HomeMy WebLinkAbout10-19-10 PTRCChair:
John Peck
Committee Members:
Cindy Garretson
Y 9
Jod Hil ers Nancy O'Malley
Harold Petersen
Steve Scott
Rich Straumann
Council Liaison:
David Grant
AR,EN HILLS
1245 W. Highway 96
Arden Hills, MN 55112
651.792.7800
W�•ci.arden hills.mn.us
Parks, Trails, and
Recreation Committee
October 19, 2010
6:30 p.m.
Arden Hills City Hall
City Vision
A strong community that values our unique environment, our fiscal soundness,
and our tradition as a desirable city in which to live, work, and play.
Agenda
* *All members should bring their P & R Facility Inventory Manual for reference
Call to Order
1. APPROVAL OF THE AGENDA
2. MINUTES
A. September 21, 2010 Regular Meeting
3. UNFINISHED BUSINESS
A. Elmer L. Andersen Memorial Trail Dedication Ceremony Recap
B. Buckthorn Removal Day — October 30, 2010 — Hazelnut Park 9:00 a.m. -1:00 p.m.
C. Project Updates
1. Safe Routes to School Activities
2. Lexington Ave. Extension /Resurface
3. CP Rail Pedestrian Pathway
4. County Road E Bridge
D. Review Revised Park Maintenance Plan
E. Other Unfinished Business
4. NEW BUSINESS
A. Committee chair for 2011
B. Facility User Fee Discussion
C. Capital Improvement Plan Discussion
D. Other New Business
5. REPORTS
A. City Council Report
B. Public Works /Parks and Recreation Report
6. NEXT MEETING
A. November 16, 2010 — 6:30 p.m.
A quorum of the City Council may be present at this meeting.
Agenda Item 2A:
Minutes for Approval: September 21, 2010
EN HILLS
CITY OF ARDEN HILLS
PARKS, TRAILS AND RECREATION COMMITTEE MEETING
TUESDAY, SEPTEMBER 21, 2010
ARDEN HILLS CITY HALL
CALL MEETING TO ORDER
Chair Peck called the September 21, 2010, meeting of the Parks, Trails and Recreation Committee to
order at 6:34 p.m.
MEMBERS PRESENT: Chair John Peck, Committee Members Cindy Garretson, Harold Petersen,
Steve Scott, Rich Straumann, and Nancy O'Malley.
OTHERS PRESENT: Park and Recreation Manager Michelle Olson and Charles Kachel.
MEMBERS NOT PRESENT/EXCUSED: Council Liaison David Grant and Committee Member
Jody Hilgers
1. APPROVAL OF AGENDA
MOTION: Committee Member Garretson motioned and Committee Member Petersen seconded
a motion to approve the agenda as presented. The motion carried unanimously.
2. APPROVAL OF MINUTES — June 15, 2010
MOTION: Committee Member Scott motioned to approve the June 15, 2010 minutes seconded
by Committee Member Garretson. The motion carried unanimously.
3. UNFINISHED BUSINESS
A. Elmer L. Andersen Memorial Trail Signage
Ms. Olson indicated they had been working with Serigraphics on the design and are now
working with IZones (who produce the panels for the signs) on converting the computer
prints to digital so the panels can be completed by September 24. Once completed, the
panels will be put on the sign structures and will then be installed by early October. Ms.
Olson informed that the dedication ceremony is set for 5:00 p.m. on October 14 at the
Glenpaul /Cleveland trail head. Chair Peck questioned who would be invited to the
ceremony. Ms. Olson indicated she is currently working on the list, which includes the
PTRC and Council members. She indicated that Derrek Haines is doing a lot of work on
designing the invitation and doing landscaping at both sites which he has been
coordinating with Emily Andersen. Ms. Olson indicated they will also be putting
together a press packet which will provide the press with some background history. Ms.
Olson mentioned that Emily Anderson will be giving away bookmarks with bio
information on Elmer L. Andersen.
Parks, Trails & Recreation Committee Meeting Minutes September 21, 2010
Page 2
B. Valentine Park Drainage Update
Ms. Olson indicated that per PTRC's recommendation, the Council approved expenditure
for a second opinion on the drainage study for Valentine Park and directed staff to get
quotes from other firms in the engineering pool that have hydrology expertise. The
Public Works Director acquired three quotes and the lowest bid was from Bolton and
Menk and they are currently looking at the report findings to determine if it is accurate
and if the proposed improvements are workable. Ms. Olson indicated that Bolton and
Menk may have the study completed by the end of the week in hopes findings could be
presented to Council on October 18 and then to the PTRC the following day. Chair Peck
asked Ms. Olson to e -mail the PTRC members on an update of when Bolton and Menk
would be presenting to Council so that they would be able to attend.
C. Project Updates
1. Elmer L. Andersen Memorial Trail Connections /Safe Routes to School:
Ms. Olson provided an update on the Safe Routes to School Ribbon Cutting
Ceremony which took place September 14 and indicated that all the funding partners
were present. She stated that the trail is complete and the contractor will need to
complete a punch list of repairs /improvements in the next few weeks. Chair Peck
questioned the expense of putting a plastic post in the middle of the road to make
people aware of the crossing. Ms. Olson indicated that would need to be approved by
the County. Chair Peck asked Ms. Olson to see if the County would approve the
plastic post. Ms. Olson indicated they would also like to put a sign at the crossing b
g g Y
the school, since there is no light, in order to make people aware of the crossing. Ms.
Olson mentioned that there was also a non - infrastructural portion of the grant in the
amount of $1,000 and she is working with the Phy Ed teacher to provide educational
and incentive programs with this money. She indicated the teacher will be doin g an
Incentive Walking Program and is encouraging students to walk the trails before and
after school. They are also planning on doing a walk to school day where all the
buses drop off at either Perry Park or the library and the students then walk to school.
2. Lexington Avenue Extension/Resurface:
Ms. Olson indicated they went out for bids for two portions of Lexington Avenue, the
p g
concrete sidewalk by Shannon Square /Cub area from the railroad tracks to Grey Fox
Road and then the replacement and recycling of the bituminous pathway from
Cummings Park Drive all the way to County Road F. The construction period will
be approximately two weeks. They will be assessing Inland, who is the ro ert
p p Y
owner, 50% of the cost which is approximately $27,000. Committee Member
Petersen stated he has a concern over the planted island that parallels both the north
and south point of Shannon Square and does not feel there is width for a sidewalk.
Ms. Olson informed it would be an 8 foot sidewalk that would go straight across the
entryway and indicated that Public Works Director Maurer and Engineering Intern
Woodruff have been working on that.
Parks, Trails & Recreation Committee Meeting Minutes September 21, 2010
Page 3
3. CP Rail Pedestrian Pathway:
Ms. Olson indicated that the CP Rail Pedestrian Pathway was under construction.
The committee members expressed concern on how slow the construction was
progressing. Ms. Olson informed them that part of that was due to the railroad not
providing a flagman which was required for some of the work. She stated that the
contract states the construction would be done within 8 weeks and that concrete pillar
work would be done this week.
4. County Road E Bridge:
Ms. Olson indicated they are continuing to work with Mn/DOT on replacement of the
bridge. She indicated this is still in the scoping and that the last e -mail from Mn/DOT
indicated the project is still in the schedule. Ms. Olson indicated it looks like the
replacement will take place and the only question now is what year it will be done.
D. Hazelnut Park Property Lease/Purchase
Ms. Olson informed that the City Council met with the church on September 20, 2010.
The church indicated they did not want to sell any portion of the parking lot but would
like to sell the parcel that is in front of the picnic shelter and the soccer field area. The
Council discussed this at the CIP budget meeting and felt it would be difficult to develop
that area taking into account the restrictions of the site and the amount of green space the
church is required to have. The Council believed an offer of $174,000 would be
adequate. The church, however, was not in agreement with that number. Ms. Olson
stated that after further discussion it was decided that the best possible use of the property
would be for a park area. Staff will now be doing research on what park land is worth
and then will hold a Closed Session to negotiate with the church. She believes the
Council is interested in at least discussing the idea of purchasing the park area and would
put something in the deed that would give the City access to the parking area if the land
transfers. Chair Peck inquired as to the church's motivation for selling the land. Ms.
Olson stated the church indicated they have a surplus of land that they are not using and
they could use the money for some upgrades /repairs.
