Loading...
HomeMy WebLinkAbout2B, MnDOT I-694T 51 Improvement Project - Municipal Consent ResolutionAIW ENHILLs Request for Council Review Prepared By: Terry Maurer, Public Works Director Worksession Date: October 18, 2010 13 Mn/DOT I- 694/TH 51 Improvement Project- Municipal Consent Resolution Discussion Topic: Discuss the draft resolution (2010 -052) and revised conditions denying municipal consent for the I- 694/TH 51 layout Supporting Documents: • Memo from Terry Maurer dated October 18, 2010 • Mn/DOT Letter dated September 14, 2010 • Municipal Consent Process • Draft Resolution 2010 -052 and Revised Conditions DATE: October 18, 2010 TO: Honorable Mayor and City Council Members Patrick Klaers, City Administrator FROM: Terry Maurer, Public Works Director #1 SUBJECT: Mn/DOT I -694 Improvement Project- Municipal Consent Resolution Background Mn/DOT is proposing an improvement project for the interchange of Interstate 694, Highway 10, Snelling Avenue and Hamline Avenue in Arden Hills. In June, Mn/DOT submitted a Mn/DOT approved layout to the City, requesting City approval (Municipal Consent) of the layout. On August 9, 2010, the City Council held the public hearing for this project. Discussion Following the August 9, 2010 public hearing, City staff met with Mn/DOT and Ramsey County to review comments heard from City Council members and residents. (At a later date staff met with the Shoreview PWD as he was not available for the initial meeting) Items of discussion included traffic /access, pedestrian movements, noise, and project benefits. Staff requested additional information from Mn/DOT based on the comments made at the public hearing. Mn/DOT has provided the attached letter dated September 14, 2010. At the September 20, 2010 worksession the City Council asked staff to prepare some possible conditions for a Municipal Consent resolution. Those were prepared and emailed to council members late last month. The draft conditions were reviewed and discussed by the City Council at their October 11, 2010 worksession. At the end of the discussion the City Council requested to review the revised conditions at their October 18, 2010 worksession. A draft resolution with the revised conditions is attached Schedule Also attached is a summary sheet outlining the Municipal Consent process. Following the public hearing held August 9, 2010, the City has 90 days, or until November 7, 2010, to approve /disapprove the layout. The last regularly scheduled City Council meeting before this deadline is Monday, October 25, 2010. City Council Meeting C: \Users \terry.maurer\Desktop \I -694 Memo.doc �1�EN HILLS MEMORANDUM Page 1 of 2 Council Action Requested Provide staff with comments regard the draft resolution and conditions denying Municipal Consent for the I- 694/TH 51 Layout. City Council Meeting C: \Users \terry.maurer\Desktop \I -694 Memo.doc Page 2 of 2 Attachment A Mn /DOT Letter Dated September 14, 2010 s ' t Minnesota Department of Transportation ft Metropolitan District 1500 West County Road B-2 Roseville, MN 55113 Date: September 14, 2010 Ms. Kristine Giga City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 -5743 RE: State Project 6285-135:1-694 Improvement Project (Lexington Avenue to west of CSAH 76) Dear Ms. Giga: On August 9, 2010, the City of Arden Hills held a Public Hearing for municipal consent of the layout for 1-694 at TH 51/TH 10/Hamline Ave. At that meeting, issues were raised by the residents of Arden Hills and the City Council asked several questions regarding effects on traffic, noise levels, and pedestrian accomodations. In addition, Mn /DOT met with city staff and staff from Ramsey County to discuss aspects of the layout and how Mn/DOT may be able to work with the City to obtain municipal consent of the layout. The following discussion will address the comments that appear to be the biggest concerns. Traffic Forecast Numbers There are some 2030 traffic numbers not on the layout on the east side of Lexington Avenue. 1 have looked into these numbers and the westbound exit ramp to Lexington Avenue will carry approximately 4800 vehicles per day. The eastbound entrance ramp to 1 -594 will carry approximately 7400 vehicles per day. Lexington Avenue north of County Road F is projected to carry approximately 9,000 vehicles per day. Some traffic numbers on the current layout on Hamline Avenue south of County Road F seemed odd. These numbers have been checked and the existing traffic counts as well as the projected day of opening forecasts are incorrect. The correct present counts for southbound Hamline Avenue should be roughly 6,000 vehicles per day and the day of opening forecasts are expected to be less than 7,000 vehicles per day. This information has been corrected and will be included on an updated layout. An Equal Opportunity Employer -7 ' ,:{ .