My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pavement Management Plan
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2011
>
Pavement Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2011 10:24:41 AM
Creation date
2/10/2011 10:24:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> � <br /> All sewers in the Ciry have been televised previously. While some small sections appear to need <br /> ' repair, most sewers in the city are adequate and no additional work is necessary. It is recommended <br /> that sewer tapes be reviewed and manholes inspected as part of each reconstruction project. <br /> � <br /> � Water Main Repairs <br /> When overlay and street reconstruction type projects are considered for an azea, it is recommended <br /> � the history of the existing water main system be reviewed. If repairs/upgrades are required, they <br /> should be done with the project. <br /> � <br /> As shown on Figure No. 6, several residential streets in the City do not have water main. When <br /> � streets such as Shad Avenue and Center Street are reconstructed, new water main will be extended. <br /> � Service lines, hydrants and gate valves will also be installed to meet the City's standards. <br /> , <br /> . , <br /> � <br /> � <br /> � <br /> i <br /> �! <br /> 't � <br /> �1 <br /> ; 1 <br /> 1 Centerville Pavemertt Management Study 18 <br /> I — _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.