4. NEW BUSINESS
A. Buckthorn Removal Day
Ms. Olson asked if the committee was interested in having a Buckthorn Removal Day
and if so asked the committee to help with the event. Discussion ensued on a date for the
event and which park should be considered for buckthorn removal. Committee Member
O'Malley motioned to do the buckthorn removal on October 30, 2010. Committee
Member Garretson seconded the motion. The motion was unanimous.
B. Committee Terms & Recruitment of New Members
Ms. Olson informed Chair Peck and Committee Member Hilgers and Straumann that
their 3-year terms expire the end of this year. She asked that they notify her before
December on whether they would like to run for another 3-year term. Ms. Olson also
asked that the committee members recruit new members since we have seven
members currently and the Committee can have up to 12 PTRC members. Chair
Peck believes he may have some recruits since there is a heightened interest with the
Parks, Trails & Recreation Committee Meeting Minutes September 21, 2010
Page 4
construction going on. Committee Member Scott asked if they could recruit high
school students. Ms. Olson indicated they could recruit high school students if they
wished.
C. Bench Implementation Plan
Ms. Olson gave a recap on the Bench Implementation Plan whereby Council approved
$5,000 each year for new benches for a 4 -year term. She indicated eight benches were
ordered this past year and six of those were placed this past weekend as part of an Eagle
Scout Project. Ms. Olson indicated that a couple of Council Members indicated that they
installed one or two of the benches nstalled along the new Venus trail should be removed
because it was in too close proximity to other benches. She indicated that there are no
benches on the segment of the trail along Lift Station Road going to Perry and that a good
g
portion of that is Ramsey County property. Ms. Olson questioned whether they wanted
to fund a bench that is essentially on Ramsey County property or whether Ramsey
County should be responsible for placing benches at those locations. Ms. Olson indicated
she would check with Greg Mack from Ramsey County to see if they were opposed to
having benches in the Ramsey County open space. She asked the committee's opinion
on where they should place the bench that will be moved. She indicated that Valentine
Park was suggested but did not feel that would be a good idea since the bench would
have to be moved during the Valentine Park improvements. She indicated that if Ramsey
County is in agreement they could put the bench along the new Perry Trail or along Lift
Station Road. Discussion ensued on which of the three benches to move and the new
location of that bench. The committee felt the bench closest to E2 should be the one to
be moved and that a good location would be before the fence half way up the hill on the
new Perry Trail. Ms. Olson asked the committee to assist in the placement of the benches
for 2011.
MOTION: Committee Member Straumann moved that in the spring of the next 3 years
of the bench implementation plan, the PTRC be involved in recommending the placement
of park benches to staff. Committee Member Scott seconded the motion. The motion
carried unanimously.
5. REPORTS
A. City Council Report & Public Works/Parks & Recreation Report
Ms. Olson stated that Council is working with Mn/DOT on 694/Hwy 10 Improvement
Project. There was a public hearing where the public spoke that Mn/DOT had not
pedestrian improvements within the plan. Ms. Olson indicated she had met with Greg
Mack and he indicated they would like to see the entire 694/35 corridor looked at for
pedestrian biking. Mn/DOT is forming a pedestrian study group to discuss that corridor.
She stated one of the other concerns about the improvements is noise walls. Mn/DOT
could cost share in the building of noise walls. The County is also agreeable on
upgrading the Lexington Avenue intersection so it can accommodate more traffic.
Ms. Olson indicated that one item the PTRC will need to discuss is facility user fees. She
will be working on putting an analysis together.
Parks, Trails & Recreation Committee Meeting Minutes September 21, 2010
Page 5
Ms. Olson informed that Terry Maurer was hired as the new Public Works Director.
Ms. Olson mentioned that Celebrating Arden Hills was held this past Saturday and it
went very well and that the next scheduled event will be the Elmer L. Andersen
Memorial Trail Celebration on October 14, 5:00 p.m. — Glenpaul /Cleveland trail head.
Committee Member O'Malley asked whether they could add "Park Water Fountains" to
the next agenda. She indicated that some parks do not have any water fountains and
should especially if there is a basketball court. Ms. Olson indicated they could add to the
agenda but that some of the parks do not have water connected to them and to add a
fountain to a park that does not have water would be costly.
6. NEXT MEETING
A. The next meeting is scheduled for October 19, 2010, at 6:30 p.m.
7. ADJOURNMENT
Committee Member Garretson moved to adjourn, seconded by Committee Member O'Malley.
The meeting adjourned at 7:55 p.m.
Agenda Item 3D:
Review Revised Park Maintenance Plan
EN HILLS
PARKS MAINTENANCE
MANAGEMENT PLAN
DRAFT: October, 2010
TABLE OF CONTENTS
Goals 1
Parks & Trails Facility Grid 2
Park Management Program 3-7
Arden Hills Park Level Listing 7
Operations and Maintenance Calendars 8 -10
Facility Inspection Forms — Site Specific . 11 -24
Sample Playground Inspection Form . 25
Playground Equipment and Mulch Replacement Schedule 26
Hard Court/Tennis Court Replacement Schedule 27
0
GOALS
1. Establish parks maintenance standards.
2. Develop a comprehensive maintenance classification system.
3. Achieve greater consistency in maintenance programs.
4. Develop a more systematic approach to planning and scheduling.
5. Develop standardized methodologies and quality indicators.
6. Improve efficiency of maintenance operations.
7. Enhance productivity of employees.
8. Upgrade functionality, safety, and appearance of facilities.
9. Extend operation "life time" of facilities, and develop a comprehensive replacement
program.
10. Develop a comprehensive capital replacement program.
1
S
Arden Hills Parks & Trails Facilities
Acres
Softball/
Baseball
Field
Soccer
Tennis
B'ball
Court
Area
Play
Equip.
Picnic
Shelter
Warming
House
Permanent
Restrooms
Hockey
Rink
Skating
Rink
Trail(s)
Arden Manor Park
4601 Prior Avenue
2.5
•
Arden Oaks Park
1413 Arden Oaks Drive
1.5
Charles Perry Park
3700 New Brighton Road
20
N
U
N
U
U
R
Crepeau Nature Preserve
1224 Harriet Avenue
12.5
U
Cummings Park
1220 Wyncrest Court
17.5
■
■
■
■
U
U
U
U
U
Floral Park
1423 West Floral Drive
20
U
U
U
U
U
U
Freeway Park
1370 West County Road E
1
U
U
U
U
U
Hazelnut Park
3301 New Brighton Road
12
U
U
U
U
U
U
U
U
U
U
Ingerson Park
3255 North Lexington Avenue
5
U
U
U
Johanna Marsh Park
3168 Ridgewood Road
8.5
U
Lindey's
North Snelling & County Road E
1.5
Royal Hills Park
Snelling Avenue/McClung Drive
4.5
U
U
U
U
U
Sampson Park
1900 Lake Lane
1
U
U
Valentine Park
1650 West County Road F
3
U
■
■
■
U
U
1;1
S
Arden Hills Parks & Trails Facilities
Parks Management Program
A four level system designed for identifying and/or prescribing specific levels of cultural
treatments to turf and grounds to achieve desired goals based upon the intensity of use, public
visibility, and aesthetic considerations. The following are a description of this system.
LEVEL I
This highest level of maintenance is performed at our large community parks and /or athletic
complexes. Turf areas subjected to frequent and intense levels of use throughout a majority of
the growing season. Commonly associated with athletic field sites programmed for organized
sports. Maintenance at this level maintains the park or facility at a standard sufficient to ensure
a well -kept appearance. Maintenance issues & concerns are given a high priority. Parks
categorized in this level:
CUMMINGS, CHARLES PERRY, HAZELNUT
1. TURF CARE. Premium quality turf management under a program of intense cultural
treatments. Mowing to take place every three to five days. Aeration as required, not less than
two times per year. Trimming to take place weekly at a minimum. Top dressing, seeding, and
sodding as needed.
2. FERTILIZER. Turf is fertilized three times per year. Broadleaf and other weed control as
needed, usually two times per year
3. IRRIGATION. Systems to be used and in good repair as to conserve water and irrigate only
when needed to maintain high quality turf, usually done every two to three days. Systems are
monitored daily during peak season. Maintenance activities include head repairs & adjustments,
nozzle replacement, flow adjustments and vandalism repairs.
4. GARBAGE AND LITTER. Garbage and litter is picked up daily, subject to variability based
on weather and scheduled uses. Extremely high visitation may increase frequency.
