My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-07-22 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-07-22 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 11:18:44 AM
Creation date
8/22/2011 11:18:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUL -17 -1999 15 :22 P.61102 <br /> MS1 <br /> Howard R, Greer Company ) . --� <br /> CONSULTING ENGINEERS ru�1�,'n'saMSA <br /> FOfmCRy MSA <br /> G'd]SUkdKj' �H�A �CB/i <br /> July 17, 1998 <br /> File: 260089m -0060 <br /> Mr, Jim March <br /> City Administrator <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> RE: PARKVIEW ADDITION <br /> REVIEW OF BIDS <br /> RECOMMENDATION FOR AWARD OF CONTRACT <br /> Dear Mr. March: <br /> Or. July 14, 1998, bids were opened for the Parkview Addition project. Several <br /> alternates were bid for the project. Below are the results of the bid opening, including <br /> the alternate bid costs for the road connection to Dupre Read and also the watermain <br /> extension to Center Street: <br /> Bonine Excavating, Inc. $513,018.45 <br /> Inland Utility Construction $517,797.62 <br /> Berbarosse & Sons, Inc. $525,137.00 <br /> S.R, Weidema, Inc. $556,450.10 <br /> Brown & Cris $566,379.55 <br /> Northdale Construction $575.282.95 <br /> Bcnine Excavating is the low bidder on the project. Bonine Excavating is the contractor <br /> also working on the 20'' Avenue project in Centerville. The bid from Bonine Excavating <br /> can be divided as follows: <br /> Dupre Road Connection $27,89250 <br /> Center Street Watermain Extension $17,817.95 <br /> Watermain Extension to Senior Housing $55,509.60 <br /> Parkview Development Project $411.998.40 <br /> Total $513,018.45 <br /> The above costs compare with the costs below from the feasibility study completed <br /> earlier this year. <br /> O:PRW260089rr=8 - 1705.)uly.dne <br /> 1::26 Energy Park Drive • SL Faui, MPl 55108 - 8121644 -0389 fox 61Z'644 -944fi toil lrap 688/368.4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.