My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-01-28 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-01-28 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 10:54:36 AM
Creation date
8/22/2011 10:54:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
which we provided. The owner is very interested in <br /> Centerville because of our location, freeway access and <br /> proximity to their major accounts. They will be working with <br /> the owner to try and acquire this site. <br /> * Our cable access equipment blew up during our last power <br /> outage. We had the cable commission technician look at the <br /> equipment and he indicated that it could be the keyboard or <br /> the modulator that was damaged. He indicated that they did <br /> not have the ability to solve the problem themselves and <br /> referred us to a technician from the White Bear Lake system. <br /> We are exploring the costs of repairing our current system. <br /> The equipment we now use is original equipment dating back to <br /> when the cable commission purchased equipment for all of the <br /> cities. Of the seven communities in the cable system, I <br /> believe we are one of two communities that have not upgraded <br /> the cable access equipment. It may be to consider this <br /> option. <br /> * A meeting was held with Gerald Rehbein on Thursday to discuss <br /> the water and sewer extension down 20th Avenue. The item is <br /> going to be placed on the agenda for next Wednesday. A <br /> timeline has been prepared for this project, based on bidding <br /> the project in mid February. We would have to hold an <br /> assessment hearing, before awarding this project. I have <br /> asked the Engineer to prepare a cost estimate of deepening the <br /> gravity sewer proposed to be installed by Met Council versus <br /> constructing our own lift station to serve this corridor. The <br /> Engineer will be prepared to present this information at our <br /> next meeting. I have been reviewing the joint powers <br /> agreement that we received from Lino Lakes. I believe we <br /> should include the interconnect, temporary service to the <br /> proposed convenience store and a proposed utility rate policy <br /> in one agreement while we have some leverage with Lino Lakes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.