- t . l.r•+'. r 'N'::i • ' �: r.�: tv_-• �ij!ry+v -r.I, •; : ° �:i •n -� n:� -.t -.r 3!'v..K a, ri•.••. ' ;' ''Ti's )!1 x..j 't �•" "�' 7'y`'f 4j ' S a • <:ii '•a 4 t :� �� :� y 1.4;� j.. <:ti +��.,��•; • i j ,�� •• ,� y. r � ' { it �t: �• = �nti�:r 4.,� %��. ^ j } }1Y. t;',' �_ . i t ;�.:.__.,:;:._- �'f,'.••i.1��i. � �- •:rr,'.!4 Lexington Avenue Intersection Improvements At the Pubic Hearing, there were questions asked regarding the impacts at the intersection of Lexington Avenue and County Road F. After that meeting, Mn/DOT and Ramsey County met to discuss this intersection and any changes that could be made. The traffic projections were looked at along with the existing problems. Potential opportunities were looked at and some possible changes were discussed. The opportunity to modify the intersection to allow for a northbound to westbound double left turn and an eastbound to northbound double left seemed to be the biggest changes needed. There was also discussion about the opportunity to interconnect the signals along Lexington Avenue to obtain better signal operation through the area. Both Ramsey County and Mn/DOT agreed that Ramsey County will take an in-depth look at the intersections and work with Mn/DOT on obtaining funding to make the changes deemed necessary to improve this area of Lexington Avenue. Potential funding through Mn/DOT's Cooperative Agreement program may be available as early as July 2012 for these improvements. The existing geometries of the Lexington Avenue bridge over 1-694 do cause some increased intersection delay due to the lack of storage for the left turning movements. Mn/DOT has looked at the bridge and the full width of the bridge is 75' 10", This width may allow for some future modifications to the existing geometries. Mn/DOT will work with Ramsey County on making some changes to aid in the improvement of the intersections and their operation upon completion of the Final Design of the 1-694 improvement project. Other Traffic Impacts in the Area At the Public Hearing, there were questions asked regarding how some of the local roads (County Road 96, County Road F, Hamline Ave, Lexington Ave and County Road E) will be affected by the proposed project. Mn/DOT responded that with improvements to 1-694, some regional traffic will be taken off of the local system and returned to the interstate. This will allow the traffic on the local roadways to be reduced upon the completion of construction. Traffic on County Road 96, from east of Lexington Avenue to west of Han Avenue, is projected to be reduced by approximately 10%. Lexington Avenue just north of County Road F, it is estimated that traffic in this area wilt be reduced by about 5%. Traffic on Hamline Avenue north of County Road F is estimated to be reduced by roughly 15%. Traffic on County Road F is projected to have an increase of somewhere between 0- An Equal Opportunity Employer 25% depending on which end of County Road F you look at. And finally, County Road E is estimated to maintain the same traffic volumes upon the conclusion of construction. Pedestrian Movements The City has talked with Mn/DOT regarding pedestrian access throughout the project area. In addition, the Council did pass a resolution supporting the inclusion of pedestrian safe infrastructure as a part of the project. Mn /DOT has taken a proactive approach in trying to address the pedestrian issue in this area. The design, as it exists today, does not preclude any pedestrian options through the area for recreational use. The users out there today will still have the ability to maneuver through the area in the future. Northbound TH 51 will have a 10' shoulder on the outside, and southbound Hamline Avenue will have 24' of pavement width which is sufficient for one vehicle traffic lane and commuter bicycle use of the shoulder. After meeting with Ramsey County and Arden Hills staff, Mn /DOT is working on creating a bike /pedestrian study group that should be created within four to six months. This group will look at the bike and pedestrian facilities and the crossings of 1 -594 from 1 -35W to 1-35E. The group could include but is not limited to Mn /DOT, Metropolitan Council, Ramsey County, Arden Hills and Shoreview. Ramsey County Parks took an initial look at the crossings in this corridor and feels that crossings at approximately 1 mile spacing is a reasonable expectation. This