My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-06 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2011
>
2011-07-06 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2011 2:32:55 PM
Creation date
7/6/2011 2:32:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.�.� _ � . <br /> TO: Parks & Recreation Committee <br /> FROM: Kim Stephan <br /> DATE: June 30, 2011 <br /> SUBJECT: Updates <br /> Lishting of Flagpole at Cornerstone Park <br /> At the June Parks & Recreation Meeting while discussing this project it was assumed that there would be <br /> electric to Cornerstone Park at some time. Mr. Paul Palzer, Public Works Director said this is not the case, <br /> as electric was removed by Council in the packages that were put out for bid, so there will not be electric at <br /> the park at all. Solar lighting may be the best option. � <br /> Email correspondence from Mr. Palzer: <br /> i <br /> I did meet with Rob last week and I also had previously provided to him the solar LED lights that are � <br /> available to be installed on the pode due to the is ue that there will not be any power to that area for �� <br /> lighting. Power could possibly come from the cabinet for the street lights, but I have not spent the money to , <br /> determine if this is possible. I told Rob that if the solar lights were not a possibility and running power to i <br /> the flag also was not possible, I would not want him to buy the lights ahead of time due to issues with proper � <br /> UL listings, style and storage. � <br /> I asked Mr. Palzer how much the solar lights he suggested to Rob Faust were and he replied: I ! <br /> I did provide Rob with a solar light that cost $159.00. Did he share this with the committee? It mounted ', <br /> from below the fl'ag so there would not be a glare or traffic issue. The gold finished ball that needs to be <br /> replaced costs $28.25. Halyards cost $.SO per foot, retainer ring costs $46.35, snap hooks are $6.50 and a <br /> cleat cover box is @244. SO <br /> The cleat box cover could be eliminated if the cleats are mounted higher up on the flag pole so it could not <br /> be easily reached, but the other parts are necessary. <br /> Veteran's Memorial Plaaue Su�sestion: <br /> Honoring all those who have served & protected our freedom. <br />
The URL can be used to link to this page
Your browser does not support the video tag.