Laserfiche WebLink
Equipment Purchase Pian <br /> 2012 <br /> E ui me� Location Reeomme�ded New � meni Eat Cost Wr Esd+ Qua " Totel Cost <br /> Production TrUCk Swiicher Cor�trec�t $ 2,000.04 1 $ 2,000.00 <br /> Grass Valle Turbo HD/SD Animation VTRlpDR $ 7 000.00 7 7 000.00 -7,000 <br /> V'inien Tri od 3880-3 Al. 3 S!a e PQZi Loc $ 2,300.0(1 4 $ 9,200.00 <br /> DT-12 Cat�leAbreak oul box. DT-12 MIF fantails $ i,300.� 1 $ 1.300.OD <br /> $ - <br /> Sub Totel: S 19 500.0D 12,500 <br /> Studio A Te1e om er Scr�er� $ 3,500.00 1 $ 3,500.U0 <br /> IPS Dimmer Ber $ 3,Op0.90 I $ 3,000.00 <br /> Sub Total: 5 6,5U0.00 6,500 <br /> Staif Portable D] ital Camcorders/cards,lenses $ 6,500.00 3 $ i 9,500.00 <br /> 7riCaster S stem $ 21,000.00 7 $ 21 000.00 -2�.000 <br /> Li hts aAd stands $ 4,000.00 1 $ 4,000.00 <br /> Sub Totel: : 44,500.00 23,500 i <br /> I <br /> � <br /> Public Portable ' <br /> I <br /> Sub Total: S <br /> Public Editin Mac Editin S 42ms/Software rade $ 5,000.00 3 $ 15,000.00 -10,000 I <br /> Pr 'ector $ 700.00 1 $ 7A0.00 i <br /> I <br /> SubTotal: S 15,700.OU 5,700 ', <br /> Staff Editin Edi[ Controllable DVC Pro Deck $ 7,000.00 1 $ 7,000.00 -7,000 II I <br /> SDI Monitor $ 2,500.00 1 $ 2,SOO.AO � <br /> Sub Total: S 9,500.00 2,500 <br /> I <br /> Master Control Ti hiro Mainienance Contract $ 3,500_00 1 $ 3,500.00 � <br /> Marshail Quad Monitor $ 1,300.00 1 $ 1,300.OD <br /> Audio tevel Control $ 1,3fl0.00 3 $ 3,900.00 <br /> Audio Monitor with meters $ 1,290.00 1 $ 1,290.00 <br /> Installation $ 800.00 1 $ 500.00 <br /> SubTotaf: S 50,790.U0 10,790 <br /> M+scellaneaus Micro hones, tri ods, batteries, li hts, $ 15,000.00 1 $ 15,000.00 -2,000 <br /> headsets <br /> Sub Tofal: S 15,000.00 13,fl00 <br /> ui ment Total: $ 721,490.OD $74,490.A0 <br /> Tax: $ 8,656�i6 $ 5.307.41 <br /> Total: $ 130,146.18 $ 79,797.41 <br /> P.10 <br /> � 33 <br />