Laserfiche WebLink
2011': <br />FZATIE SCHEDULE <br />Senior Principal <br />Principal <br />Specialist* <br />Project Manager <br />,Senior Geologist I Environmental Health & Saftety Specialist I Hygienist <br />Senior Engineerl Scientist 1I Architects (Landscape Architect I Planner <br />Architect I Landscape Architect <br />Land Surveyor <br />Engineer I Planner I Scientist I Geologist I Hygienist I EH & S Speciliast <br />Designer I GIS I Landscape Designer (Graphics <br />Engineering Technician I Senior Project Technician <br />Project Technician <br />Field Supervisor <br />Crew Chief <br />Environmental/ArgiculturM Inspector <br />Inspector <br />Survey Technician <br />GPS, Survey Equipment <br />Total Station Equipment <br />GIS Workstation Equipment <br />GPS Submeter Unit (per use) <br />Flow Meter (per week) <br />Air Detection Equipment (per half day) <br />01M <br />$ <br />122,00 <br />$ <br />155.00 <br />$ <br />116.00 <br />- $ <br />145.00 <br />$ <br />107.00 <br />- $ <br />222.00 <br />$ <br />112.00 - <br />$ <br />140.00 <br />$ <br />125.00 <br />$ <br />149.00 <br />$ <br />107,00 - <br />$ <br />140.00 <br />$ <br />97,00 <br />- $ <br />116.00 <br />85.00 - <br />$ <br />144.00 <br />$ <br />81.00 - <br />$ <br />116.00 <br />$ <br />81,00 - <br />$ <br />101.00 <br />$ <br />63.00 - <br />$ <br />96.00 <br />$ <br />43.00 - <br />$ <br />65,00 <br />$ <br />86.00 - <br />$ <br />132.00 <br />$ <br />66.00 - <br />$ <br />104.00 <br />$ <br />75.00 <br />$ <br />140.00 <br />$ <br />65,00 - <br />$ <br />90.00 <br />$ <br />45.00 - <br />$ <br />65.00 <br />$ <br />38.00 <br />$, <br />28.00 <br />$ <br />22.00 <br />$ <br />80.00 <br />$ <br />200.,00 <br />$ <br />25.00 <br />* Specialist: Experts in highly technical disciplines including Principal Planners, Market Analysts and <br />Certified Industrial Hygienist will be quoted on a per project basis. <br />These rates are adjusted annually in accordance with the normal review procedures of Bonestroo, <br />