Laserfiche WebLink
PROJECT COST <br /> BASE COST <br /> DEVELOPMENT IMPROVEMENTS $381 <br /> OVERHEAD (ENGINEERING, LEGAL, <br /> ADMINISTRATION) $ 144,985.45 <br /> TOTAL BASE PROJECT COST $526,162.95 <br /> BASE COST PLUS ALTERNATIVES <br /> DEVELOPMENT IMPROVEMENTS $381,277.50 <br /> WATERMAIN ALTERNATIVE 1 $ 28 <br /> WATERMAIN ALTERNATIVE 2 $ 11,187.50 <br /> TOTAL CONSTRUCTION COST $420 <br /> OVERHEAD (ENGINEERING, LEGAL, <br /> ADMINISTRATION) $ 159,832.28 <br /> TOTAL PROJECT COST <br /> WITH ALTERNATIVES $5809443.53 <br />