Laserfiche WebLink
DRAFT - MARCH 6, 1998 <br /> 6.0 CONCLUSION <br /> The proposed project would provide City streets and utilities for the lots in Parkview <br /> Addition. Watermain alternatives 1 and 2 would also improve the City system by <br /> looping existing dead end lines and by providing watermain for future extension or <br /> looping of the watermain. The estimated total cost of the project including all <br /> alternatives is $581,937.38, with costs within the development assessed to the <br /> developer, and some of the costs outside of the development assessed to adjacent <br /> property owners. <br /> Based on the information gathered and the analyses presented, the proposed <br /> improvements are feasible from an engineering point -of -view. <br /> FEAS•260.089 7 <br /> 260089m <br />