010 Week of September 20, 2010 October 15, 2010 October and November November 29, 2010 This schedule is approximate and subj ect to change. PROPOSAL CONTENTS The proposals should include a proj ect scope, proj ect understanding, schedule, proposed team, a cost breakdown including hours budgeted to each task and hourly rates. If resumes of staff on the proposed design team were not submitted with the Statement of Qualifications, June 2007, please provide with the proposal. Please include sub-total hours and costs for each of the maj or tasks: Topographic Survey, Mapping, and Culvert/Bridge Recommendation. The Consultant shall provide a not-to-exceed total cost for the proposed proj ect services. As mentioned, you may submit an RFQ to the City for one or both of the Schedules listed above. The City will consider awarding the described work in Schedule 1 and Schedule 2 separately, to the most qualified consultant or consultants. Please provide your proposal by 11:30 AM, Friday, September 3, 2010. Proposals may be submitted via e-mail. If a paper copy is submitted, please make double-sided copies, do not bind the proposal, and be concise with your response. Address submittals to: Matt Woodruff, PE Civil Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 matt.woodruff�a ci.roseville.mn.us The City of Arden Hills reserves the right to rej ect any or all proposals at the full discretion of the City. �' � ,� . � � � ;� � � September 3, 2010 Mr. Ma�t Woodruff, P.E. Civil Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, Minnesota 55112 Re: Quote for Old Snelling Avenue Improvements Dear Mr. Woodruff: � Suite 345N 2550 University Avenue West St. Paul, Minnesota 55114 Kimley-Horn and Associates, Inc. is pleased to submit this quote to the City of Arden Hills for providing engineering services to assist the City in preparing a preliminary proj ect report for the improvements to Old Snelling Avenue, from County Road E (CSAH 15) to Trunk Highway 51 (TH 51). Project Understanding Kimley-Horn understands that the segment of Old Snelling Avenue from County Road E to TH 51 is a State Aid Roadway (MSAS 111) that is in need of improvement. The segment is approximately 4,300 feet long and lies within a 204-foot right-of-way. Bridge 4627 is located at the south end of the project near TH 51. The City is hiring a consultant to assist with topographic survey and mapping for the future roadway improvements and with assessment of potential bridge construction costs. Bridge 4627 is a concrete slab bridge spanning 20-feet over a drainage ditch and was constructed in 1926. The structure crosses the Lake Josephine discharge channel that flows to Lake Johanna. Annual safety inspections of the structure have been provided by Ramsey County; the last inspection occurred in June 2009. We understand that improvements may include removal of the structure and reconstruction of a new structure that meets State Aid design requirements for the roadway and structure. We understand the new structure must have sufficient width to accommodate a State Aid roadway section as well as a shared-use path adj acent to the roadway. We understand the City will provide a geotechnical investigation of the subsurface soils within the project under a separate contract. Project Scope Kimley-Horn will provide the services specifically set forth below based on our understanding of the proj ect. TEL 651 645 4197 FAX 651 645 5116 Mr. Matt Woodruff, P.E., September 3, 2010, P. 2 Task 1: Topographic Su�vey This task consists of providing a topographical survey of the proj ect area, including setting up control points, locating utility information, and providing cross-section point data at 50 foot stations, and all driveway locations. Shot data will be provided for all topographic features. We understand the RFQ states that the cross section data should extend 10 feet beyond the right-of-way. There is significant cost associated with extending the topographic survey this far beyond each edge of the roadway. We have modified the survey limits to extend to the existing tree line only, therefore reducing the survey costs for the proj ect significantly. We feel this is a prudent change given that it is very unlikely the roadway section would be widened due to the low ADT on this roadway. Task 2: Base Mapping The base map for the proj ect will be created to show all topographic features from the field data, utility locate information, and City as-built drawings. A TIN model and contours will be created for the proj ect area. We will provide the City with electronic files and 50-scale plan and profile drawings. 