My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-07-08 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-07-08 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 11:29:38 AM
Creation date
8/22/2011 11:29:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,t_ -02 -1998 08:3e P,02i09 <br /> Howard ,R. Green Company <br /> CONSULTING ENGINEERS Fvm«Ynaaa <br /> Cora ifft Engineers <br /> July 7, 1998 <br /> File 803990J(0240) <br /> Mr. Jim March <br /> Administrator <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> RE: PRELIMINARY PLAT REVIEW <br /> CENTER VILLA DEVELOPMENT <br /> Dear Mr, March: <br /> We received a set of the preliminary plat, grading plan, and concept plan for the <br /> proposed Center Villa development on the Lake Area Utility property. We received the <br /> plan set on June 30, 1998. We would like to take this opportunity to offer the following <br /> preliminary comments on the plans and plat. We will have additional comments at the <br /> July o 1998 planning and zoning meeting. <br /> ZONING ISSUES <br /> At the previous planning and zoning meeting In June, we discussed this plat and the <br /> potential for a zoning change an the property. Currently, only the eastern 300 feet Is <br /> zoned for commercial use. The developer is seeking a mixed use designation. We <br /> recommend that this plat, whatever the final configuration, be considered as a PUD. <br /> The and location adjacent to commercial and industrial areas as well as residential <br /> areas lends itself to a mixed use development, transitioning from residential on the <br /> western side to commercial on the eastern side of the parcel. <br /> BRIAN DRIVE — STREET ISSUES <br /> One item that needs to be discussed at the July 6 planning and zoning meeting is the <br /> proposed streets within this development. There has been discussion in the past of the <br /> road providing access to 20 Avenue connecting with Brian Drive to form a through <br /> street. The current plan shows the road off of 20"' Avenue ending In a cul -de -sac. Brian <br /> Drive would be extended to the south and connect with Eagle Trail, part of the Eagle <br /> Pass development. <br /> At the June 2 " planning and zoning meeting, several residents in the area attended the <br /> meeting to discuss development of this parcel and along 20"' Avenue. Residents of <br /> Clearwater Meadows and possibly even the Center Oaks 2 development will most likely <br /> oppose a road connectlor, with 20"' Avenue. The plan as shown would separate the <br /> commercial traffic from the residential traffic. <br /> 0: \PF acc <br /> 132 ". energy Park Crve - St. Pau:. MN 55108 - 8/2/844.4389 fax 612/844 -9448 toll ,free 888/388.4:89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.