Laserfiche WebLink
ITEMS FOR CONSIDERATION <br /> JOINT POWERS AGREEMENT <br /> 21ST AVENUE ROADWAY <br /> RECITALS <br /> a. The City of Lino Lakes and the City of Centerville desire to improve 21st <br /> Avenue by constructing street, curb and gutter, and storm sewer between from 1,300 feet <br /> north of Main street md goo feet seeth of Niftift 9 to Cedar Street, along <br /> the entire corporate boundary between Lino Lakes and Centerville. <br /> b. The City of Lino Lakes has prepared a feasibility study of the Project south of <br /> Main Street and both cities agree to construct the Project, in phases, as described in the <br /> feasibility study. <br /> C. A portion of the Project is to be constructed within the corporate limits of the <br /> City of Lino Lakes and a portion is to be constructed within the corporate limits of Centerville. <br /> The Phase I of the Project is located along the 21st Avenue alignment between Main Street, <br /> and approximately 809 feet south of Main Street (Exhibit A). <br /> f. Lino Lakes and Centerville will both assess the benefited properties within their <br /> jurisdictions for all, or a portion of the relevant costs of the Project, all as is more fully set <br /> forth below. <br /> AGREEMENT <br /> a. Lino Lakes shall design Phase I of the Project, administer the <br /> construction of Phase I thFrejeet, and conduct inspections of the construction <br /> process. Lino Lakes shall have the right to inspect, review, and comment upon <br /> 0:*oj%02690 1690 -1W6.m .agmement Page 1 <br />