Y . q Y
5. RECYCLING. Recycling bins will be placed at the picnic pavilions /shelters and all ballfields.
They will be picked up at the same time as the garbage and litter.
6. PRUNING. Frequency dictated primarily by species and variety of trees and shrubs.
7. LIGHTING. Damaged systems should be repaired as quickly as they are discovered. Bulb
replacement should be done during the first working day after the outage is reported.
8. SIGNS. Signs that are fully exposed and south facing could be painted every 8 years or so.
Borders can be recoated every 3 years or so. Posts can be recoated every 2 -3 years.
9. SURFACES. Sweeping, cleaning, and washing of surfaces needs to be done so that at no time
does an accumulation of sand, dirt, glass, or leaves distract from the looks or safety of the area.
Repainting or re- staining of structures should occur when weather or wear deteriorate the
appearance of the covering. Graffiti should be washed off or painted over by the next working
day.
3
10. REPAIRS. Repairs to all elements of the design should be done immediately upon discovery
provided replacement parts and personnel are available to accomplish the job. When disruption
to the public might be major and the repair not critical, repairs may be postponed to a time period
which is least disruptive.
11. INSPECTIONS. Inspections of this area should be done daily by a staff member, and proper
forms should be filled out.
12. FLORAL PLANTINGS. Flowers and shrubs weeded a minimum of twice a month or more as
needed. The desired outcome is weed -free. Fertilize as needed.
13. REST ROOMS. Permanent rest rooms, when open to the public should be cleaned daily.
Portable rest rooms should have regular servicing by an outside contractor. However, if any
servicing is noted, it should become a priority of staff.
14. PARK AMENITIES. Includes items such as fountains, flag poles, parking and crowd control
devices, benches, tables, flags and banners. Maintenance requirements can vary drastically, but
for this level, it should be of the highest possible order.
15. PLAY STRUCTURES. Playground areas are monitored daily and inspected monthly. High
priority to fix or remove hazards due to high use by small children.
LEVEL II
This level of maintenance is performed at smaller neighborhood parks. Maintenance at this
level insures that the park remain clean & safe, while forgoing more specialized and customized
care. Turf areas generally subjected to moderate levels of use and often associated with high
public visibility. Maintenance issues & concerns are evaluated on a case by case basis, with
safety items receiving highest priority. Parks categorized in this level:
ARDEN MANOR, ARDEN OAKS, FLORAL, FREEWAY, INGERSON, ROYAL HILLS,
SAMPSON, VALENTINE
1. TURF CARE. High quality turf managed under a program of moderate to intense cultural
treatments. Mowing and trimming to take place every five to seven working days. Aeration as
required, but not less than once per year. Top dressing, seeding, and sodding as needed.
2. FERTILIZER. Broadleaf and other weed control as needed, usually two times per year.
Fertilizer as needed, usually one to two times per y ear.
3. IRRIGATION. Systems to be used and in good repair as to conserve water, and irrigate only
when needed to maintain high quality turf, usually done every two to three days.
4. GARBAGE & LITTER. Garbage and litter is picked up three times a week, subject to
variability based on weather and scheduled uses. Containers to be washed every two weeks.
4
5 e RECYCLING. One or two recycling bins (depending on park) will be placed at the picnic
shelter (if park has one) and at ball fields. They will be picked up at the same time as the
garbage and litter.
6. PRUNING. Usually done at least once per season unless species planted dictates more frequent
attention. Sculptured hedges or high growth species may dictate more frequent attention.
7. LIGHTING. Replacement or repair of fixtures when observed or reported as not working.
8. SIGNS. Signs that are fully exposed and south facing could be painted every 8 years or so.
Borders can be recoated every 3 years or so. Posts can be recoated every 2 -3 years.
9. SURFACES. Should be cleaned, repaired, repainted, or replaced when appearance has
noticeably deteriorated. Graffiti should be washed off or painted over by the next working day, if
possible.
10. REPAIRS. Should be done whenever safety, function, or bad appearance is in question.
11. INSPECTIONS. Inspections should be done weekly by staff with proper forms filled out.
12. FLORAL PLANTINGS. Flowers and shrubs weeded a minimum of once a month or more as
needed. The desired outcome is weed -free. Fertilize as needed.
13. RESTROOMS. If portable restrooms are provided, regular servicing to be done usually by an
outside contractor. However, if any servicing is noted, it should become a priority of staff.
14. PARK AMENITIES. Should be maintained for safety, function, and high quality
appearance as per established design.
15. PLAY STRUCTURES. Playground areas are monitored daily and inspected monthly. High
priority to fix or remove hazards due to high use by small children.
LEVEL III
This level of maintenance is performed at mini parks or park green spaces that have typically low
activity (few park amenities). Maintenance at this level is at a moderately low level usually
associated with low visitation or remote parks. Parks categorized in this level:
JOHANNA MARSH, LINDEY'S
1. TURF CARE. Mowing and trimming to take place every seven to ten working days. Normally
not aerated unless turf quality indicates a need. Topdressing, seeding, and sodding done only
when major bare spots appear.
2. FERTILIZER. Fertilize only as needed. Weed control normally occurs when weeds infest turf
to a high degree.
3. GARBAGE & LITTER. Minimum service of two times per week. High use may dictate higher
levels.
5
4. RECYCLING. One recycling bin will be placed near park garbage can. It will be picked up at
the same time as the garbage and litter.
5. PRUNING. When required for health or reasonable appearance. Most tree and shrub species
would not require more than once every two to three years.
6. LIGHTING. Replacement or repair of fixtures when report filed or when noticed by employees.
7. SURFACES. Cleaned on complaint basis. Repaired or replaced as budget allows.
8. SIGNS. Signs that are fully exposed and south facing could be painted every 8 years or so.
Borders can be recoated every 3 years or so. Posts can be recoated every 2 -3 years.
9. REPAIRS. Should be done whenever safety or function is in question.
10. INSPECTIONS. Twice per month.
11. FLORAL PLANTINGS. Only perennials or flowering trees or shrubs. Flowers and shrubs
weeded a minimum of once a month or more as needed. The desired outcome is weed -free.
Fertilize as needed.
12. RESTROOMS. None present.
13. PARK AMENITIES. Minimum allowable maintenance for features present with function and
safety in mind.
LEVEL IV
Low level usually associated with low level of development, low visitation, undeveloped areas or
remote parks. Areas where ground cover shall be left in a non-maintained (natural) condition.
Examples include wooded areas, open spaces, wetlands, and community preserves. Parks
categorized in this level:
CREPEAU NATURE PRESERVE
1. TURF CARE. Low frequency mowing schedule, weed control limited to legal requirements of
noxious weeds. Controlled burn should be administered every 5 years for prairie areas.
2. FERTILIZER. Not fertilized.
3. GARBAGE & LITTER. On demand or as needed.
4. RECYCLING. One recycling bin will be placed near park garbage can at each main entrance of
the park. It will be picked up at the same time as the garbage and litter.
5. PRUNING. No regular trimming. Safety or damage from weather may dictate work schedule.
6. REPAIRS. Should be done when safety or function is in question.
6
7. INSPECTIONS. Once per month
8. SIGNS. Signs that are fully exposed and south facing could be painted every 8 years or so.
Borders can be recoated every 3 years or so. Posts can be recoated every 2 -3 years.
