Laserfiche WebLink
cubic yards (7,645.5 m3), plus $103.95 for each additional 10,000 cubic yards <br /> (7,645.5 m3) or fraction thereof. <br /> 100,001 cubic yards (7,645.6 m3) or more -$1,447.43 for the first 100,000 cubic yards <br /> I (7,645.5 m3), plus $57.49 for each addi6onal 10,000 cubic yards (7,645.5 m3) <br /> or fracrion thereof. <br /> � Other Inspections and Fees: <br /> 1. Inspections outside of normal business hours ........................................................ $90.00 per hour <br /> (minimum chazge — two hours) <br /> 2. Reinspection fees assessed under provision of Secrion 108.8 ................................ $70.00 per hour <br /> 3. Inspecrions for which no fee is specifically indicated ............................................ $'70.00 per hour <br /> (minimum charge — one-half hour) <br /> *The fee for a grading permit authorizing additional work to that under a valid permit shall be the <br /> difference between the fee paid for the original permit and the fee shown for the enrire project. <br /> **Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, <br /> overhead, equipment, hourly wages and fringe benefits of the employees involved. <br /> I <br /> I <br /> I <br /> I <br /> I <br />