Laserfiche WebLink
PARTIAL PAYMENT E.STINIATE <br /> NO. 2 <br /> FRO %: It NE 13, IM <br /> TO: ILLY 14, I'V)N <br /> CONTRACTOR: aONINF. EXCAVATING. INC <br /> ADDRESS: 1'NO MEADOW VALE ROAD, ELK RIVER, MN 59330 <br /> OWNER CITY OF CENTF.RVILIC, MINNF50TA <br /> PROJECT: 2(MRIM <br /> COMPLETION DATE AMOUNT OF CONTRACT: $508,790.65 <br /> ORIGINAL: ORIGINAL: <br /> REVISED: REVISED: <br /> EONTRACP ITEit5 ;i 'f TIRES FEN!lb .1 AL 1'0 DATE £ <br /> [TEVE <br /> NU. V6 lTiON - EN IT Q'FY. UNIT QTY. AMOt; QTY: AIx1f DN <br /> PRICE <br /> SCHEDULE I 0 SEERWORK <br /> I CLEARING AND GRABBING TREE 20 $50.00 so w 95 sl,rom <br /> CLCARLYG AND GRUBBING ACRE 1 $400.00 sow wm <br /> 3 REMOVE WOVEN WIRE FENCE LF 4200 $0.40 sow saw <br /> 4 SALVAGE AND INSTALL SIGN EA 6 $60.00 sum so,w <br /> 5 SALVAGE GA "I'E EA I 575.00 sow sow <br /> 6 TOPSOIL BORROW CY 2500 $1.00 so W S0 _w <br /> SEEDING AC 4 5450.00 sow sow <br /> 8 MULCHING AC 4 5105.00 so .w sow <br /> 9 SODDING SY 1500 $1.50 Sow so IS) <br /> 10 SILT FENCE LF 500 $1,25 3w $375 ED 4W S5wL0 <br /> T SCHEDULE 1.0 SITEVVORK- TOTAL <br /> $175 DO zs,zsnw <br /> $SHEDL F 2 0 STREET CD-NSTRLiJI0,V <br /> I REMOVE CONCRETE CURB AND GUTTER LF 50 52.00 so .w saw <br /> 2 SALVAGE AGGREGATE(CV'I CY 65 53.00 50w s0 .w <br /> 3 MILL EXISTING BI7UMINOUS PAVEMENT SY 35 Sim $0.w sow <br /> 4 SUBGRADE PREPARATION SY 300 50.50 50.w sow <br /> 5 GEOTEXTILE FABRIC SY 300 SI.00 5o.w So <br /> 6 4' PERFORATED THERMOPLASTIC DRAIN PIPE LP 200 55.00 5000 wal <br /> 7 SELECT GRANULAR BORROW ,CV) CY 350 $7.50 So w so w <br /> N .AGGREGATE SHOULDERING, CLASS 2 TON 310 515.75 sow So w <br /> 9 AGGREGATE BASE, CLASS 5 TON 135 $11 25 so .w sow <br /> 10 BITUMINOUS WEAR COURSE, TYPE 41 A TON 40 570.00 som SD .w <br /> 11 SUPMOUNTABLE CONCRETE CURB -AND GUTTE I. 50 515.00 sow _.._. <br /> 12 STANDARD PROCTOR EA 1 $100.00 sow sow <br /> ❑ IN -PLACE DENSITY EA 10 S50.00 50.W Sow <br /> T SCHEDULE 2.0 STREET CONSTRUCTION -TOTAL Sow so .W <br /> vr.PngA2W 95Y2 PAGE 1 <br />