9. FLORAL PLANTINGS. None.
10. PARK AMENITIES. Minimum maintenance to allow safe use.
Arden Hills Park Level Listing
Charles Perry
Cummings
Hazelnut
Arden Manor
Arden Oaks
Floral
Freeway
Ingerson
Royal Hills
Sampson
Valentine
Johanna Marsh Crepeau
Lindey's
Parks Maintenance Operation Calendars
The following pages are designed to show maintenance tasks, time of year they are usually
performed, and at what frequency they are performed during the yea
7
Task
Frequency
Jan
Feb
Mar
Apr
May
June
July
Aug
Sept
Oct
Nov
Dec
Litter Pickup
Daily
d
d
d
d
d
d
d
d
d
d
d
d
Mowing/Trimming
3 -5 Days -
3 -5d
3 -5d
3 -5d
3 -5d
3-
5d
3 -5d
3-
5d
Fertilization
3- 4x/yr.
x
x
x
Aerification
2- 3x/yr.
x
X
Weed Control (Turf)
As Needed
x
an
an
an
an
an
an
Topdressing /Seeding
As Needed
an
an
an
an
an
an
an
Irrigation Start-up
X
Irrigation (test) (Cummings,
Perry)
Weekly
w
w
w
w
w
Irrigation Shut -down
(Cummings /Perry)
X
Domestic Water Start-Up
(Perry)
X
Domestic Water Shut Down
(Perry)
X
Prepare Flower Beds
X
X
Maintain Flower Beds
(Weed)
BiWeekly
As Needed
an
an
an
bw
an
bw
an
bw
an
bw
an
bw
an
bw
an
bw
an
an
an
Prune Trees /Shrubs
Snow Removal
Priority
p
p
p
p
p
p
Facility Inspection (see
Checklist)
Daily
d
d
d
d
d
d
d
d
d
d
d
d
Groom Ball fields
Per Sched.
ps
ps
ps
ps
ps
ps
Crown Ball fields
X
X
Paint Foul Lines
BiWeekly
bw
bw
bw
bw
bw
bw
Inspect Ball Field
Daily
d
d
d
d
d
d
Clean Restrooms (when
open)
Daily
d
d
d
d
d
d
d
d
d
d
d
d
Clean Building (Cummings/
Perry)
Weekly ,
w
w
w
w
w
w
w
w
w
w
w
w
Playground Inspections
Monthly
m
m
m
m
m
m
m
m
m
m
m
m
Soccer Field Set Up -Shut
Down (Cummings /Hazelnut)
X
X
Paint Soccer Fields
(Cummings /Hazelnut)
BiWeekly
bw
bw
bw
bw
bw
bw
Put Up/Take Down Tennis
Nets
(Cummings /Hazelnut)
X
X
Tennis /Basketball Court
Maintenance
(Cummings /Hazelnut)
As Needed
an
an
an
an
an
an
an
an
an
Bleacher, Bench, Table
Maintenance
As Needed
an
an
an
an
an
an
an
an
an
an
an
an
Trail Maintenance
As Needed
an
an
an
an
an
an
an
an
an
an
an
an
Level I Maintenance Calendar
Task
Frequency
Jan
Feb
Mar
Apr
May
June
July
Aug
Sept
Oct
Nov
Dec
Litter Pickup
3 x week and
as needed
an
an
3x
3x
3x
3x
3x
3x
3x
3x
3x
an
Mowing/Trimming
5 -7 Days
5 -7d
5 -7 d
5 -7
d
5 -7 d
5 -7 d
5 -7 d
5 -7
d
Fertilizer
1 -2 per year
x
x
Weed Control
As Needed
an
an
an
an
an
an
an
Aerification
1 per year or as
needed
X
Bench, Picnic Table
Maintenance
As Needed
an
an
an
an
an
an
an
an
an
an
an
an
Prepare Flower Beds
X
X
Maintain Flower Beds
(Weed)
Monthly or as
needed
m
m
m
m
m
m
m
Groom Ball Field (if
applicable)
As Scheduled
sch.
sch.
sch.
sch.
sch.
Soccer Field Set Up -Shut
Down (Floral)
As Scheduled
sch.
sch.
sch.
Paint Soccer Fields
(Floral)
1 -2 x month
1 -2x
1 -2x
1 -2x
Prune Trees /Shrubs
As Needed
an
an
an
an
an
an
an
an
an
an
an
Facility Inspection (see
Checklist)
Weekly
w
w
w
w
w
w
w
w
w
w
w
w
Playground Inspections
Monthly
Weekly
m
m
m
m
m
m
m
m
m
m
m
m
Put Up/Take Down Tennis
Nets
(Floral /Royal Hills)
X
X
Tennis /Basketball Court
Maintenance
(Cummings /Hazelnut)
As Needed
an
an
an
an
an
an
an
an
an
Trail Maintenance
As Needed
an
an
an
an
an
an
an
an
an
an
an
an
LEVEL II — Maintenance Calendar
Task
Frequency
Jan
Feb
Mar
Apr
May
June
July
Aug
Sept
Oct
Nov
Dec
Litter Pickup
2 x week and as
needed
an
an
an
2x
2x
2x
2x
2x
2x
2x
an
an
Mowing/Trimming
7 -10 Days
7-
10d
7 -10
d
7 -10
d
7 -10
d
7-
10 d
7 -10
d
7 -10
d
Fertilizer
As Needed
an
an
an
an
an
an
an
an
an
Weed Control
As Needed
an
an
an
an
an
an
an
Aerification
Only if needed
Bench, Picnic Table
Maintenance
As Needed
an
an
an
an
an
an
an
an
an
an
an
an
Prepare Flower Beds
X
X
Maintain Flower Beds
(Weed)
Monthly or as
needed
m
m
m
m
m
m
m
Prune Trees /Shrubs
As Needed
an
an
an
an
an
an
an
an
Facility Inspection (see
Checklist)
BiWeekly
bw
bw
bw
bw
bw
bw
bw
bw
bw
bw
bw
Put Up/Take Down Tennis
Nets
(Johanna Marsh)
X
X
Tennis /Basketball Court
Maintenance (Johanna
Marsh)
As Needed
an
an
an
an
an
an
an
an
an
Trail Maintenance
As Needed
an
an
an
an
an
an
an
an
an
an
an
an
Task
Frequency
Jan
Feb
Mar
Apr
May
June
July
Aug
Sept
Oct
Nov
Dec
Litter /Garbage
1 x/wk or As
Needed
an
an
an
an
an
Mowing/Trimming
As Needed
an
an
an
an
an
Bench Maintenance
As Needed
an
an
an
an
an
an
an
an
an
LEVEL III — Maintenance Calendar
LEVEL IV — Maintenance Calendar
Y N
Sports fields:
Y N
Note any problems found (including locations)
Inspected by:
Date:
Facility Inspection Checklist
Arden Manor Park
Is site clean and well maintained?
Are all signs in proper condition?
Are trash cans empty? (Always empty at %2 full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Are all picnic tables in good physical repair?
Other? (specify)
Turf, field or court in proper playing condition?
Are the benches in proper condition?
Mowed?
Trimmed around all trees fence lines.
Are the basket ball nets in proper condition?
Arden Manor Park is 2.5 acres at 4601 Prior AVE.
11
Y N
Sports fields:
Y N
Note any problems found (including locations)
Facility Inspection Checklist
Arden Oaks Park
Is site clean and well maintained?
Are all signs in proper condition?
Are trash cans empty? (Always empty at 'A full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Are all picnic tables in good physical repair?
Other? (specify)
Turf, field or court in proper playing condition?
Are the benches in proper condition?
Mowed?
Trimmed around all trees fence lines.
Are the basket ball nets in proper condition?
Inspected by: Aden Oaks is 1.5 acres at 1413 Aden Oaks Dr.
Date:
12
Y N
Sports fields:
Y N
Note any problems found (including locations)
Inspected by:
Date:
Facility Inspection Checklist
Charles Perry Park
Building free of vandalism?
Building in proper repair?
Is site clean and well maintained?
Are benches properly maintained?
Are the water fountains free of known defects?
Are the restrooms properly maintained? (perm & portable)
Are all signs in proper condition?
Are trash cans empty? (always empty at half full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Are there are irrigation problems?
Is the parking lot in good repair?
Are all picnic tables in good repair/ vandalism free?
Other? (specify)
Turf, field or court in proper playing condition?
Are backstops and other fencing free of defects?
Are bleachers and benches in proper condition?
Mowed?
Trimmed around all trees fence lines, buildings and hockey rinks?
Perry is 20 acres at 3 700 New Brighton RD.
13
Y N
Note any problems found (including locations)
Facility Inspection Checklist
Crepeau Nature Preserve
Is site clean and well maintained?
Are benches properly maintained?
Are the trails in good condition?
Are all signs in proper condition?
Are trash cans empty? (Always empty at 1 /2 full)
Are all trees free from cracked limbs or snags?
Other? (specify)
Inspected by: Crepeau park is 12.5 acres at 1224 Harriet Ave.
Date:
14
Y N
Sports fields:
Y N
Note any problems found (including locations)
Facility Inspection Checklist
Cummings Park
Building free of vandalism?
Building in proper repair?
Is site clean and well maintained?
Are benches properly maintained?
Are the water fountains free of known defects?
Are the restrooms properly maintained? (perm & portable)
Are there are irrigation problems?