concept wilt need to be looked at as a part of the study, but the end result should be a mutually agreed upon plan for the corridor. The current project does not preclude the addition of grade separated bicycle and pedestrian facilities, including expansion of TH 51/Hamline Avenue bridges. As CSAH 76 /old TH 10/old Snelling Avenue is slated for a future trail, Mn /DOT will work with the city on the typical section for CSAH 76 from the end of the slope paving to the back of the curb for a trail on the west side. And, there will be a shoulder on both sides of the roadway for bicyclists to use. The City would like to participate in the construction of a segment of sidewalk from Floral Drive to County Road F. Mn/DOT is willing to work with the City on the construction of this sidewalk as long as no right of way is required as a part of the construction. Mn/DOT will work with city staff in designing a sidewalk that will be included in the construction plans. An Equal Opportunity Employer The pedestrian crossing location wilt need to be looked at carefully due to the proposed northbound free right turn movement to County Road F that will conflict with the pedestrian crossing. Noise Asa p art of the Noise Advisory Committee (NAC), Mn /DOT analyzed the noise wails for the entire project. While some walls were determined to be reasonable (reduce the noise by a minimum of 5dBA), no walls were determined to be cost effective. The City is interested in the consideration of a 20' high noise barrier along the north side of the west bound C/D road. The total cost of this wall is approximately $1,525,000. Mn /DOT is willing to participate up to $3250 per decibel per benefiting property. This means that the City could request that Mn /DOT construct this wall. In doing so, Mn /DOT would contribute approximately $1,050,000 and the City would be required to pay the remaining cost, approximately $475,000. These costs are based on the most cost effective wall construction. No costs associated with design or construction would be attributed to the city. Landscape Plan MnIDOT is working on establishing a landscape plan for the project area. The landscaping would occur a couple of years after the completion of the roadway construction. Proiect Benefits • Public Safety: In the last 3 years, there have been 426 crashes on 1 -694 from Lexington Avenue to TH 10, including 3 fatalities /serious injury crashes and 423 injury and personal damage crashes. • With the proposed project, the traveling public, including Arden Hills residents and employers in Arden Hills can expect: 0 A reduction in the crash rate (number of crashes per million vehicle miles traveled (MVM)) from the existing level of 4.5 to a typical freeway section in the metro area of 1.0. Reduction in crashes will reduce traffic volumes using local streets during these events 0 A reduction in the severity rate (number of crashes, weighted according to their injury type per MVM) from the existing level of 5.6 to a typical freeway section in the metro area of 1.2. An Equal Opportunity Employer Mn /DOT appreciates the City of Arden Hills commitment to improve safety and reduce congestion on 1 -694, TH 96 and the local roadway system within the City of Arden Hills. The improvements shown on the layout will allow for the traffic in this region to experience improved travel time reliability as well as prepare for future expansion of mainline 1 -694 to the east. If you have any additional questions or if you need any further explanation of these issues ahead of the council work - session on September 20, 2010, please feel free to contact me. Sincerely, cc: Wayne Norris An Equal Opportunity Employer • Reduced Traffic Congestion: Presently there are up to 5 hours of congestion in the area during weekday peak hours on this segment of freeway. With the proposed project, the traveling public, including Arden Hills residents and employers in Arden Hills can expect: O Regional trips wilt be reallocated to 1 -694 from the local roadway system O An increase in AM peak period speeds between Lexington Ave and TH 10 from <50rnph to >60 mph. O An increase in PM peak period speeds from <2Omph to >55 mph. O Reduced variability in travel times and increased reliability of trip times. O A reduction of at least 780 hours of congestion per year. • Project benefits not only affect commuters on the freeway system, it also affects the efficiency of freight movement in the Twin Cities, efficiency of emergency services, and reliability of transit services. ark J. Lindeberg North Area Engineer Attachment B Municipal Consent Process