HomeMy WebLinkAbout4B, CP Rail Payment #3A.IRENHILLS Request for Council Action Prepared By: Kristine Giga, Civil Engineer Council Meeting Date: November 29, 2010 CP Rail Bridge Trail Improvements Change Order #1 and Payment #3 in the amount of 142,074.36 Budgeted Amount: $310,000- Construction $30,000- Construction Engineering Actual Amount: $327,587.27- Construction $40,032- Construction Engineering Funding Source: $327,587.27- State Aid $40,032 Park Fund Recommendation: Motion to approve Change Order #1 and Payment #3 to Blackstone Contractors, of Corcoran, Minnesota, in the amount of $142,074.36 for the CP Rail Bridge Trail Improvement Project. Supporting Documents: Memorandum dated November 29, 2010 from Civil Engineer Kristine Giga Memorandum dated October 19, 2010 from Bolton Menk, Inc., regarding Change Order #1 Application for Payment #3 (including Change Order #1) DATE: November 29, 2010 FROM: Kristine Giga, Civil Engineer EN HILLS MEMORANDUM TO: Honorable Mayor and City Council Members Patrick Klaers, City Administrator SUBJECT: CP Rail Bridge Trail Improvement Project- Payment #3 Background The City of Arden Hills awarded Blackstone Contractors, of Corcoran, Minnesota, the CP Rail Bridge Trail Improvement Project on July 12, 2010, for a total contract amount of $312,587.27. Discussion This pay request includes work completed through November 19, 2010. The payment is for $142,074.36; work completed to date includes trail grading and paving, turf restoration, guard rail installation and retaining wall construction. This pay request also includes Change Order #1 in the amount of $15,000. Change Order #1 includes the installation of six additional helical pile anchors. During construction, the contractor was unable to reach the planned depth of six of the anchors due to unforeseen obstructions. Testing and analysis was completed to determine what was needed to meet the capacity requirements of the design. A memo from Bolton Menk is attached, which details the analysis and additional support needed. Financial Implications The construction costs for this project, including Change Order #1, will be paid for using State Aid Funds. Construction payments and subsequent State Aid reimbursements will be coded to the Special Revenue- Park Fund. Council Action Requested Approve Change Order #1 and Payment #3 to Blackstone Contractors in the amount of $142,074.36 for the CP Rail Bridge Trail Improvement Project. City Council Meeting Metro- inet.us \ardenhills\PR &PW\ Engineering \Council_Actions\2o 10\ 11 -29 -1 OMemo_CPRai1_Payment #3 doc Page 1 of 1 BOLTON 8i- NA 1 N Consulting Engineers Surveyors Date: October 19, 2010 To: Terry Maurer, P.E., Public Works Director Kristine Giga, P.E., Civil Engineer Michelle Olson, Parks and Recreation Manager From: Travis Winter, P.E., LEED® AP Subject: CP Rail Bridge Trail City of Arden Hills Project No.: T16.100325 review and authorization. 12224 Nicollet Avenue Burnsville, MN 55337 Phone (952) 890 -0509 Fax (952) 890-8065 www.bolton- menk.com MEMORANDUM During the capacity testing of the helical pile anchors installed as a part of the retaining wall for the CP Rail Bridge Trail Crossing Project, the contractor discovered that six of the eight anchors in the upper row did not meet the capacity requirements of the design. These six anchors held approximately half of the planned working load. To remedy this issue, the contractor submitted a revised design that called for the installation of an additional six helical pile anchors. The revised design information along with field installation logs for the original 16 anchors was submitted to Bolton Menk and LHB Corporation for The field logs from the anchor installations indicate that the upper row of anchors hit obstructions that prevented them from being