My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-12-21 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-12-21 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 3:44:47 PM
Creation date
8/22/2011 3:44:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1999 <br /> RATESCHEDULE <br /> HOURLY RATE <br /> CLASSIFICATION 199 % Inc 1999 <br /> Senior Principal $92.50 2.1% $94.50 <br /> Principal/Project Manager I Senior Scientist $83.00 1.8% $84.50 <br /> Registered Engineer /Architect I Natural Resource Specialist $72.00 2.0°0 $73.50 <br /> Project Engineer /Architect /Scientist � Senior Field Supervisor $63.00 23% $64.50 <br /> GIS Specialist I Senior Designer $62.00 2.4% $63.50 <br /> Graduate Engineer /Architect/Scientist I Field Supervisor $56.50 1.7% $57.50 <br /> Senior Draftsperson I Senior Inspector $51.00 1.9% $52.00 <br /> Inspector I Draftsperson I Senior Technician $47.50 2.1% $48.50 <br /> Technician $33.50 2.9% 534.50 <br /> Word Processor $33.00 2.9% $34.00 <br /> Total Station Equipment $20.00 <br /> GIS Workstation Equipment $20.00 <br /> GPS Equipment $50.00/half day <br /> Attendance at Regular Council Meeting $50.00 /mtg <br /> These rates are adjusted annually at the first of the year in accordance with the normal review <br /> procedures ofBonestroo, Rosene, Anderlik & Associates, Inc. <br /> Reimbursable Expenses - At Cost <br /> Reproduction, Printing, Duplicating, Mileage <br /> Out of pocket expenses such as stakes, field supplies, telephone calls, ect. <br /> City of Centerville <br />
The URL can be used to link to this page
Your browser does not support the video tag.