HPDP / Scoping /Subject Guidance Minnesota Department of Transportation Contact Steve Ryan, P. E. steve.ryan @state.mn.us Project and Process Guidance Engineer Office of Technical Support 395 John Ireland Boulevard, MS 676 St. Paul, MN 55155 (651) 366 -4675 Forms For a generic layout - approval resolution for use by a municipality, see Sample Resolution in the Appendix. Threshold Criteria Municipal Consent Municipal consent should only be requested from a city if it is required. When Required Municipal approval is required for any trunk highway project that results in any of the following within a municipality: • Alters access, • Increases or reduces traffic capacity, or • Requires acquisition of permanent right -of -way. • (Changing capacity means adding or reducing the number of through lanes. For example, adding auxiliary lanes is not a change in capacity). Exceptions Municipal consent is NOT required (regardless of impacts to access, capacity, or R/W) for projects needed for any of the following: • Regulate traffic, or • Install traffic control devices, or • Other safety measures • The term "other safety measures" refers to traffic safety measures. For example, the addition of a turn lane is a traffic safety measure; the replacement of a structurally - deficient or fracture - critical bridge is not. 1 of 5 Municipal Consent HPDP / Scoping / Subject Guidance Mn /DOT Also, maintenance activities do not trigger the need for municipal consent. Examples Permanent Easements (such as Drainage Easements) require municipal consent (because they take permanent right-of-way). Roundabouts are used for traffic regulation and as a safety measure, and thus are exceptions that do not require Municipal Consent even if they involve permanent right -of -way taking. Roles and Procedures Municipal consent should only be requested from a city if it is required. (See Threshold Criteria above). Sometimes a city may choose to waive municipal consent on a specific project. In that case the city council must pass a resolution clearly identifying the project and waiving its right to municipal consent for that project. However, the typical municipal consent process is as outlined below. Procedure (for obtaining municipal consent) 1. Mn /DOT (District) submits to the city the final layout with a letter requesting city approval. The letter includes a good faith cost estimate of the city's share of the project's cost and the following (either in the letter or in an attached report): • project purpose • route location • short description of the proposed design of the highway • any additional supporting data 2. City schedules and holds public hearing (within 60 days of submittal). City must schedule within 15 days of receiving Mn /DOT's request for approval and must give 30 days public notice. 3. City passes resolution approving /disapproving (within 90 days of public hearing). After 90 from the date of the public hearing, if the city has not passed a resolution disapproving the layout, the layout is deemed approved. 2 of 5 Municipal Consent HPDP / Scoping / Subject Guidance Mn /DOT 4. If city disapproves, Mn /DOT decides whether to: a. Meet city's condition(s), assuming city approved with conditions: Mn /DOT writes city a letter indicating this and attaches revised layout with change(s). This ends the MC process. b. Go to the appeal process. c. Stop the project (do not build the project, or scale project down so that municipal consent is no longer required). 5. If in the final plan Mn /DOT alters access, capacity or R/VV, Mn /DOT must re- submit changed portion of plan for city's approval. (The city is not required to hold another public hearing and has 60 days to approve or disapprove). City Approval The city can approve either by a formal approval resolution (see generic resolution in Appendix), or by not passing a resolution disapproving the layout within 90 days of the public hearing. The city's review — with regards to layout approval — is limited to the project elements in the final layout that are within the boundaries of that city. A city cannot impose a condition on its approval that is outside of the city's boundaries. The process allows the city one opportunity to exercise approval or disapproval of the final layout (unless Mn /DOT alters the plan with regards to access, capacity, or right -of -way). Once a city approves the layout, it cannot rescind its approval later. If a city disapproves with conditions, and if Mn /DOT agrees to meet those conditions — and notifies the city in writing (including copy of revised layout) — then municipal consent has