My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-10-14 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-10-14 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 12:23:28 PM
Creation date
8/23/2011 12:23:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br /> October 8, 1998 <br /> To: Honorable Mayor and City Council <br /> From: Paul Palzer, Public Works Director/Building Official <br /> Re: Tractor Replacement <br /> The City has solicited bids for replacing the 1989 John Deere tractor. The City advertised <br /> in the paper and also sent quotes by fax to six dealers. We received one "No Bid" and one <br /> quote per the bid specifications. The quote was from Olson Power Equipment of North <br /> Branch for a Massey Ferguson 253x4 tractor. Mr. Dan Olson has informed me that he <br /> could supply a 263x4 tractor for the same price. The difference between the two tractors <br /> is that the 263 has five more horsepower and meets the more strigent California emission <br /> standards. <br /> We have spent over $1,500.00 dollars on repairs to the tractor so far this year and had to <br /> rebuild the valve bank last year. The hydrostatic transmission feels loose and may need <br /> extensive repairs in the near fixture. The City did receive a quote from Olson Equipment <br /> prior to the advertisement for bids and the more recent quote is a better bargain. <br /> I would like the Council to approve the purchase of the tractor and the implements per the <br /> quote except to upgrade the tractor to a 263 model at the same cost as a 253. The tractor <br /> would be delivered in about three to four weeks, except for the cab which will take eight <br /> to ten weeks for delivery. <br /> The $32,225.00 would come from the following funds as listed below: <br /> Street Budget 50% <br /> Storm Sewer Fund 20% <br /> Sanitary Sewer Fund 10% <br /> Water Fund 10% <br /> Park Budget 10% <br />
The URL can be used to link to this page
Your browser does not support the video tag.