My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-03-11 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-03-11 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 10:52:21 AM
Creation date
8/22/2011 10:52:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Centerville/Lino Lakes Water Interconnect Agreement <br /> recommended addition(s): <br /> The City of Centerville shall complete the construction of a water storage reservoir within <br /> 3 years when the average daily water use of Lino Lakes plus the average daily water use <br /> of Centerville, as measured by the water system interconnect meter, measured over any <br /> continuous 30 -day period, exceeds x% of the City of Lino Lakes firm pumping capacity. <br /> 10ee'v2,� k" Goo e�.6-'r <br />
The URL can be used to link to this page
Your browser does not support the video tag.