4ur subconsultant, E.G. Rud and Sons, will provide the scope of work for Task 1 and 2. Task 3: Bridge �tecommendation As a part of this task, we will provide an analysis of the existing structure (Bridge 4627), a recommendation for rehabilitation or replacement of the structure, and an estimate of the anticipated construction costs of the bridge reconstruction. Specifically, Kimley-Horn will conduct a field visit of the bridge to verify the Ramsey County inspection information. The site observations will be performed by Matt Jensen, P.E. a certified bridge safety inspection team leader. We will conduct a preliminary hydraulic analysis of the existing waterway to identify the anticipated 100- year water surface elevation and flow rate at the existing bridge location per the most recent flood insurance study. Based upon this field visit, hydraulic study, and the Ramsey County safety inspection information, Kimley-Horn will provide a technical memo describing our findings for two bridge alternatives. The memo will include the advantages and disadvantages for structure rehabilitation compared to structure replacement and a recommendation for the preferred alternative. We will prepare one preliminary engineering estimate of probable construction cost for the preferred alternative. This cost estimate will include bridge construction costs including demolition, bridge replacement, and other associated bridge construction costs. Project contingency and indirect costs will be included in the estimate. The permits required to rehabilitate or reconstruct the bridge will be identified as part of the evaluation process, since the permits may affect the project costs. For example, the waterway in which this bridge crosses has an associated FEMA floodplain that if Mr. Matt Woodruff, P.E., September 3, 2010, P. 3 impacted could require a Conditional Letter of Map Revision (CLOMR}. The permits and review agencies for each alternative will be identified and estimated costs for completing the necessary applications, fees, and reviews will be provided in the technical report. Additional Engineering Services We understand the City may require assistance with the proj ect once the initial proj ect scope is completed. Any services not specifically provided for in the above scope will be billed as additional services and performed at our then current hourly rates. Additional services we can provide include, but are not limited to, the following: • State Aid roadway design � Storm water management • Storm sewer design • Permitting • Proj ect Funding Applications (Bridge Bonds) • Structural design • Floodplain analysis and surveying Project Team The Kimley-Horn team has significant local experience in bridge evaluation and design, permitting, and surveying. Primary members of the Kimley-Horn team are as follows: Beth Engum, P.E., Project Manager Beth Engum will serve as the project manager and primary contact throughout the proj ect. She has over 10 years of experience in the design and construction of numerous roadway and municipal infrastructure improvement projects for local agencies. 1V�att Jensen, P.E., Structural Enginee� Matt Jensen has assisted municipalities in procuring bridge funding dollars from Mn/DOT and designed several bridge replacement projects for local agencies. He has designed new overpass structures and provided safety inspections and construction phase services for numerous structures throughout the metro area. Matt will provide structural inspection expertise and bridge cost estimating. Matt is certified by Mn/DOT for bridge safety inspection and has inspected over 160 bridges in the metro area. Beth Kunkel, PWS, Enviro,nmental�'�Yetland Specialist Beth Kunkel has 23 years of hands-on environmental documentation, wetland delineation, analysis, and permitting experience in the metro area. Beth has built an excellent reputation with local agencies including the Rice Creek Watershed District, Army Corps of Engineers, and DNR, and has recently completed the CLOMR process for Arden Hills on a different project. She knows the regulatory staff involved and what it takes to obtain their approval for this type of proj ect. �r. i����� '����ru�'�� .