Laserfiche WebLink
C7ty of Centervl/le page 1 <br /> Pe/tie� Lake Orive Street and Uti/ilylmp�ovements December28, Z010 <br /> It is our understanding that you are contesting this pay item on the basis that you've placed <br /> more Rain Garden Pianting Media (sand) than would be expected based on our measurements <br /> and the rypical sections on the pian. In order for us to consider your argument, we need to have <br /> some documentation from you. This should include a record of your foreman's measurements of <br /> each rain garden's "overflow" line. If this information is not available, we may consider looking <br /> at load tickets for each truckload of sand that was hauled in. We may, then, be able to do the <br /> math to arrive at a square foot number. To date, we have not received either of these pieces of <br /> documentation. <br /> Per section 01200 — 1.03.6, and 1.04.C.1 you are to provide'�...documentation to substantiate Bid <br /> Unit Price work." <br /> Clearwater Drive Improvements <br /> As explained in our October 22"� letter, this work was ordered as a Work Change directive. <br /> 10.01 Au�orized Changes in the Work <br /> A. Without invalidaGng the Contract and without notice to any surety, Owner may, at any time or from time to <br /> time, order additions, deletions, or revisions in the Work by a Change Order, or a Work Change Directive. Upon <br /> receipt of any such daument, Contractor shall promptly proceed with the Work involved which will be <br /> perEormed under the applicabfe conditions of the Contrad Documents (except as otherwise specifically <br /> provided). <br /> B. If Owner and Contractor are unable to agree on entitlement to, or on the amount or extent, if any, of an <br /> adjustrnent in the Contract Price or Contract Times, or both, that should be allowed as a result of a Work <br /> Change Directive, a Claim may be made therefore as provided in Paragraph 10.05. � <br /> You performed the work as the contract calied for, but did not submit a claim as called for in <br /> Paragraph 10.05 of the General Conditions and as modified by the Supplementary Conditions in <br /> the proper time frame or format. Therefore, as outlined below, the Engineer's Decision as to <br /> appropriate compensation stands. This decision is reflected in the pay request submitted for <br /> yourapprovaL <br /> 30.05 Claims <br /> A. Engineer's Decision Required: All Clairr�, except those waived pursuant to Paragraph 14.09, shall be referred <br /> to the Engineer for decision. A decision by Engineer shall be required as a wndition precedent to any exercise <br /> by Owner or Contractor of any rights ar r�medies either may otherwise have under the Contract Documents or <br /> by Laws and Regulations in respect of such Claims. <br /> B. Notice: Written notice stating the general nature of each Claim, shall be delivered by the daimant to <br /> Engineer and the other party to the Contract promptly (but in no event later than 30 days) after the start of the <br /> event giving rise thereto. The responsibility to subsbntiate a Gaim shall rest with the party making the Claim. <br /> Notice of the amount or extent of the Qaim, with supporting data shall be delivered to the Engineer and the <br /> other party to the Contract within 60 days after the start of such event (unless Engineer allows additlonal time <br /> for daimant to submit additional or more aaurate data in support of sudi Claim). A Claim for an adjustrnent in <br /> Contract Price shall be prepared in accordance with Uie provisions of Paragraph 12.01.6. A Gaim for an <br /> 15 <br />