installed to the planned depth of 50' The contractors anchor design set the depth of the anchors based on the soils information that was available. It relied on the anchors advancing into a layer of stiff clay till in order to develop high enough installation torque values which would translate into adequate bearing capacity. The obstructions that were encountered could not have been foreseen based on the soils information that was available. It is our opinion that the Contractor's original design was adequate, consisting of reasonable anchor depths and substantial anchor size. This design would have met the requirements if the anchors had been installed without obstruction. We concur that installation of the additional anchors is necessary to meet the needed 50 -kip working load. This loading was computed to restrain the bridge abutment and protect the existing bridge structure. It was developed using what would be considered a standard factor of safety for public works projects and is consistent with Mn/DOT design practices. Due to this change in conditions the Contractor is eligible for additional compensation for the work to complete the project. We have worked with the contractor and were successful in negotiating a price reduction from what the work would have cost at the contract price for each of the additional anchors. F:\ Civil\ ARDH\ T16100325 \Corres \memo_101910.doc DESIGNING FOR A BETTER TOMORROW Bolton Menk is an equal opportunity employer Page 2 After negotiation the price for installing the additional anchors will be $15,000. This price is essentially the actual cost of labor and materials for the installation with no overhead or profit for the Contractor. Please contact me to discuss these project developments or to answer any questions you may have as we move forward with the design process. F:\ Civil \ARDH\T16100325 \Comes \memo_101910.doc DESIGNING FOR A BETTER TOMORROW Bolton Menk is an equal opportunity employer. CONTRACTOR'S PAY REQUEST DISTRIBUTION: CP Rail Bridge Trail Crossing CITY OF ARDEN HILLS, MN BMI PROJECT NO. T16.100325 CONTRACTOR (1) OWNER (1) ENGINEER (1) BONDING CO. (1) TOTAL AMOUNT BID PLUS APPROVED CHANGE ORDERS $327,587.27 TOTAL, COMPLETED WORK TO DATE $309,885.61 TOTAL, STORED MATERIALS TO DATE $0.00 DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED $0.00 TOTAL, COMPLETED WORK STORED MATERIALS $309,885.61 RETAINED PERCENTAGE 5% $15,494.28 TOTAL AMOUNT OF OTHER PAYMENTS OR (DEDUCTIONS) $0.00 NET AMOUNT DUE TO CONTRACTOR TO DATE $294,391.33 TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES $152,316.97 PAY CONTRACTOR AS ESTIMATE NO. 3 $142,074.36 Certificate for Partial Payment hereby certify that, to the best of my knowledge and belief, all items quantities and prices of work and material shown on this Estimate are correct and that all work has been performed in full accordance with the terms and conditions of the Contract for this project between the Owner and the undersigned Contractor, and as amended by any authorized changes, and that the foregoing is a true and correct statement of the contract amount for the period covered by this Estimate. Contractor: Blackstone Contractors 7775 Corcoran Trail East Corcoran, MN 55340 By Name Title Date CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT: ENGINEER: BOLTON MENK, INC., ENGINEERS, 12224 NICOLLET AVE., BURNSVILLE, By PROJECT MN 55337. ENGINEER Date APPROVED FOR PAYMENT: OWNER: By Name Title Date And Name Title Date 0_ -J L() ci 0 0 0 0 1 0_ -J CN 69. -J 0 c=i CV_ 0 69. ft oci 69 0 0 UJ I- D 0 uJ 0 w C•1 ft E9. 0_ u_ F.- w 0 z LL.1 0_ 0, 0 z z 0) LO 0) 0 6/9 F- u_ z 7.1 Lo 0) N. 0 C 6ft 0) CD 0) (9. T CO 00 ft 0 1 X Lu 0 0 0 cNi Lo co 69. 0 0 co 0 0 0) 0 1- 69. 0 0 w co w w 0 0 0 (0 (0 Lo 0 F- (.1 0) uJ 0 2 -J 0 0) LU (9 0 0 oo (o 69. 