Are all signs in proper condition?
Are trash cans empty? (Always empty at V2 full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair? (Weeds pulled)
Is picnic shelters in proper physical condition?
Are all picnic tables in good physical repair?
Other? (specify)
Turf, field or court in proper playing condition?
Are backstops and other fencing free of defects?
Are bleachers and benches in proper condition?
Are the soccer goals and nets in good condition?
Are the basket ball and tennis nets in good condition?
Mowed?
Trimmed around all trees fence lines and buildings?
Inspected by: Cummings park is 17.5 acres at 1220 Wyncrest CT.
Date:
15
Y N
Sports fields:
Y N
Facility Inspection Checklist
Floral Park
Is site clean and well maintained?
Are benches properly maintained?
Are the restrooms properly maintained? (perm & portable)
Are all signs in proper condition?
Are trash cans empty? (Always empty at '/z full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Is the picnic shelter in good repair?
Are all picnic tables in good physical repair?
Other? (specify)
Turf, field or court in proper playing condition?
Are backstops and other fencing free of defects?
Are bleachers and benches in proper condition?
Are the tennis and basketball nets in proper condition.
Are the courts in good condition.
Are the soccer goals and nets in good condition?
Mowed?
Trimmed around all trees fence lines and buildings?
Note any problems found (including locations)
Inspected by: Floral Park is 20 acres at 1423 West Floral DR.
Date:
16
Y N
Sports fields:
Y N
Note any problems found (including locations)
Inspected by:
Date:
Facility Inspection Checklist
Freeway Park
Building free of vandalism?
Building in proper repair?
Is site clean and well maintained?
Are all signs in proper condition?
Are trash cans empty? (Always empty at '/2 full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Is the parking lot in good repair?
Are all picnic tables in good physical repair?
Other? (specify)
Are bleachers and benches in proper condition?
Is the basketball court in proper condition?
Mowed?
Trimmed around all trees fence lines buildings and hockey rinks?
Freeway Park is 1 acre at 1370 Co. Rd. E
17
N
Sports fields:
Y N
Facility Inspection Checklist
Hazelnut Park
Building free of vandalism?
Building in proper repair?
Is site clean and well maintained?
Are benches properly maintained?
Are the restrooms properly maintained? (perm & portable)
Are all signs in proper condition?
Are trash cans empty? (always empty at %z full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Is picnic area in proper physical condition
Are all picnic tables in good repair /vandalism free?
Is the parking lot in good repair?
Other? (specify)
Are tennis court and nets in proper condition?
Are basketball court and nets in proper condition?
Soccer goals and nets in good physical condition?
Turf, field or court in proper playing condition?
Are backstops and other fencing free of defects?
Are bleachers and benches in proper condition?
Mowed?
Trimmed around all trees fence lines, buildings and hockey rinks?
Note any problems found (including locations)
Inspected by: Hazelnut is 12 acres at 3301 New Brighton RD.
Date:
18
Y
Sports fields:
Y N
Facility Inspection Checklist
Ingerson Park
Is site clean and well maintained?
Are benches properly maintained ?)
Are all signs in proper condition?
Are trash cans empty? (Always empty at 'A full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Is the picnic area in proper physical condition?
Are all picnic tables in good physical repair?
Is the parking lot in good repair?
Other? (specify)
Turf, field or court in proper playing condition?
Are basketball nets in proper condition?
Mowed?
Trimmed around all trees, fence lines and buildings?
Note any problems found (including locations)
Inspected by: Ingerson park is 5 acres at 3255 No. Lexington Ave.
Date:
19
Y N
Note any problems found (including locations)
Facility Inspection Checklist
Johanna Marsh
Is site clean and well maintained?
Is tennis court surface in good condition?
Is the grass mowed?
Are all signs in proper condition?
Are trash cans empty? (Always empty at %2 full)
Are all trees free from cracked limbs or snags?
Other? (specify)
Inspected by: Johanna Marsh is 8.5 acres at 3168 Ridgewood Rd.
Date:
20
Y N
Sports fields:
Y N
Facility Inspection Checklist
Lindeys Park
Is site clean and well maintained?
Are all signs in proper condition?
Are trash cans empty? (Always empty at %2 full)
Are all trees free from cracked limbs or snags?
Other? (specify)
Is the bocce ball course in proper condition?
Mowed?
Trimmed around all trees fence lines and buildings?
Note any problems found (including locations)
Inspected by: Lindeys is 1.5 acre park at Snelling Ave. /Co.Rd E
Date:
21
Y N
Sports fields:
Y N
Note any problems found (including locations)
Facility Inspection Checklist
Royal Hills Park
Is site clean and well maintained?
Are benches properly maintained?
Are the restrooms properly maintained? (perm & portable)
Are all signs in proper condition?
Are trash cans empty? (Always empty at %2 full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Is the picnic area in proper physical condition?
Are all picnic tables in good physical repair?
Other? (specify)
Are the tennis courts and nets in proper condition?
Are the basketball courts and nets in proper condition?
Turf, field or court in proper playing condition?
Are backstops and other fencing free of defects?
Are bleachers and benches in proper condition?
Mowed?
Trimmed around all trees fence lines and buildings?
Inspected by: Royal Hills Park is 4.5 acres at No. Snelling /McClung Dr.
Date:
22
Y
Sports fields:
Y N
Note any problems found (including locations)
Facility Inspection Checklist
Sampson Park
Building free of vandalism?
Building in proper repair?
Is site clean and well maintained?
Are all signs in proper condition?
Are trash cans empty? (Always empty at '/2 full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Is the parking lot in good repair?
Are all picnic tables in good physical repair?
Other? (specify)
Is the basketball court in proper playing condition?
Mowed?
Trimmed around all trees, fence lines?
Inspected by: Sampson Park is 1 acre at 1900 Lake Ln.
Date:
23
Y N
Sports fields:
Y N
Note any problems found (including locations)
Inspected by:
Date:
Facility Inspection Checklist
Valentine Park
Is site clean and well maintained?
Are benches properly maintained?
Are the restrooms properly maintained? (portable)
Are all signs in proper condition?
Are trash cans empty? (Always empty at %z full)
Are all trees free from cracked limbs or snags?
Is the playground proper repair?
Is the parking lot in good repair?
Are all picnic tables in good physical repair?
Other? (specify)
Turf, field or court in proper playing condition?
Are backstops and other fencing free of defects?
Are bleachers and benches in proper condition?
Are soccer goals and nets in proper condition?
Is the basketball court and nets in proper condition?
Mowed?
Trimmed around all trees, fence lines?
Valentine park is 3acres at 1650 Lake Valentine Rd.
24
Visible cracks, bending warping, rusting,
breakage or excessive wear of any
component or part
Deformation of open hooks, rings, links, etc.
Worn swing hangers, "S hooks" or chains
on swings
Missing, worn, cracked or jagged swing seats
Broken supports /anchors
Concrete footings exposed, cracked, loose
in ground
Sharp edges or points
Exposed ends of pipe that should be covered
by plugs or caps
Protruding bolt ends that do not have smooth
finished caps /covers
Loose, worn, or rusted bolts, nuts, and other
fasteners
Splintered wood
Lack of lubrication on moving parts
Worn or squeaky bearings
Broken or missing rails, steps, rungs, seats
Surfacing material worn or scattered
Swing chain wrapped around horizontal
swing beams
Chipped or peeling paint
Broken glass, trash or foreign objects within
or on play equipment
Pinch or crush points (exposed mechanisms,
junctures or moving components)
Tripping hazards such as roots, rocks, or
other environmental obstacles
Poor drainage areas
Loose, twisting climbing rungs
Other (specify)
PARK NAME
Playground Inspection Checklist
Y
25
N
Notes
Playground Equipment and Mulch Replacement Schedule
ARDEN HILLS PARKS & RECREATION
PLAY STRUCTURE REPLACEMENT DATES
Arden Manor
Miracle Recreation
Arden Oaks Miracle Recreation
Cummings Miracle Recreation
Freeway Miracle Recreation
Floral Miracle Recreation
Hazelnut Landscape Structures
Ingerson Miracle Recreation
Charles Perry Landscape Structures
Royal Hills Miracle Recreation
Sampson Miracle Recreation
Valentine Miracle Recreation
1999
2019
1999
2019
1998
2018
1998
2018
2001
2021
1997
2017
2000 2020
1996 2016
2002 2022
2001 2021
1990 2010
Replacement cycle is based on the following criteria:
1) 20 year pattern
2) Wear & tear; vandalism
3) Changes in code (i.e. safety, ADA)
Playground Mulching Schedule
Arden Manor July, 2010
Arden Oaks
Charles Perry
Cummings
Floral
Freeway
Hazelnut
Ingerson
Royal Hills
Sampson
Valentine
June, 2009
July, 2008
June, 2009
June, 2009
May, 2010
July, 2010
June, 2009
May, 2010
June, 2009
July, 2008
2013
2012
2011
2011
2012
2013
2012
2012
2013
2012
2011
with playground replacement
26
Hard Court Resurfacing Schedule
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
Tennis/BB
X
reconstruct
X
Tennis/BB
X
Tennis/BB
X
X
X
Tennis/BB
X
X
BB
X
BB
X*
BB
X
BB
X
BB
x*
BB
X
*Current BB Court is not a true paved court. *This would be a reconstruct project
Tennis/BB = Tennis and Basketball Combination
BB = Basketball Court only
Agenda Item 4C:
Capital Improvement Plan Discussion
Capital Improvement Plan
City of Arden Hills, Minnesota
roject U 09-Park-010
Project Name Basketball - Tennis Court & Trail Rehabilitation
Description
Sampson Park Reconstruct - $9,000, Arden Manor Resurface - $4,000
Trail rehabilitation $2,000
Staff recommends resurface maintenance on tennis courts/basketball courts on a 5 -6 year schedule. In some instances, a complete reconstruct
may be needed to resolve foundation cracks.