been obtained. The municipal consent statute applies to changes on "any route on the trunk highway system lying within any municipality." If a T.H. borders a city and no section of the T.H. is completely within the city limits, municipal consent is still required for any of the designated changes (access, capacity, or right -of -way) that do occur within that city. However, if the changes triggering the municipal consent process are on the other side of the T.H. — and thus outside the city's limits — then municipal consent is not required from that city and is not requested from that city. 3 of 5 Municipal Consent HPDP / Scoping C Subject Guidance Mn /DOT City Disapproval If a city disapproves the final layout, Mn /DOT can stop the project (or scale it back so that municipal consent is no longer required), or Mn /DOT can take the project to the appeal process. If the city disapproves — but includes condition(s) for approval, Mn /DOT has the above options plus the option of meeting the city's condition(s), and thus obtaining the city's approval. To do this, Mn /DOT sends the city a letter to that effect with the layout attached (revised to show the changes) ). This completes the municipal consent process; Mn /DOT then has the city's approval. (Sending the letter and revised layout is NOT a resubmittal for further consideration by the city). Appeal Process The appeal process is the same for interstate and non- interstate projects. However, the Mn /DOT Commissioner is not bound by the recommendations of the appeal board with respect to interstate highways. If Mn /DOT decides to go to the appeal process, the first step is to establish an Appeal Board of three members: one member appointed by the Commissioner, one member appointed by the City Council, and a third member agreed upon by both the Commissioner and the City Council. (If a third member cannot be agreed upon, the Commissioner refers the selection to the chief justice of the Supreme Court, who then has 14 days to appoint the third member). After the appeal board is established, the Commissioner refers the final layout to the Appeal Board. The Appeal Board then has 30 days to hold a hearing at which the Commissioner and the City Council may present their cases for or against approval of the layout. Within 60 days after the hearing, the Appeal Board must make its recommendation regarding the final layout. The recommendation can be: • for approval, or • for approval with modifications, or • for disapproval. The board can also make additional recommendations consistent with state and federal requirements as it deems appropriate. The board must submit a written report with its findings and recommendations to the Commissioner and the City Council. 4 of 5 Definitions MN Statute 161.162 Highway Project Review MN Statute 161.163 Final Layout Approval Process MN Statute 161164 Commissioner Action; Interstate Highways MN Statute 161.165 Commissioner Action; Other Highways MN Statute 161.166 Reimbursement of Expenses (for Appeal Board Members) MN Statute 161.167 Municipal Consent HPDP 1 Scoping f Subject Guidance Mn /DOT Legal Basis The Minnesota municipal consent statutes (see links below) were revised in the 2001 legislative session. State Municipal Consent Statutes Helpful Links Mn /DOT Public Involvement Glossary Municipality: A statutory or home rule charter city. Municipal Consent: A municipality's approval of Mn/DOT's final layout for a project on a Trunk Highway when such approval is required by State Statute — see Threshold Criteria below. (Approval is by a resolution passed by the elected council of the municipality — the City Council). Appendix Municipal Consent Process Sample City Resolution 5 of 5 Basic Process 1. Mn /DOT submits the final layout to the City with a letter requesting City approval of the layout. 2_ The City holds public hearing within 60 days of Mn /DOT's submittal and gives a 30 -day (minimum) public notice of the hearing. Mn /DOT presents the layout at the public hearing 3. The City Council passes a resolution approving/disapproving the layout (within 90 days of public hearing). If after 90 days from the public hearing the City has not passed a resolution disapproving the layout, the layout is deemed approved 4. If the City approves, Mn /DOT can proceed with the project. 