My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-12-08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2010 12:43:22 PM
Creation date
12/3/2010 12:43:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re-inspection fee when inspection is necessary to determine whether We unsafe conditions have been <br /> corrected — a fee will be assessed by the inspector ...................................................................................... $40.00 <br /> MinimumFee per Trip ................................................................................................................................ $40.00 <br /> *Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay $90 <br /> or two times the permit fee (which ever is greater) not to exceed $1,000. *For purposes of interpretation, <br /> Minnesota Rules, Chapter 3800, and the most recently adopted edition of the Narional Electric Code shall <br /> be prima facie evidence of We definitions, interpretarions, and scope of words and terms used. <br /> Requests for Elecfical Inspection (REI) with a fee of $250 or less expire 12 months fmm the filing date. <br /> The contractor must have the work completed within the 12-month period or submit another REI that <br /> includes the inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to <br /> another. <br /> Subject to State of MN surcharge fees. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.