Justification
Prior
I 30,000
Total
Prior
I 30.000
Total
Prior
-1.000 I
Total
Type Operational Maintenance
Useful Life
Category Park Maintenance
Expenditures
Funding Sources
General Fund
Budget Impact/Other
Budget Items
Construction /Maintenance
Annual Maintenance Charge
-oduced Using the Plan -It Capital Planning Software
Department Parks Department
Contact Park & Recreation Mgr
Priority n/a
Total Project Cost: $90,000
35
2011 thru 2015
�'::- :n' - t.. .0 /74 . N::-r y_ ...K�i_r.- ,sv'.....� :... ....... . :'�v %.��•: ^r_�syz_., ,�,
The City has a 5 -6 year resurface schedule. This is a tentative schedule. The courts that are scheduled for a resurface will be inspected the fall
before the scheduled improvement to determine if the court truly needs to be resurfaced_
Resurface projects for tennis/basketball courts and trails are considered maintenance and therefore cannot utilize the Special Revenue Park
Funds.
2011 2012 2013 2014 2015 Total
15,000 15,000 15,000 15,000 60,000
Total 15,000 15,000 15,000 15,000 60,000
2011 2012 2013 2014 2015 Total
15,000 15,000 15,000 15,000 60,000
Total 15,000 15,000 15,000 15,000 60,000
If these courts are not resurfaced, playing conditions for residents are poor_ The cracks will continue to expand and the price to resurface will go
up and a possible reconstruction would come into consideration which is the times the cost of rehabilitation_ Crack sealing cost savings would be
$500 a year.
2011 2012 2013 2014 2015 Total
-500 -500 -500 -1,500
Total -500 -500 -500 -1,500
Friday-, June 18, 2010
Capital Improvement Plan
City of Arden Hills, Minnesota
. #
10- Park -005
Project Name Valentine Park Improvements
Description
The City completed a drainage study of this park. The City Council has asked for the PTRC to review and recommend potential park
improvements as well as seek neighborhood input_ The elevation of Lake Valentine has improved due to removal of the beaver dam and
cleaning of the culverts. The City needs to monitor the lake levels. The park is draining better but has not seen a significant rain to determine
how well it is draining. The PTRC has recommended a second opinion on the Valentine Park park drainage analysis_ The park is in need of
improvements; to what extent will be up to the Council and the neighborhood.
Justification
This park is in poor shape. The parking lot is in need of replacement and there is no shelter, as it was moved due to the flooding. The play
p y
structure was installed in 1990. On the City's 20 year replacement schedule, it should be replaced in 2010, however, the playground is in fine
shape and therefore could make it until the park is improved. The park drainage needs to be addressed before amenities are replaced_
Prior
I 70,000
Total
Prior
I 70,000
Total
Type Improvement
Useful Life
Category Park Capital Improvements
Expenditures
Construction /Maintenance 260,000
Funding Sources
Total 260,000
Surface Water Mgmt Utility Fu 260,000
Total 260,000
Department Parks Department
Contact Park & Recreation Mgr
Priority n/a
Total Project Cost: $330,000
2011 thru 2015
2011 2012 2013 2014 2015 Total
260,000
260,000
2011 2012 2013 2014 2015 Total
260,000
260,000
Budget Impact/Other
The park improvement will help with maintenance because the park is usually so wet, it is difficult to mow and when done, one large area is not
able to be mowed at all. Savings estimated to be $200 per year for parts and labor_
Budget Items
Maintenance of Parks and Trail
Produced Using the Plan -It Capital Planning Software
2011 2012 2013 2014 2015 Total
-200 -200 -200 -200
Total -200 -200 -200 -200
24
-800
-800
Friday, June 18. 2010
Capital Improvement Plan
City of Arden Hills, Minnesota
oject # 10 -Park -031
Project Name Park Bench Implementation
Description Total Project Cost: $25,000
The PTRC recommended and established a 4 year implementation schedule.
$5,000 - 2010
$5,000 - 2011
$5,000 - 2012
$5,000 - 2013
$5,000 - 2014
Benches will be durable benches (standard green, punched steel) that are resistent to vandalism_ Each bench is typically $500 plus shipping and
therefore, year one the City could add up to approximately 18 -20 benches, year two through four - 9 -10 each year_
Justification
The City Council directed the Parks, Trails and Recreation Committee to consider recommending additional benches in the parks and trail
system to meet the aging population in Arden Hills and also families visiting our parks and using our play structures.
rior
5,000
Total
Prior
5,000
Total
Type Improvement
Useful Life
Category Park Capital Improvements
Expenditures
Construction /Maintenance
Funding Sources
Budget Impact/Other
Special Revenue Park Fund
Produced Using the Plan -It Capital Planning Software
Department Parks Department
Contact Park & Recreation Mgr
Priority n/a
2011 thru 2015
2011 2012 2013 2014 2015 Total
5,000 5,000 5,000 5,000 20,000
Total 5,000 5,000 5,000 5,000 20,000
2011 2012 2013 2014 2015 Total
5,000 5,000 5,000 5,000
Total 5,000 5,000 5,000 5,000
25
20,000
20,000
Friday, June 18, 2010
Capital Improvement Plan
City of Arden Hills, Minnesota
oject # 11- park -xyz
Project Name Playground Structure Replacement
Type Unassigned
Useful Life
Category Park Capital Improvements
Description
Play Structures are placed on a 20 year replacement pattern.
Justification
Valentine Park is up for replacement in 2010 or 2011_ This structure was last replaced in 1990. The decisions on the overall park
improvement will be important as to how to proceed on this. Placement of the playground structure could move from the current location and
this should be decided before replacement.
The next playstructure up for replacement is not until 2016 with Perry Park
Expenditures
Budget Impact/Other
Replacement Part Costs
Construction/Maintenance 50,000
Funding Sources
Total 50,000
Capital Improvement Funds (P1 50,000
Budget Items
Total 50,000
Produced Using the Plan -It Capital Planning Software
Department Parks Department
Contact Park & Recreation Mgr
Priority n/a
Total Project Cost: $50,000
2011 thru 2015
2011 2012 2013 2014 2015 Total
50,000
50,000
2011 2012 2013 2014 2015 Total
Maintenance of Parks and Trail - 200 - 200 - 200
Total -200 -200 -200
29
50,000
50,000
2011 2012 2013 2014 2015 Total
-600
-600
Friday. June 18, 2010
Capital Improvement Plan
City of Arden Hills, Minnesota
roject # 11- park - -zzz
Project Name Park Amenities
Type Improvement
Useful Life
Category Park Capital Improvements
Description
Amenities such as picnic tables, benches, pavilion equipment needs.
