Laserfiche WebLink
DRAFT MARCH 6, 1998 <br /> used by the average water consumed per household. Payments shall be made on or before the <br /> 20th day of the month following the end of the quarter, and shall be administered by current <br /> city ordinance. Centerville shall pay for project costs, including construction costs, pre - <br /> engineering, and construction engineering, for the Centerville meter vault systems. Lino <br /> Lakes shall pay for the cost of the Lino Lakes control systems. <br /> SECTION 3 WATER STANDARDS AND CONSTRUCTIO N <br /> 1. Lino Lakes and Centerville agree that they shall exercise reasonable care to <br /> prevent toxic or harmful substances from contaminating the water supply of either party. Each <br /> city's water supply shall provide clean, safe, potable water. On a yearly basis, each city shall <br /> supply the other city with copies of yearly analytical test data from the Minnesota Department <br /> of Health, Division of Environmental health. In addition, on a yearly basis, each city shall <br /> supply test results from a recognized testing lab, whose analyses were performed by EPA or <br /> other recognized standard procedures. There shall be results provided for hardness, <br /> manganese, iron, and volatile organics. If either city allows volatile organics to be discharged <br /> into the water system, such items shall be eliminated by the responsible city. Failure to <br /> comply with this section shall be ground for immediate termination of the water exchange <br /> system. <br /> 2. The designated place of connection of the water system of Centerville with the <br /> water system of Lino Lakes is designated as the intersection of 20th Avenue and Cedar Street. <br /> In the event either party feels the expansion of the water system within the city's boundaries <br /> will adversely impact its ability to supply water to its residents, it may elect to terminate this <br /> Agreement upon three (3) years written notice. Lino Lakes shall waive any permit application <br /> or fee for work in utility easements or connection. <br /> 0: \proj \260085 \085- 2303.feb.joint usage Page 3 <br />