Laserfiche WebLink
E�;HI�IT E <br /> � LA:1�'IIFILL, GRAI3II�'G A.1`1� EXCAVfiTZNG PERR2IT FEES <br /> GRADING FEES <br /> General. Fees shall be assessed in accordance with the provisions of this section or shall be as set <br /> forth in the fee schedule adopted by the jurisdiciion. <br /> Plan Review Fees. When a plan or other data are required to be submitfed, a plan review fee shall <br /> be paid at the time of submitting plans and specifications for review. Said plan review fee shall be set forth <br /> in Table A33-A. Separate plan review fees shall apply to retaining walls or major drainage structures as <br /> required elsewhere in this code. For excavation and fill on the same site, the fee shall be based on the <br /> volume of excavation or fill, whichever is greater. <br /> Grading Permit Fees. A fee for each grading permit shall be paid to the City as set forih in Table A33- <br /> B. Separate permits and fees shall apply to retaining walls or major drainage structures as required <br /> elsewhere in this code. There shall be no separate charge for standard terrace drains and similar facilities. <br /> TABLE A33-A GRADING PLAN REVIEW FEES <br /> 50 cubic yards (38.2 m3) or less ........................................................................................... No Fee <br /> 51 to 100 cubic yards (40 m3 to 76.5 m3) ............................................................................ $37.01 <br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) .................................................................. $58.28 <br /> 1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) ......................................................... $77.57 <br /> 10,001 to 100,000 cubic yards (7646.3 to 7645.5 m3) -$77.57 for the first <br /> 10,000 cubic yards (7645.5 m3), plus $38.59 for each additional <br /> 10,000 cubic yards (7645.5 m3) or fraction thereof. <br /> 100,001 to 200,000 cubic yards (7645.6 m3 to I5,291.1 m3) -$424.86 for the <br /> first ] 00,000 cubic yards {7645.5 m3), plus $20.87 for each additional <br /> 10,000 cubic yards (7645.5 m3) or fraction thereof. <br /> 200,001 cubic yards (15,291.2 m3) or more -$633.55 for the first $20Q000 cubic <br /> yards (15,291.1 m3), plus $11.42 for each additional 10,000 cubic years <br /> (7645.5 m3) or fraction thereof. <br /> Other Fees: <br /> Additional plan review required by changes, additions or revisions to approved plans <br /> (minimum charge - one-half hour) ...................................................................................... $79.54 per hour* <br /> *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, <br /> overhead, equipment, hourly wages and fringe benefits of the employees involved. <br /> GRADING PERMIT FEES <br /> - De12tEd: 50 cubic yards (38.2 m3) or <br /> to 100 cubic ards 40 m3 to 76 5 m3 50.00 �� less .$37.01¶ <br /> I �--- -----y----�-- ------� ---> ......................................,.......,:..._.._......_..._:.........,.-�--.----- - =" s� <br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - 0.00 for the first 100 cubic yards _ �� <br /> (76.5 m3), plus $27.56 for each additiona} 100 cub�c yards (76 5 m3) or fraction <br /> - - - -- - - �' Deleted: 5s.2s <br /> thereof. �� Deleted:58.2s <br /> � 1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) -$3Q��4 for the fitst 1,000 __ __ ^._ ___- peleted: 6 <br /> - ----------------------- <br /> cubic yards (764.6 m3), plus $22.84 for each additional ],000 cubic yards ,����. 3 <br /> (764.6 m3) or fraction thereof. <br /> � 10,00t to 100,000 cubic yards (7,646.3 m3 to 7,645.5 m3) -$5 ],��0 for the first_ 10,000 .---- �eleted: i <br /> cubic yards (7,645.5 m3), plus $]03.95 for each additional 10,000 cubic yards <br /> ------------- -----==- -- DekKed: ss <br /> 42 <br />