My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Masterplan for Downtown 2006-01-11 Color
Centerville
>
Planning & Zoning
>
Downtown Masterplan
>
Masterplan for Downtown 2006-01-11 Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 1:49:44 PM
Creation date
12/13/2010 11:03:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Install water distribution system for <br />potable water consumption and for fire <br />protection; <br />• All utilities should be buried within City <br />Right -of -Way and make connections to <br />individual projects from a 'back of house' <br />location; <br />• All utilities designed according to City <br />standards. <br />Although utilities are not typically seen, they <br />play a vital role by establishing the needed <br />framework for development to move <br />forward. <br />Downtown Centerville <br />Master Plan & Development Guidelines <br />Downtown will be Connected <br />Plans for Utility Improvements <br />January 4, 2006 Page 16 of 34 <br />E.,,mlld. <br />•-�®. <br />w.o.rmn�n lmearemmm� <br />sMlmwa@[IMvrwement. <br />'^'^. • «« • <br />Etla1ing 3lnrmwalea <br />Sm•nllmpvnvem•ny <br />January 4, 2006 Page 16 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.