My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-08-26 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
1998
>
1998-08-26 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 1:08:12 PM
Creation date
8/23/2011 1:07:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.,,imary and Recommendations <br /> The School Crossing /Gap Study indicates that adequate gaps in the traffic stream exist and that the <br /> percent of pedestrian delay time is at an acceptable level. No additional controls are recommended. <br /> The review and evaluation of existing traffic control devices has revealed several items not <br /> consistent with the manuals, policies, guidelines or operational practices used by this department. It <br /> is recommended that the courses of action listed in Table I of this report are carried out. <br /> The city or school district could consider the installation of school crossing flashers. However, <br /> because the warrants for additional controls at the crossing are not satisfied at this time, the <br /> construction and ongoing maintenance costs of these flashers would be the responsibility of the city <br /> and /or school district. <br /> Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.