Laserfiche WebLink
Exhibit B <br /> Centerville, at its cost, will operate, inspect and maintain the stormwater management facilities <br /> indicated within the plans and specification under section 1 of the MOA as follows: pond, storm <br /> water reuse / irrigation system. Centerville will: <br /> a. Operate the water reuse/irrigation system for irrigation suppiy when weather <br /> conditions and pond water elevations are suitable for irrigation activities. <br /> b. Inspect stormwater reuse/irrigation system at least once annually. <br /> c. Accumulated sediment and debris will be removed and erosion or structural problems <br /> will be corrected when reasonably necessary so that the facility continues to operate as <br /> designed. <br /> d. Perform routine maintenance activities on the water reuse/irrigation system. <br /> e. Collect pump run-time data or flow meter data on an annual basis following the <br /> installation of the system. These data and pump capacity ratings will be submitted to <br /> the RCWD on an annual basis once the system is in operation for the first full three years <br /> of operation. At the end of the third growing season, the average of the three full I <br /> seasons' irrigated volume will be used to determine the final capacity of the facility. <br /> After the �rst full three years of operation of the system, pump run-time data or flow I <br /> meter data must be collected on an annual basis and reported to the RCWD to verify the � <br /> system is operating at the approved capacity. <br /> I <br /> i <br /> i <br /> I <br /> i <br /> 43 <br />