5. If the City disapproves, Mn /DOT's options are: O Make the changes requested by the City (if any) O Refer the layout to an Appeal Board O Stop the project O Modify the project so municipal consent is not required O Prepare a new final layout and start the MC process over from beginning Appeal Process 1. Mn /DOT notifies the City that it is appealing. Municipal Consent Process Mn /DOT - HPDP /Scoping 60 days 90 days Before Appeal: Total Maximum time = 150 days 2. An Appeal Board of three persons is established: O Mn /DOT appoints a member Undefined time to O The City appoints a member establish appeal board O Third member selected by mutual agreement between the City & Mn /DOT. If they cannot agree, Mn /DOT requests the MN Chief Justice to select. The Chief Justice appoints third member within 14 days of Mn /DOT's request. 14 days 3. Mn /DOT refers the final layout to the Appeal Board. Undefined time 4_ The Appeal Board holds a hearing (within 30 days of receiving final layout from Mn /DOT). The City and Mn /DOT each present their case 30 days 5. The Appeal Board makes its recommendation (within 60 days of the hearing): 60 days O Approval, or O Approval with modifications, or O Disapproval of the final layout Maximum for Appeal Process = 104 days + (plus time to establish appeal board, etc.) 6. If the Board approves, Mn /DOT can proceed with the project. 7. If the Board disapproves, or approves with modifications, Mn /DOT's options are: O Make recommended modifications (if any), and proceed with the project O Stop the project O Modify the project so municipal consent is not required O Prepare a new final layout and start the MC process over from beginning O If it is an Interstate Highway project, Mn /DOT may proceed with the project using the layout that was not approved (and sends a report to the City and the Appeal Board stating the reasons for doing so). TOTAL Possible Time = 254 days + NOTE: If final construction plans contain changes to access, capacity, or right -of -way from the layout approved by the City, Mn /DOT resubmits the changed portion of the plans to the City for approval. (City has 60 days to approve). This holds whether municipal consent was obtained through the basic MC process or through the appeal process. Sample City Resolution RESOLUTION NO. RESOLUTION FOR LAYOUT APPROVAL At a Meeting of the City Council of the City of , held on the day of , 200 the following Resolution was offered by and seconded by to wit: WHEREAS, the Commissioner of Transportation has prepared a final layout for the improvement of within the City of from to and seeks the approval thereof: and WHEREAS, said final layouts are on file in the Minnesota Department of Transportation office, Minnesota, being marked, labeled and identified as Layout No. S.P. from R.P. to ;and WHEREAS, improvements to city streets and appurtenances have been included in the said final layouts. NOW, THEREFORE, BE IT RESOLVED that said final layouts for the improvement of said Trunk Highway within the corporate limits be and is hereby approved". Upon the call of the roll the following Council Members voted in favor of the Resolution: ATTEST: Mayor Dated , 200 STATE OF MINNESOTA The following Council Members voted against its adoption: COUNTY OF CITY OF I do hereby certify that the foregoing Resolution is a true and correct copy of a resolution presented to and adopted by the Council of the City of , Minnesota at a duly authorized meeting thereof held on the day of , 200 , as shown by the minutes of said meeting in my possession_ (SEAL) City Clerk Attachment C Draft Resolution 2010 -052 Revised Conditions - tl.RZEN HILLS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2010-052 RESOLUTION DISAPPROVING THE FINAL LAYOUT OF I- 694/TH51 WITH CONDITIONS WHEREAS, Mn /DOT is proposing to undertake an improvement to 1 -694 and is requesting Municipal Consent approving the layout, WHEREAS, the City of Arden Hills is concerned about the effects the improvement will have on vehicle and non - motorized /pedestrian movements within the City; NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF ARDEN HILLS, MINNESOTA: 1. The City disapproves the layout of the I- 694/TH51 improvement. Attached is a list of conditions in Exhibit A necessary for City approval of the layout. site. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 25 DAY OF OCTOBER, 2010. ATTEST: Patrick D. Klaers, CITY ADMINISTRATOR Stanley D. Harpstead, MAYOR Exhibit A Conditions for Municipal Consent of I- 694/TH 51 Layout 1. The City requests that the revised traffic data outlined in the MnDOT letter dated September 14, 2010 be added to the approved layout. 2. The City requests that MnDOT show the beginning and ending points of the possible noise wall on the proposed layout. MnDOT has estimated the construction cost at $1,525,000 with MnDOT funding $1,050,000 and the City funding $475,000. The City requests that MnDOT commit to paying any construction cost over the estimated $1,525,000. In the event that the construction cost is less than estimated the City requests that their share be prorated. 