Laserfiche WebLink
13:15 661- 766 -e RICE CREEK U L� =ST PAGE 61 <br /> RICE CREEK WATERSHED DISTRICT Ce -1A4e- <br /> 3585 LEXINGTON AVE N SUITE 330 <br /> ARDEN HILLS MN 55126 -8056 <br /> Phone-(651)766-4101 Fax: (631) 766.4196 <br /> NOTICE OF PERMIT APPLICATION STATUS <br /> Date of this notice: September 25, 1998 Permit Application No: 98 -91 <br /> Applicant's Name & Address: Lake Area Utilities, 6995 20th Avenue S., Centerville, NiN <br /> 55038 <br /> FAXED TO APPLICANT AT 4294828. <br /> Project Location: West of 20th Avenue S and immediately south of Clearwater Creek, <br /> Centerville <br /> Purpose of Project: Land Development Plan for a single- family development to be known as <br /> Center Villa, 22 lots, 20± acres <br /> At their meeting on September 23, 1998, the Board of Managers of the Rice Creek Watershed <br /> District took the following action an your Permit Application: <br /> TABLE PENDING RECEIPT OF: <br /> 1. Narrative addressing wetland mitigation line extending within nongraded wetland areas <br /> (2, please). <br /> 2. 2 -year and 10 -year hydrologic calculations for replacement wetland (WCA requirement) <br /> (2 please). <br /> 3. Narrative addressing hydrologic susWnability of replacement wetlands (2 please). <br /> 4, Further review by District staff of wetland alteration/mitigation plan. <br /> 5. Revised grading plan specifying minimum 1 st floor elevation of Block 3 at 905.8 ( 3 sets, <br /> please). <br /> 6. Existing flood elevation of unnamed ditch/wetland complex at southeast property <br /> boundary (on 3 plans), <br /> 7. Revised preliminary plat specifying easements over all drainage swales, ponds, wetlands, <br /> and floedplain (902.9), including 100 feet from centerline of Clearwater Creek (3 sets, <br /> please), <br /> 8 Narrative addressing effect on upstream properties from proposed outlet control structure <br /> (w -inch orifice) installation at existing 24 -inch RCP under 20th Avenue South (2 <br /> copies). <br /> 9 Existing subwatershed boundaries and topographic contours (including all area tributary <br /> to the unnamed ditch/wetland complex at southeast property boundary) (on 3 plans). <br /> 10. Incorporation of in: lt'ation opportunities and BMPs (e.g., doughnut cul -de -sacs) (see <br /> brochure herewith). <br /> 1 I . Acquisition of drainage ponding and flowage easements up to an elevation of 899,1 for <br /> off -site areas south of the unnamed ditch/wetland complex. Please forward a draft <br /> decument (unsigned) for review by the District's attorney and engineer. See sample <br /> herewith. After approval, you may get signatures and return a signed copy to us, theta <br /> you may register it at the County. Following that, you will provide us official proof o: <br /> registration. <br /> 12. Completion of WCA 30-day public comment period <br /> 13. Copy Of MPCA NPOES application (2 copies, please). <br /> 14. Cash surety in an amount to be determined. This surety will be kept through final <br /> inspection to assure erosion control measures remain current as shown in plan and also <br />