Laserfiche WebLink
Potential Phasing <br /> The completion of the proposed infrastructure is needed at varying times throughout the developer's four <br /> phases, As such, the improvements detailed throughout this report can be divided into two separate phases <br /> if the City so desires. Phase 1 of the public infrasVucture improvements would correspond with Phase 1 of <br /> the developer's proposed buildings. The second phase of infrastructure improvements would take place <br /> with the construction of the developer's Phases 2 through 4. This general concept can be seen depicted in <br /> figure 11. <br /> The following cost estimate correlates with the identified potential pha ' <br /> TABLE 7- TOTAL PROJECT COST ESTIMATE SE 1 <br /> Phase 1 T <br /> Sueets $6 <br /> Sanita Sewer $88,2 <br /> Water Main $103,100 <br /> Storm Sewer & BMP's $293,500 � <br /> SUeetsca in $405,400 <br /> Total Phase 1 Cost 51,537,700 I <br /> TABLE 8- TOTAL PR CT CO � �� E PHASE 2- I <br /> Phase 2- Total Price ' <br /> SVeets $219,400 I <br /> Sanit wer $93,200 <br /> W $73,900 <br /> Storm Se MP' $772,700 I <br /> a in $953,900 <br /> 2-4 $2,113.100 I <br /> Recomm tions <br /> It is the findings of this dy that the improvements are necessary, feasible, and cost effective. It is <br /> recommended that the City Council for the City of Centerville adopt this report and its recommendations as <br /> a guide for development of the proposed improvements. <br /> Please refer to the following Figure for the proposed schedule. <br /> City of Centerville Project No: 616-07-1610 <br /> Downtown Redevelopment � �n�� Page 23 <br />