Laserfiche WebLink
I <br /> I <br /> � COST ESTIMATES <br /> The foilowing table depicts the costs that would be incurred to meet the requirements of RCWD. <br /> TABLE 4- STORM SEWER AND STORMWATER COST ESTIMATE <br /> Item Total Price <br /> Storm Sewer $321,600 <br /> Pervious Pavement $37,800 <br /> Rain ardens $105,000 <br /> Common Excavation, onds $17,400 <br /> Irri ation S stem ,000 <br /> Groundwater Su I Well $, 00 <br /> Construction $789,800 <br /> Contin enci %) 9,500 <br /> En ineerin , Admin., Le al, Bo ' �o) 00 <br /> cost al, <br /> Alternate Addition - Storm Water 0 tion nd Location $286,2 <br /> � <br /> � <br /> City of Centerville Project No: 616-07-1610 <br /> Downtown Redevelopment �i �n�r� Page 11 <br /> I <br />