My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-10-14 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-10-14 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 12:23:28 PM
Creation date
8/23/2011 12:23:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Unit Quantity Amount <br /> No. hem Unit Quantity Price to Date to Date <br /> Schedule 1.0 Grading Erosion Control <br /> 1 Mobilization LS 1 $7,000.00 1 $7,000.00 <br /> 2 Common excavation LS 1 $45,000.00 0.85 $38,250.00 <br /> 3 Muck Excavation (EV) CY 1000 $2.00 100 $200.00 <br /> 4 Clear and Grub AC 0.5 $3,800.00 0.1 $380.00 <br /> 5 Remove exist. bituminous surface (P) SY 216 $2.00 216 $432.00 <br /> 6 Remove concrete sidewalk (P) SY 19 $4.00 $0.00 <br /> 7 Remove existing culverts EA 2 $300.00 2 $600.00 <br /> 8 Remove and salvage existing aggregate (P) CY 314 $4.85 314 $1,522.90 <br /> 9 Remove and salvage existing lime aggregate (P) CY 184 $2.50 184 $460.00 <br /> 10 Sift fence LF 1200 $1.75 500 $875.00 <br /> 11 Bale checks EA 45 $5.00 $0.00 <br /> 12 Timber check dams EA 9 $300.00 $0.00 <br /> 13 Temp. rock construction entrance (P) SY 45 $7.00 $0.00 <br /> 14 Riprap (Class 3) CY 8 $65.00 $0.00 <br /> Total Schedule 1.0 Grading Erosion Control $49,719.90 <br /> Schedule 2.0 Parking Area Improvements <br /> 15 Modified select granular borrow (P) CY 3530 $9.25 3530 $32,652.50 <br /> 16 Aggregate base, Class 5 TN 1805 $6.00 1736.55 $10,419.30 <br /> 17 Adjust sanitary sewer cleanout covers EA 3 $130.00 $0.00 <br /> 18 4 -inch perforated thermoplastic drain pipe with <br /> Type 1 geotextile sock LF 1500 $3.25 1200 $3,900.00 <br /> 19 4 -inch thermoplastic drain pipe LF 750 $3.25 $0.00 <br /> Total Schedule 2.0 Parking Area Improvements $46,971.80 <br /> Schedule 3.0 Turf Establishment <br /> 20 Seeding (Athletic turf mbo (P) AC 4.3 $2,400.00 $0.00 <br /> 21 Seeding AC 11.6 $1,700.00 $0.00 <br /> 22 Type 5 wood cellulose mulch (Athletic fields) (P) AC 4.3 $600.00 $0.00 <br /> 23 Mulching AC 11.6 $170.00 $0.00 <br /> 24 Wood fiber blanket SY 2000 $1.30 $0.00 <br /> Total Schedule 3.0 Turf Establishment $0.00 <br /> Change Order No. 1 <br /> Part A - Storm Sewer <br /> 1 15 inch RCP, Class 4 LF 680 $25.00 680 $17,000.00 <br /> 2 15 inch RCP, F.E.S. Class 4 EA 1 $600.00 1 $600.00 <br /> 3 27 inch diameter CB, incl. 4342 cstg. EA 1 $625.00 1 $625.00 <br /> 4 27 inch diameter CB, incl. 1642 cstg. EA 1 $1,250.00 1 $1,250.00 <br /> 5 4 foot diameter MH, incl. 4342 cstg. EA 1 $1,250.00 1 $1,250.00 <br /> 6 2'x 3' box CB 3067V cstg. EA 1 $1,250.00 1 $1,250.00 <br /> Total Part A - Storm Sewer $21,975.00 <br /> Part B - Hockey Rink <br /> 7 Subgrade Excavation (P) CY 1125 $1.60 1125 $1,800.00 <br /> 8 Modified select granular borrow (P) CY 975 $11.00 975 $10,725.00 <br /> 9 4 inch pert. thermoplastic drain pipe LF 900 $3.75 900 $3,375.00 <br /> Total Part B - Hockey Rink $15,900.00 <br /> Part C - Electrical <br /> 10 Relocate panel and associated work LS 1 $12,145.10 $0.00 <br /> Total Part C - Electrical $0.00 <br /> Total Schedule 1.0 Grading Erosion Control $49,719.90 <br /> Total Schedule 2.0 Parking Area Improvements $46,971.80 <br /> Total Schedule 3.0 Turf Establishment $0.00 <br /> Change Order No. 1 <br /> Total Part A - Storm Sewer $21,975.00 <br /> Total Part B - Hockey Rink $15,900.00 <br /> Total Part C - Electrical $0.00 <br /> Work Completed To Date $134,566.70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.