Laserfiche WebLink
( tei-vidz <br /> tAedJ& <br /> Construction Meeting Minutes <br /> Project: Regional Trail Link/Park <br /> Owner: City of Centerville Bonestroo Project No. 616- 08165 -0 <br /> Owner Project No. 2011 -01 <br /> Date of Meeting: May 25, 2011 Meetin No. 2 <br /> Name Representing Phone # <br /> Greg Burmeister City of Centerville 651 -503 -1834 <br /> Mark Statz Bonestroo Engineering 651- 775 -5126 <br /> Mark Daly Bonestroo Engineering 651- 324 -7422 <br /> Jed Johnson Veit Construction 612 - 490 -4154 <br /> Jeff Madsen Veit Construction 612- 490 -8604 <br /> Rick Smith Veit Construction 612- 3284538 <br /> CONSTRACTOR SCHEDULE: <br /> • Installing storm sewer in Mill Road (Seg. E) <br /> • Stripping top soil & grading in Laurie LaMotte Memorial Park (Seg. K -1 & K -3) <br /> • Stripping top soil & grading Sorel (Seg. 1) <br /> • Arcade Tree Service still has trees on Seg. L & P -1 to remove and all stumps to grind. <br /> • Neatar Bros. will be in on Tuesday, May 31" to install silt fence on Seg. I, P -1, P -2 & Q <br /> ITEM DESCRIPTION ITEM ACTION <br /> BY <br /> 1 We discussed trail fabric woven vs. non -woven and agreed to change Veit <br /> to non - woven. Veit will supply us with the certificates. <br /> 2 Mark Daly reviewed the "poster board." They still need all payrolls, Veit <br /> state, federal and truck rates. <br /> 3 Rick Smith agreed to bring updated project schedule to next weekly Veit <br /> meetin <br /> 4 We discussed tree removal and grinding vs. grubbing. Specifications <br /> describe grubbing as removal of brush, stumps, roots and other <br /> remains to a minimum of 6" below sub-grade. <br /> 5 Discussed existing catch basin south of Seg. H trail at station 4 +50. Veit <br /> This catch basin needs to be extended 8 lineal feet southwest to allow <br /> for acceptable slopes. <br /> 6 Greg Burmeister will get the "Right of Entry" signed by the City of <br /> homeowner for this work Centerville <br /> 7 Discussion regarding the "suspect" soil encountered on Seg. H. Veit <br /> Mark Suggested that Rick send a letter to him. Rick Smith is to send <br /> a letter to Mark regarding this issue. <br /> 8 Discussed "improved pipe function" for storm sewer where poor Veit / <br /> soils are encountered. Mark will check to see if MNDOT has prices. Bonestroo <br /> Veit is to forward prices to Mark Daly so he can forward to Ted <br /> Snyder for approval. <br /> 9 Stffl waiting on submittals from Veit to Bonestroo for roval. I Veit <br />