My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-22 Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-12-22 Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2013 1:05:16 PM
Creation date
12/22/2010 2:16:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(C) Paylnent oj' Permit fees. No excavation permit or obstruction permit shall be <br />issued without payment of excavation or obstruction permit fees. <br />(D) Nonrefundable. Permit fees that were paid for a permit that the city has revoked <br />for a breach as stated in § 93.27 are not refundable. <br />(E) Application to franchises. Unless otherwise agreed to in the franchise, <br />management costs may be charged separately from and in addition to the franchise fees <br />imposed on a right-of-way user in the franchise. <br />(F) Establishment. All permit fees shall be established by resolution of the City <br />Council. <br />(Ord. #74, adopted 1112712002) <br />§ 93.21 PATCHING AND RESTORATION. <br />(A) Tinging. The work to be done under the excavation permit, and the patching and <br />restoration of the right-of-way as required herein, must be completed within the dates <br />specified in the permit. <br />(B) Patch and restoration. The city may choose either to have the permittee restore <br />the right-of-way or to restore the right-of-way itself. <br />(1) City restoration. If the city restores the right-of-way, permittee shall pay <br />the costs thereof within 30 days of billing. If, following the restoration, the pavement <br />settles due to permittee's improper backfilling, the permittee shall pay to the city, within <br />30 days of billing, all costs associated with having to correct the defective work. <br />(2) Permittee restoration. If the permittee restores the right-of-way itself, it <br />shall at the time of application for an excavation permit post a construction performance <br />bond in accordance with the provisions of Minn. Rules 7819.3000, <br />(3) Degradation fee in lieu of restoration. In lieu of right-of-way itself, it shall <br />at the time of application for an excavation permit post a construction performance bond <br />in accordance with the provisions of Minn, Rules 7819,3000. <br />(C) Standards. The permittee shall perform patching and restoration according to <br />the standards and with the materials specified by the city and shall comply with Minn, <br />Rules 7819. 1100. <br />(D) Duty to correct defects. The permittee shall correct defects in patching or <br />restoration performed by permittee or its agents. Permittee upon notification from the <br />city shall correct all restoration work to the extent necessary, using the method required <br />by the city. This work shall be completed within 5 calendar days of the receipt of the <br />notice from the city. <br />
The URL can be used to link to this page
Your browser does not support the video tag.