Laserfiche WebLink
MILLER <br /> WESTERBECK MEMORANDUM <br /> BERGER, INC <br /> ARCHITECTS &PLANNERS <br /> 1201 HAWTHORNE AVENUE <br /> MINNEAPOLIS, MN 55403 <br /> (612) 332 -54201 FAX (612) 332 -5425 <br /> COMM. NO.: 97016 DATE: 30 March 1998 <br /> RE: Centerville Senior Housing <br /> Centerville, MN <br /> TO: Tim Yantos, A.C.H.R.A. <br /> Tom Dillon, D.D.C. <br /> Stuart Bestul, Frana & Sons <br /> Mike Hattenberger, Frana & Sons <br /> Jim March, City of Centerville <br /> BY: Bekah Padilla <br /> Construction meeting at job trailer, 9:00 a.m., Tuesday March 10, 1998. <br /> Present: Mike Hattenberger <br /> Tom Dillon <br /> Bekah Padilla <br /> TO BE <br /> ADDRESSED BY SCHEDULE <br /> 1. Frana is approximately 1 -1/2 to 2 weeks ahead of schedule. Hanging cabinets is scheduled <br /> to begin on 3/12. 2 units are partially sheetrocked, 14 units are completely sheetrocked. The <br /> common areas are being stocked with sheetrock, Mike plans to begin rocking the common <br /> areas by 3/12. <br /> Mike expects siding to begin within a couple of weeks, weather permitting. Bituminous work <br /> will begin the first part of May. It was noted that the timing is crucial regarding the sitework. <br /> DETAIL ISSUES <br /> Final mechanical plans were reviewed. <br /> Frana 1. Stuart will verify whether having a carbon dioxide detector with the garage exhaust fan on <br /> a timer is preferred to having the garage exhaust fan run continuously. <br /> Frana 2. The size of the corridor exhaust fans will be verified by Mike. <br /> Frana 3. Mike verified the adequate sizing of the furnace and the water heaters, per Tom's request. <br /> GENERAL ISSUES <br /> Frana 1. Frana to secure a sign permit from the City. <br /> DDC/Frana/MHWB 2. The final costs need to be worked out before a change order will be issued. <br /> 3. The City approved the sprinkler plans. <br /> 4. The sprinkler heads were installed per Thieny Chevallier's direction. Some locations were <br /> revised. <br /> MHWB 5. The sod/seed defutition line was discussed. Bekah will bring a reduced (11x17) Landscape <br /> Plan showing the sod/seed line to the next site meeting. <br /> Next site meeting: Tuesday March 24th at 9:00 a.m., at the job trailer. <br /> Page 1 of 1 <br /> IF INFORMATION CONTAINED HEREIN DOES NOT CONCUR WITH YOUR RECORDS, PLEASE ADVISE US OTHERWISE WE WILL ASUME CONTENTS TO BE CORRECT. <br />