��.�'a., ..����������er �� �� l C�, ��: 4 ��`������� ����� �.���������r� ���� ���•:�`�r� ��+� ��r����� �� '��s�� � � � �� �. ����r_��� �1�.�� ������� b���� ����� ��� n���.����� �a��►r ��� ������ b�lo�r< "���� t��r���r T��� ���ir����� ��� � �`��o�r�p��� ��.����� ��� � �� � ���� ������� ��,��� � �ri� � �.�������d�.���� ��,��� � ����t���:� � � � �.�3 ����:���•��b�� ��� �r��~�;� ���� __ __ _ _ '����� :���������� �+��� ��.�,��� '�:'�.� ����.�r�:u�. ���� �a�'��� ��•������ ��+��e�� ���•�r���s is ���,���. �. n���•� ����.�i�d �����:�r� �:�� ��;��• ���������. ���t� �� �.fi��.����, ��:������ ����� �i�� �c�� ��c��� ��� ������ ���i����� ��ba� ��� s��°�� �����t�� �.�.�tl���i������ ������. ��� ��i�r��. �� ���c��.�+��t�� �r� ��� �.:��C�:� ��� �c������� ��.��� ��� �t�.f�� ���b�r� ��.� �au.ld �����.�i���� �r����� ��� ���I��i��:��. ��������� d����•i��� �.���� ���� ����:������ ������� �����'��� `�� �r�:�l ��«����� ���� ��������� �� �����i������� �� ��•�c����.���-�i��. ��i� ���.� ���" �n.��t�:�.� �1�� �`�ll��i�.� �����d�1�� �'�i���•��� �� ����u���:r�� .�;����Y���d �������':�����n.�;`�r���� !���� ����'�` ��r���������� €��' �������y t� ��������..���� �r��.���i� :��•c���.��: ����.�r�� ��r�i��� ,�.��n����� ���� ����`� �������:�� �.����� �� ���� ������� ������� ���W � � � 2� �: � �'��� c���' �������1���� ��, ��! � � ����b�r � �� �� :� Q �������• ��� �o�����r �4 � Q �������.���� ��� �� �. � �'��:�� �r��� �►����� �"��r �c�n����r���� �.i����-���tr�x �'�'� l�a��. �`ca���r�. �� b����,� r�� ���e��•��. ��.i�� �� �. ������s�`�.�. ��r�;j��� ���� �.s �� ���.v� �� p����ri��� ������t ���1� �h� ��t�. ������ ���.v� �r�� ��������:�� ����r����� ���� ���������� ������ �� �.�� ���i���� �� ����. ����������� ��������i�►�� ���� ;���+�����:��, ���. ��. �....� . ... ,� .�. - . f. ... �, � � . ..y' :: .. :. ... ��� `F vY � . �'� �„H.,`�� 3 ....� � �r p�:,������ � ���� �:. �n�����n, �. �� � . ��r��, �'.:� , ��c�,���� ��n�����l���c��i��� �� �������.��.� �,,������r�:���s: +���� ��•��kd��� ������.al� �� R��.t�� � H � Ul� . z � � � � � � a � � O � �.�. a � o ��a � --� z ;� Ll.i ...� � _ � �_ � � � � � � W J � � � � ''� ..� � �C � � � .. � W m � � � � � {� W �- � GC � L� a. � ,_,� �."' w �3 C� C�.} n°C. _ � � Q � F-- � O= I-- Q _ � H J � � f-a- U O F-- i-- Q J 0 � � (/� � Z � OW U m � � w� �- w Qw � o� Q �z �w � � W OW Z w C� c/3 Z W U W W C') � Z � Q � � � o� w °" � � H :: d' O M d' tn E�Ct:: N M < �O�MO �. 'd'O�NO:00; �'OMd'� t0;. �} � � � ....w: N +M 6� f�}. �: � NCUNMd' 1'� �- c�: ` cv d- r- r�. � � � � z :o � � � o � '�n ��_- W � � c �.Lc�Q ���v N::: Q a� � � t� c�� � � �_' � -a cn � LL N p :� :�, �uW�=�W:.: t� . 0o���L� � tn � C N �: 'cn � � .Q. � Q0 v � = c �,.;;: !r'� C .� N � • � (� . �`'Q�na-�w �: � �. '� r- N M : �:: :i�- M cM M V�: ... :. �': 0 d' AO �. � �, . ti � W. �: � �: �:. � Z� �. E� W`' F-- o.: C�: �C i�; u.�: '1�- W: �. J W: m � Q: t� CC�►►: � �: �: o�; :m _ � w� � O � N � M � � City of Arden Hills Kimley-Horn and Associates, Inc. Schedule of Rates Effective January 1, 2010 through December 31, 2010 Classification Rate Administrative Assistant CADD Technician Clerical C lient Manager Drafter Field Technician I Field Technician II Graduate Eng./Planner I Graduate Eng./Planner II Principal Project Engineer/Planner Project Manager Senior Administrative Assistant Senior CADD Technician Senior Designer Senior Field Technician Senior Project Manager $ 77.50 $ 50.00 $ 62.50 $170.00 $ 60.00 $ 92.50 $100.�0 $ 92.50 $102.50 � 190.00 $110.00 $13 0.00 � 9s.00 $ 90.00 $110.00 $115 .00 $145.00 Reimbursable expenses (copy/printing charges, plotting, mileage, delivery charges, faxes, etc.) will be charged as an office expense at 6.0% of the labor fee. Any subconsultant charges will be excluded from the office expense and will be passed directly to the Client with no Kimley-Horn markup. Additional rates may be negotiated at a later date for classifications or services not included above. D.N.X07