3. The City requests that MnDOT commit that fill generated on the project will first stay on the project and be used for sound mitigation berming along the south side of 1 -694. 4. The City requests that MnDOT prove that the traffic modeling for the 1- 694/TH51 improvement considered the entire region and the effect the proposed grade separated intersection of TH 10 /CR96 with the loss of some movements will have on the entire transportation system. Furthermore, the City wants MnDOT modeling to document that the proposed improvement will cause no harm and actually provide benefit to the county and local road system beyond Hamline venue County Road F, Lexington Avenue, County Road E and Lexington Bridge over 1 -694. he ity requests that MnDOT commit that there are no city costs associated with the proposed improvements necessary on interstate, county or local system(including changes that might be required on County Roads E, F, Hamline Avenue, Lexington Avenue or the junctions between) to construct the I- 694/TH51 interchange shown on the proposed layout with the exception of noise walls. 6. The City requests that MnDOT work with Ramsey County staff to identify necessary improvements to the Lexington Avenue /County Road F intersection, assist in estimating the costs of such improvements and encumber funding from the Cooperative Agreement funds or other appropriate fund source in a year agreed to by the County. 7. The City requests that MnDOT agree to work with Ramsey County to identify any potential changes that could be made to the Lexington Avenue Bridge and adjoining intersections that would improve their operation and commit to making such improvements prior to the completion of the I -694 interchange. 8. The City requests that MnDOT change the layout as necessary to provide the required spacing and appropriate (barrier) separation for a 10 foot wide bituminous trail on the west side of old Snelling Avenue /old TH 10 as it passes under I -694. 9. The City requests that MnDOT construct a non - motorized/pedestrian bridge across TH 10 to connect to Snelling Avenue north of TH 10 to the trail connection across I -694 identified in #8 above. 10. The City requests that MnDOT show on the approved layout a 6 foot wide concrete sidewalk on the west side of Hamlin Avenue from Floral Drive to County Road F and on the south side of County Road F towards Lexington Avenue to the existing and/or planned sidewalk. 11. The City request that MnDOT include as part of the proposed bridge structure crossing 1 -694 a non - motorized/pedestrian facility that will provide for movements from the west side of Hamlin Avenue to the west side of TH51. 12. The City requests that MnDOT clearly state that the existing area on TH51 available for non - motorized/pedestrian movements will not be lessened in the future with the proposed improvements. (This condition may be redundant) 13. The City requests that MnDOT commit to including the design standards laid out in the Architectural and Aesthetic Design Guidelines for the I -694 Corridor from the Mississippi River Crossing in Fridley to the I -694 Interchange in Oakdale. 14. The City requests that MnDOT affirm the intentions for 2015 reconstructio of the County Road E bridge over TH51 and consider the possibility of moving this construction up in time to match the balance of the regional construction (for bid economies of scale and logistics). The City may be able to advance the funds necessary for this construction given a firm repayment in 2015. • etadit 0 o ROADWAY f7777771 PAVED SHOULDER CURD & GUT TER. RAISED 4 MEDIAN BRIDGE RETAINING WALL POSSIBLE PONDING AREA CONCRETE WALK (PAVING) EXISTING SIGNAL PROPOSED SIGNAL PRELIMINARY CONSTRUCIION LIUITS Arden Hills :4111 e 6 G 0 0 q t r . MAW rden Hil s tinleNt Mailio or. (t Valentine Lake UTNR Ons 4,11 2-7 P) 0 k COLOR OL i KEY REY14£1 UNIVERSITY 2030 Traffic Projections ,* ". 0 0\ O D H W Y 10 10 Tk. I ECT IS IN THE RICE CFrEas WATERSHED DISTRICT. atom. UNIVERSITY ° ••■., yo r r• 0 Arden Hills t,IN, i o tv, . t io: 4" :: NW VW E *Mix RAMP FROM LEXINGTON E=D ROADWAY MIN 0,1 MON COLOR KE PAVED SHOULDER CURB & GUTTER, RAISED MEDIAN BRIDGE RETAINING WALL POSSIBLE PONDING AREA CONCRETE *ALL 1PAVDNII EXISTING SIGNAL PROPOSED SIGNAL PRELDJUMAY CONSTRUCTION LIMITS , --- 8 rir l ‘ _,.....-0.. \ o \ ,-- 1 % ,. \ ...„, - ' . ,- -- 7) -- -,-, • 0 1 t/ —t ago ,....15401 Arden Hill 1 TI