Laserfiche WebLink
Centerville/Lino Lakes Water Interconnect Agreement <br /> recommended addition(s): <br /> The City of Centerville shall complete the construction of a water storage reservoir within <br /> 3 years when the average daily water use of Lino Lakes plus the average daily water use <br /> of Centerville, as measured by the water system interconnect meter, measured over any <br /> continuous 30 -day period, exceeds x% of the City of Lino Lakes firm pumping capacity. <br /> 10ee'v2,� k" Goo e�.6-'r <br />