Justification
Expenditures
Other
Funding Sources
Budget Impact/Other
Produced Using the Plan -lt Capital Planning Software
Department Parks Department
Contact Park & Recreation Mgr
Priority n/a
Total Project Cost: $25,000
30
2011 thru 2015
Picnic tables, pavilion building needs and general park amenities. Picnic tables are always in need of replacement and as the pavilion buildings
age, replacement needs will come up.
2011 2012 2013 2014 2015 Total
5,000 5,000 5,000 5,000 5,000 25,000
Total 5,000 5,000 5,000 5,000 5,000 25,000
2011 2012 2013 2014 2015 Total
Capital Improvement Funds (Pt 5,000 5,000 5,000 5,000 5,000 25,000
Total 5,000 5,000 5,000 5,000 5,000 25,000
Friday, June 18, 2010
Capital Improvement Plan
City of Arden Hills, Minnesota
_ _ 4ject t# 11- park -yyy
Project Name Forestry Implementation Plan
Type Operational Maintenance
Useful Life
Category Unassigned
Description
With the Emerald Ash Borer identified in St_ Paul in the spring of 2009, the studies show that the beetles will move out at a rate of one to two
miles per year At that rate, the City could be completely infested in approximately 8 -10 years_ Staff will need to work on getting an entire
inventory of the City and then implement a plan. Staff is considering bringing in a private consultant to help with the inventory of Emerald Ash
Borer in order for this plan to be put in place_ In addition, putting aside additional funds for the removal /replacement of Ash Borer each year is
recommended_
Justification
The City will have impacts to the Forestry with the Emerald Ash Borer Treatment, Removal and Replacement on the horizon. The City of
Arden Hills will need to have an inventory of the City in order to establish an implementation Plan_
Expenditures 2011 2012 2013 2014 2015 Total
Planning /Design 20,000 20,000
Construction /Maintenance 10,000 10,000 10,000 10,000 10,000 50,000
Funding Sources
Budget Impact/Other
Capital Improvement Funds (P1 30,000 10,000 10,000 10,000 10,000 70,000
Produced Using the Plan -It Capital Planning Software
Department Parks Department
Contact Public Works Director
Priority nfa
2011 thru 2015
Total Project Cost: S70,000
Total 30,000 10,000 10,000 10,000 10,000 70,000
2011 2012 2013 2014 2015 Total
Total 30,000 10,000 10,000 10,000 10,000 70,000
Removal and Replacement will be a large impact. An inventory of the City will help us determine the exact impacts_
56
Friday, June 18, 2010
Capital Improvement Plan
City of Arden Hills, Minnesota
oject # 13 -Park -001
Project Name West Round Lake Trail
Type Improvement
Useful Life
Category Park Capital Improvements
Description
Department Parks Department
Contact Engineer
Priority n/a
Total Project Cost: $120,000
2011 thru 2015
This is a proposed trail to link two sections of trail that exist behind the businesses along Round Lake. The missing trail is .46 mile or 2,421 feet.
Justification
If this trail is not completed, it will not be used due to the gap. An easement needs to be worked out with Deluxe Corporation (Formerly
Scholls), in order to move forward. With a new tenant at this location, we could possibly make progress.
Expenditures
Budget Impact/Other
Construction /Maintenance
Funding Sources
Special Revenue Park Fund
Total
Total
Produced Using the Plan -1t Capital Planning Software
2011
2012
31
2013
120,000
120,000
2014
Staff estimates that this pathway would cost approximately $2 per foot to maintain which equals $4,842 per year.
2015
Total
120,000
120,000
2011 2012 2013 2014 2015 Total
120,000 120,000
120,000 120,000
Friday, June 18, 2010
Capital Improvement Plan
City of Arden Hills, Minnesota
Project Name County Road E Trail
oject # 13- Park -010
Type Improvement
Useful Life
Category Park Capital Improvements
Description
The project calls for construction of an 8 foot trail extending from the potential pedestrian bridge to Old Highway 10_ The City Council selected
the north side for this trail when it was brought in for discussion. This trail has no identified funding at this time.
Justification
The Parks, Trails, and Recreation Committee identified this trail as a priority in the 2030 Comprehensive Plan_ If the bridge is put into the 2015
maintenace program, the City may choose to advance construct the bridge in 2013_ Staff and the PTRC would want to look for a funding source
to build a connecting trail from Old Snelling to the bridge_
Expenditures
Budget Impact/Other
Planning/Design
Construction /Maintenance
Funding Sources 2011 2012 2013 2014 2015 Total
Grant Revenue 256,000 256,000
Special Revenue Park Fund 28,100 28,100
State Aid Funds 64,000 64,000
Yearly maintenance on this sidewalk is estimated at $2 a linear foot. The sidewalk is 1,600 feet = $3,200 per year.
Budget Items
Annual Maintenance Charge
Total
Produced Using the Plan -It Capital Planning Software
Department Parks Department
Contact Engineer
Priority n/a
Total Project Cost: $348,100
2011 thru 2015
2011 2012 2013 2014 2015 Total
28,100 28,100
320,000 320,000
348,100 348,100
Total 348,100 348,100
Total
2011 2012 2013 2014 2015 Total Future
32
3,200 3,200
6,400
3,200 3,200 T
Friday, June 18, 2010
Capital Improvement Plan
City of Arden Hills, Miimesota
oject # 13-Park-011
I Project Name County Road E Sidewalk Improvements (Bridge)
Description
Justification
Prior
I 20,000
Prior
I zo,00oI
Total
Type Improvement
Useful Life
Category Park Capital Improvements
Expenditures
Funding Sources
Budget Impact/Other
Budget Items
Construction /Maintenance
Capital Improvement Funds (PI
Ramsey County- Street lmprov
Annual Maintenance Charge
Total
Total
Produced Using the Plan -It Capital Planning Software
Department Parks Department
Contact Engineer
Priority n/a
Total Project Cost: $2,520,000
2011 thru 2015
Mn/DOT has begun the process of identifying projects to be included in their 2015 Bridge Improvement Program (BIP). Driven in part by the
city's previous finding applications, an improvement project for the County Road E Bridge over Trunk Highway 51 (Snelling Avenue) has been
included in the initial list of projects. if this remains in the program, the City could decide to advance construct the bridge as early as 2013.
Ramsey County has indicated they may be willing to cooperate with the City on this advance construct. The cost - participation on this project
between Mn/DOT, Ramsey County and the City is currently unknown. If the project is advance constructed, Mn/DOT would reimburse costs in
the year Mn/DOT scheduled the project.
The bridge along County Road E is very narrow and pedestrian travel on this stretch is very dangerous. The Parks, Trails, and Recreation
Committee identified this project as a priority in the 2002 Comprehensive Park Plan, 2006 Strategies and 2030 Comp Plan.
2411 2012 2013 2014 2015 Total
2,500,000 2,500,000
'Total Total 2,500,000 2,500,000
2011 2012 2013 2014 2015 Total
1,250,000 1,250,000
1,250,000 1,250,000
2,500,000 2,500,000
This project would add approximately 925 linear feet of trail on the ped bridge to be maintained at $2 per linear foot per year.
2011 2012 2013 2014 2015 Total Future
33
1 ,850 1,850 1 ,850 5,550
1,8501
1,850 1,850 1,850 5,550 Total
Friday, June 18, 2010
Capital Improvement Plan
City of Arden Ills, Minnesota
(oject # 14 -Park -008
Project Name Snelling Avenue Regional Trail
Type Improvement
Useful Life
Category Park Capital Improvements
Description Total Project Cost: $2,284,149
Segment I - identified in the 2008 CP Rail Feasibility Report would extend from Trunk Highway 51 to County Road E. A feasibility study for
the needed improvements along Snelling Avenue from TH 51 to County Road E is programmed for 2010; the actual construction year is to be
determined based on the results of the feasibility report. The CP Rail Bridge improvements are planned for the west side in 2010_ Therefore, it
may make the most sense to pursue the trail on the west side for this segment. To complete the rest of the segments and the entire corridor from
County Road E to Highway 96 (going with the west side), it is proposed to be an additional $1,975,149.00. The City could potentially seek
federal funding assistance for this corridor_
Justification
The PTRC has identified this trail in it's 2006 Strategies as a priority_ It is identified as a key north - south regional connection. The Snelling
Avenue PMP reconstruction has currently no set date for reconstruction_ That project may factor into when this trail is constructed. Staff needs
to continue to research the various funding possibilities_
Expenditures
Funding Sources
Budget Impact/Other
Budget Items
Planning /Design
Construction /Maintenance
Total
Capital Improvement Funds (P1
Total
As a result of segment I trail, maintenance costs are estimated to be $8,464.00 per year. (1 6,579 linear feet times $2 a foot for the entire corridor =
$33,158.)