0 LC) 6F). z 0 0 co in Lo (r) 0 CL F- z U1 Lu 0 LL w Lri c6 0 c.6 2 2 0 X UJ U.J F- 0 cc N- 4 69. LL 0 co co Lo CO co 00 1 .6 T 6/9 u_ 0 co co c co 0 w co c (0 (0 69. CD 01 L. 0) Lo 69. u_ 0 10 69. U- 0 u_ 0 0 0) 0 tF). F- u_ a 00 Lo 69. -J 5 0 C.) 0 T Lc) co Eft (7, 69 03 CO CO z c) Lu 0 w (9 cc co UJ w 0 LL 0 oo 69. 69. w 0 0 LL co N- 69. Lri 69 z :11 0 O w (9 uJ 0 cf) 0) 1- z Lu 0 UJ co Ln CO 0) 00 C 69- LL 0 0 00 LO 69 Lu 0 w LL 0) LL. 7.3 10 0, Lo 0, 0 O Lo 1- z 0 0 u_ u_ 0 0 0 C\1 0, w Lu 0_ (9 LL LO C\1 0 0 T ci 69 Lo ce 0 z ck 0) 0 0 CO C\1 Eft Lo 05 u") 0 Lri 0 Lo ci L.° 0 LU LLJ 0) z 0 0 0 0_ co N- 69. LO L.L.1 z 0 X 2 LO 0 C\1 0 LO C\1 LO 69. LC) 0 C\1 cC 0 (9 LU uJ z F- 0 0 0 F/5 0 w 11 0 0_ CN ca (19 0 0 CO 0) 10 c ta 0) -J 0 0 0 0 0 co Lu -J 71 L1J o o o Lo 4- o o 0 0 0 0 0 0 0 CD 0 0 0 0 0 LO 0 00 0 N-00 LO 0000OL00000 LO 0 LI, 0 0 0 o 00 ca 4 co 4 ci ci c.i Lri ca co c\i Lo ci o) d ci d (6I6 cv (6 o o N. 0) CD (N/ CN1 LO CO 1 03 (0 0) e-- c- 4" 0 t's 0 h- N LO 0 0(N T-- 0 Cf) N. N- T- LO N- CO C\1 N- N- N 00 0 ,t CO CO CV 0 N: c- 04 N.: 04 CD LO 0 LO CD N.: C e fft .4- L6 69. E9- 69. (19. C \1 6 9. 64 69 619 69 69. 69. CO LO 69. 69 69 N- 69. 0, 69 E9- 69 0 2 2 E- 0 1- I- 0 0 Z Z Z Z U_ 0 Li_ U_ U- U_ LL 0 LL LL w z co zmzz 0D 000 D 0 0 Ce0C5Z0ZeZZO-OZZZO 0 --1 E N N. CO c;- 1.0 000,100N-N-0001010103,-c7C\ILOC\Ir-CNIMCNI 0 N- 0 0 0 0 C7) o o o o c\I o o o o o o CN1 CY) Lc) LO LO 10 LO LO LC) LO LO Lr) LO 10 LO CO co CO CD LO LO CO CO LO CO (0 CO LO LO Lf) LO LO LO LO LC) CNi c:5 N: 6 6 6 6 C\10000000N-CN 0 CD c-LO LO CN CY) 01 NJ' LO LO LC) CD (0 1`. 0 C•1 0) 'I' 4 4 4 4 4 Lc) Lc) LO LO LD LO LO LO 10 LO 10 LO LO LO LO LO C\l CNC C 01 4 Lc) co N-• co a) o N M Nt LC) CD CO 0) 0 N Cf) LO C.0 N- (X) 0) 0 N NI T- C\I C\ C CNI C•1 C NC \I 01 CY) 01 Ce) Lu FEDERAL PROJECT NO. STATE AID PROJECT NO. SAP 187 020 -013 LOCAL PROJECT NO. T16.100325 CONTRACT NO. CONTRACTOR NAME Blackstone Contractors, LLC ADDRESS 7775 Corcoran Trail E. CITY Corcoran STATE MN ZIP 55340 LOCATION OF WORK: C.S.A.H. 76 TOTAL SUPPLEMENTAL AGREEMENT AMOUNT $15,000.00 STATE AID FOR LOCAL TRANSPORTATION SUPPLEMENTAL AGREEMENT City of Arden Hills June 2008 Supplemental Agreement No. 1 This Contract is between the Local Government Entity and Contractor as follows: Page 1 of 1 WHEREAS: During installation of the upper row of soil anchors for the referenced project, the helical anchors encountered a zone of cobbles and /or boulders near the transition between the soft/firm soil and the stiff clay till. The soil anchors were designed to terminate in the stiff clay till; however, due to the presence of cobbles and /or boulders, several of the soil anchors were unable to advance deep enough into the stiff clay till to develop reasonable installation torque values. Due to the obstructions, some of the anchors could not be backed out or advanced forward. Those anchors failed to meet the required working load. This change of conditions requires an additional six anchors be installed to obtain the needed working load; AND NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: The Contractor has agreed to perform this work for the Negotiated Lump Sum Price of $15,000.00. Approved by Project Engineer: Print Name: Date: Phone: Approved by Contractor: Print Name: Date: Phone: Original to Project Engineer; Copy to Contractor Once contract has been fully executed, forward a copy to DSAE for funding review: The State of Minnesota is not a participant in this contract; signing by the District State Aid Engineer is for FUNDING PURPOSES ONLY. Reviewed for compliance with State and Federal Aid Rules /Policy. Eligibility does not guarantee funds will be available. This project is eligible for: District State Aid En. ineer: Federal Funding State Aid Funding Local funds Date: