Howard R, Green Company _ <br /> CONSULTING ENGINEERS te"U2lLe <br /> s90181wW rasp <br /> TOTAL PROJECT COSTS <br /> Site Work $15,727.50 <br /> Street $185,920.00 <br /> Bituminous Trail $4,857.50 <br /> Storm Sewer $54,535.00 <br /> Watermain $121,841.00 <br /> Sanitary Sewer $61,398.00 <br /> TOTAL PROJECT COST $444,279.00 <br /> ALTERNATES <br /> Eagle Pass Connection $27,692,50 <br /> Drain Tile Alternate $23,229.00 <br /> Sub -Total $50,921.50 <br /> TOTAL CONSTRUCTION COST $495 5 200.50 <br /> Overhead (30 %) $148 <br /> TOTAL PROJECT COST $643,760.65 <br /> 260089M -a ssessme nt. he a ring.d oc <br />