Maintenance of Parks and Trail
Total
Produced Using the Plan -ft Capital Planning Software
Department Parks Department
Contact Park & Recreation Mgr
Priority n/a
2011 thru 2015
S: jir A -7 l
.: i t
2011 2012 2013 2014 2015 Total
445,030 445,030
1,839,119 1,839,119
2,284,1 49 2,284,149
2011 2012 2013 2014 2015 Total
2011 2012 2013 2014 2015 Total
34
2,284,149 2,284,149
2,284,149 2,284,149
8,464 24,694 33,158
8,464 24,694 33,158
Friday, June 18, 2010
Other Attachments:
Ramsey County Parks and Recreation Commission Agenda and Minutes
RAMSEY COUNTY PARKS AND RECREATION COMMISSION
MEETING
October 13, 2010 6:00 p.m.
NOTE: TAMARACK NATURE CENTER
5287 OTTER LAKE ROAD
WHITE BEAR LAKE, MN 55110
1) CALL TO ORDER
2) APPROVAL OF AGENDA
3) APPROVAL OF MINUTES OF SEPTEMBER 14, 2010
4) INTRODUCTION OF SCOTT YONKE
5) TOUR OF DESTINATION FOR DISCOVERY CONSTRUCTION PROJECT
6) LEGACY BRICK PROGRAM PRESENTATION
7) STATE OF THE PARKS REPORT
8) DIRECTOR'S REPORT
9) REPORT FROM CHAIR AND OTHER COMMISSION MEMBERS
10) ADJOURNMENT
* * * COMMISSION MEMBERS
PLEASE CALL VICKI DAHLQUISTA T 651- 748 -2500, X307
IF YOUARE UNABLE TO ATTEND
1
RAMSEY COUNTY PARKS AND RECREATION COMMISSION
MINUTES
September 14, 2010
RAMSEY COUNTY PARKS AND RECREATION
2015 North Van Dyke Street
Maplewood, MN 55109
The regular meeting of the Ramsey County Parks and Recreation Commission was
called to order by Chair Straumann at 6:10 p.m., at Ramsey County Parks and
Recreation Department, 2015 North Van Dyke Street, Maplewood, Minnesota.
Members Present: Deb Falkowski, Phil Jenni, Gale Pederson, Richard Straumann
Members Absent: Candy Petersen, Bryan Shirley, Brian Tempas
Staff Present: Greg Mack, Ken Wehrle
APPROVAL OF AGENDA
Ms. Pederson moved, seconded by Ms. Falkowski, that the agenda of the Parks and
Recreation Commission be approved as mailed. Motion carried.
APPROVAL OF MINUTES
Chair Straumann asked for a motion to approve the minutes of June 9, 2010. Ms.
Falkowski moved, seconded by Mr. Jenni, that the minutes of June 9, 2010 be approved
as mailed. Motion carried.
STATE OF THE PARKS REPORT
Mr. Mack noted that the resolution establishing the Parks and Recreation Commission
prescribes that the Commission prepare a State of the Parks Report. He reviewed the
format of past reports. The most recent report was the 2006-.2008 Report that was
presented in a pictorial format demonstrating on a county map improvement projects
that had involved the Parks and Recreation Commission. That report also included a
list of special projects and the Commission's perspective on challenges and
opportunities facing the Ramsey County Parks and Recreation system. Mr. Mack
suggested an alternative format to identify, in narrative fashion, the major projects that
have involved the Parks and Recreation Commission. The format could incorporate
photographs of project elements. It was the consensus of the Commission members
that this format is appropriate. Mr. Mack requested that Commission members share
their perspectives on Ramsey County Parks and Recreation services and collectively
present the Commission's view of future challenges and opportunities for the system.
Mr. Mack agreed to provide a summary of Commission activities for review at the
October Commission meeting. Chair Straumann agreed to coordinate Commission
comments.
1
CONSTRUCTION PROJECT UPDATE
Ken Wehrle, with the use of a site plan and photographs updated the Commission on
progress at the Tamarack Nature Center Nature Play Area, Children's Garden and
Garden House. Commission members were impressed with the progress and
requested that the October Commission meeting be held at Tamarack Nature Center for
a first -hand tour of the project.
Mr. Wehrle provided a progress report on the Keller picnic area redevelopment project
noting that the restrooms and shelters were completed in July and open to the public for
use except those located in the Lower Keller area. The Lower Keller area parking lot
and new entry road are currently under construction. Four additional shelters are slated
for construction in 2011. This includes three shelters in the Golfview Area and one at
Round Lake.
Contracts are being awarded for resurfacing of the play areas at Snail Lake Regional
Park and Island Lake County Park. Projects scheduled for 2011 include the Battle
Creek Regional Park picnic shelter, Turtle Lake County Park redevelopment, Lower
Afton Trail construction and design plans for Keller Golf Course.
ENVIRONMENTAL INVESTIGATION OF TCAAP PROPERTIES PROPOSED FOR
TRANSFER TO RAMSEY COUNTY FOR REGIONAL TRAIL
Mr. Mack updated the Commission on the process that will be used for environmental
investigation. Essentially, the Department is awaiting a License Agreement from the
General Services Administration for the 108 acres proposed for transfer. Upon receipt
of the License Agreement, the County will enroll in the Minnesota Pollution Control
Agency's Volunteer Investigation and Cleanup (VIC) Program and hire an environmental
consultant to assist in formulating a Response Action Plan (RAP). Once a RAP has
been agreed upon, the County will negotiate with the General Services Administration
on cost participation in implementing the RAP. Ultimately, the goal is to obtain the
property through the National Park Service for the intended regional trail use.
DIRECTOR'S REPORT
Mr. Mack reported that the Ramsey County Board of Commissioners will be holding a
public hearing on the proposed 2011 operating budget on November 29, 2010 at 6:30
pm at Roseville High School. The proposed budget maintains the level of services
offered by the Department; however, changes in the ice arena market will result in a
revenue shortfall that will be covered by other sources.
Ramsey County Commissioners were approached by officers of the Hillcrest Golf Club
to discuss the potential sale to Ramsey County. The date established by the listing
agent for consideration of proposals is September 21, 2010. Ramsey County will not be
submitting a bid for the property at this time.
Ken Wehrle, Planning Director, will be retiring at the end of September. A replacement
has been hired. Scott Yonke will be joining the Department on September 27, 2010.
2
The National Recreation and Park Association will be holding its annual congress in
Minneapolis the last week of October. The Department will be hosting two off-site
institutes at Tamarack Nature Center. Monday, October 25 Tamarack will be featured
in the Best of Show-NACPRO Annual County/Regional Park Tour. On Tuesday,
October 26 Ramsey County will host an off-site institute entitled Children and Nature:
Breaking New Ground at Tamarack.
Representatives from the departments of Parks and Recreation and Public Works met
with Minnesota Department of Transportation staff to discuss a comprehensive study of
trail crossings of 1-694 between 35-W and 35-E. The goal of the study is to identify the
appropriate intervals and specific locations for recreational trail crossings and commuter
bikeways crossings. No specific timeline has been established for this study; however,
it is anticipated that it will involve members of the ALRC! and the Parks and Recreation
Commission.
REPORT FROM CHAIR AND OTHER COMMISSION MEMBERS
Rich Straumann suggested that the Commission hold its October meeting at Tamarack
Nature Center.
Mr. Jenni congratulated Mr. Mack as the recipient of the Friends of St. Paul and
Ramsey County Parks and Trails Outstanding Service Award presented at the Friends
25 anniversary celebration. Mr. Jenni moved, seconded by Mr. Straumann, that the
Commission affirm the quotation offered by the Friends Executive Director, Peggy
Lynch, about the award recipient, "There simply couldn't be a classier guy to work with.
It doesn't matter if it is a tiny local issue that impacts only a few people or a funding
issue that impacts the entire park system, Greg approaches it with dedication and
professionalism. He knows how to pick his bathes and he certainly has a winning
record." Motion carried.
ADJOURNMENT
Upon appropriate motion, the meeting was adjourned.
Respectfully submitted,
Vicki Dahlquist
3