My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pavement Management Plan
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2011
>
Pavement Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2011 10:24:41 AM
Creation date
2/10/2011 10:24:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Streetscape Cost Estimate � Bonestroo <br /> Pro Connection to Cou Trail <br /> Item Qty. Units Unit Price Tot�l P�ice <br /> Wa/kways <br /> BiWminous Trail (10' wide) 3,000 SF E2 56,000 <br /> Pedestrian Light Fixtures 4 EA $3,500 814.000 <br /> Concrete Bases & Wiring 4 EA $500 S2,OOQ <br /> Conduit-LighUng 600 LF $2 $1,200 <br /> ComUuction Cost E23,200 <br /> CoMingencies (5%) $1,160 <br /> Enginee�ing (3096) $7,308 <br /> Total Cost S31,666 <br /> Altertiate Addition -Altemate Connection to Co� Trail <br /> I[em Qty. Units Unit Price Total Price <br /> Wa/kways <br /> Bituminous Trail (10' wide) 27,500 SF $2 $55,000 <br /> 4" Regular Concrete 1,950 SF $4 $6,825 <br /> Pedestrian L'ght Fixtures 8 EA $3,500 $28,000 <br /> Concrete Bases & Wiring 8 EA 5500 $4,000 <br /> Conduit-Lighting 1,400 LF $2 $2,800 <br /> Constnktan Cost 596,625 <br /> CoMi�ncies (5%) $4,631 <br /> Engineeriog (3096) $30,437 �' <br /> Total Cost 5131,893 ' <br /> I <br /> I:\616\616071611Word�Work_In_Progress\Streetscape Costs_092007.x1s <br />
The URL can be used to link to this page
Your browser does not support the video tag.